Amend_001_Question_from_05-18-2022_0001.pdf
PDF 585 KB Posted
- Attached to
- TX NECHES NWR MODULAR OFFICE RELOCATION Federal contract opportunity
- Solicitation number
- 140F0622Q0101
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0622Q0101_Amd_0001.pdf | ||
| Neches_River_NWR_Moving_Modular_Building_Bid_Schedule.pdf | ||
| B03_Cherokee_Co__Wage_Determination_2015-5277_REV__21_03152022.pdf | ||
| Sol_140F0622Q0101.pdf | ||
| B03_Anderson_Co_Wage_Determination_15-5811_rev_18_03152022.pdf | ||
| Modular_Office_Floor_Plan.pdf | ||
| Statement_of__work__for_modular_building_relocation_RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1 05-18-2022 Questions received and clarified RFQ 140F0622Q0101
1. Electrical – what is the distance from the electrical panel/sub panel to the new position of the modular unit? Will the electrical need to be run above ground? Will the Refuge provide the MDP, transformers, ground rods, meter?
The distance from the electrical panel to the modular unit is approximately 70 feet.
The electric will go below ground.
The MDP, transformers, ground rod and meter are provided and already installed.
2. Plumbing – what is the distance from the waste supply and waste tap to the new building position?
I will assume you mean water supply. The distance from the water well to the modular building is approximately 90 feet.
The distance from the septic tank to the modular building is approximately 90 feet in the opposite direction. The septic tank is not installed.
3. Lighting Protection – are there any further details available about this portion?
Please disregard the Lightning Protection System in the Alternate Bid Items Section.
4. Structure – is vinyl skirting an acceptable material?
Vinyl skirting is an acceptable option.
5. Means of Egress – are stairs and/or ramps required to be constructed or installed for the project?
The stairs are already attached to the building and are required for this project. They can be removed for transport and then reattached later.
Amendment 1 05-18-2022 Questions received and clarified RFQ 140F0622Q0101