Amend_001_Question_from_05-18-2022_0001.pdf

PDF 585 KB Posted

Attached to
TX NECHES NWR MODULAR OFFICE RELOCATION Federal contract opportunity
Solicitation number
140F0622Q0101
Issued by
Department of the Interior Fish and Wildlife Service

View the file

Other files for this federal contract opportunity

Other files attached to TX NECHES NWR MODULAR OFFICE RELOCATION, newest first.
File Type Posted
Sol_140F0622Q0101_Amd_0001.pdf PDF
Neches_River_NWR_Moving_Modular_Building_Bid_Schedule.pdf PDF
B03_Cherokee_Co__Wage_Determination_2015-5277_REV__21_03152022.pdf PDF
Sol_140F0622Q0101.pdf PDF
B03_Anderson_Co_Wage_Determination_15-5811_rev_18_03152022.pdf PDF
Modular_Office_Floor_Plan.pdf PDF
Statement_of__work__for_modular_building_relocation_RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1 05-18-2022 Questions received and clarified RFQ 140F0622Q0101

1. Electrical – what is the distance from the electrical panel/sub panel to the new position of the modular unit? Will the electrical need to be run above ground? Will the Refuge provide the MDP, transformers, ground rods, meter?

The distance from the electrical panel to the modular unit is approximately 70 feet.

The electric will go below ground.

The MDP, transformers, ground rod and meter are provided and already installed.

2. Plumbing – what is the distance from the waste supply and waste tap to the new building position?

I will assume you mean water supply. The distance from the water well to the modular building is approximately 90 feet.

The distance from the septic tank to the modular building is approximately 90 feet in the opposite direction. The septic tank is not installed.

3. Lighting Protection – are there any further details available about this portion?

Please disregard the Lightning Protection System in the Alternate Bid Items Section.

4. Structure – is vinyl skirting an acceptable material?

Vinyl skirting is an acceptable option.

5. Means of Egress – are stairs and/or ramps required to be constructed or installed for the project?

The stairs are already attached to the building and are required for this project. They can be removed for transport and then reattached later.

Amendment 1 05-18-2022 Questions received and clarified RFQ 140F0622Q0101

File details come from the government source that posted it. Updated .