SOC_Nulhegan_Basin_Gravel_Materials_SOW_0002.pdf
PDF 1 MB Posted
- Attached to
- NULHEGAN BASIN DIVISION - Gravel Materials
- Solicitation number
- 140F0421Q0072
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_140F0421Q0072_0004.docx | DOCX document | |
| Sol_140F0421Q0072_Amd_0004.pdf | ||
| Sol_140F0421Q0072_Amd_0003.pdf | ||
| Sol_140F0421Q0072_Amd_0002.pdf | ||
| Sol_140F0421Q0072_Amd_0001.pdf | ||
| PAST EXPERIENCE REFERENCES.pdf | ||
| SOC Nulhegan Auto Route Gravel Materials.pdf | ||
| Sol_140F0421Q0072.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
GRAVEL MATERIAL DELIVERY
FOR
NULHEGAN BASIN DIVISION
SILVIO CONTE NATIONAL FISH AND WILDLIFE REFUGE
Brunswick, VT
PART A – GENERAL INFORMATION AND INSTRUCTIONS
GENERAL DESCRIPTION OF WORK: Provide crushed gravel materials to the site listed below in 12 yard loads up to the specified dollar amount. The quantity of the material is an estimate and not guaranteed to be accurate/final, the contract is a “Not to Exceed” with a final dollar amount. The material will be called for on an as needed basis for a roadway construction project.
PART B – PERFORMANCE REQUIREMENTS
Delivery Site:
1. Nulhegan Basin Division- 5396 Route 105, Brunswick, VT 05905
Four Mile Road- Tailgate spread beginning approximately 4 road miles from Vermont Route 105 and continuing approximately 3.3 miles to the north. Furthest trucking distance is approximately 7.5 miles from Vermont Route 105.
Stone Dam Road- Tailgate spread along a one mile section of Stone Dam Road beginning approximately 3 road miles from Vermont Route 105. Furthest trucking distance is approximately 4 miles from Vermont Route 105.
Material Estimates:
1. 1-1/4” crushed aggregate (99% granite ledge) ~ 4,820 yards
Pricing Schedule:
1. Price Per Yard Delivered 1-1/4” crushed aggregate (99% granite ledge)
Material will be provided on an as-needed basis up to 180 yards per day during the primary operations in June 15 – August 30, 2021. The project is expected to run for a 10 week period during this time.
Coordination of deliveries will be done through refuge staff while the job is being completed. General refuge hours are 8AM
– 4PM Monday – Friday.
PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION
DOCUMENTATION AND REPORTING: Written ticket will be provided to refuge staff daily to ensure load counts and volumes are accurate. All local and state transportation regulations apply.
1. Station: Date:
Contact: Phone No:
2.
3.
4.
Tail Gate Spread Thickness:
5. MaxLoads: 15
MinLoads: 0
6.
7. NO X
NOTE:
8.
M-F 8A 4P
9.
M-F 8A 4P
10.
(A) (B) (C)
ROADWAY SURFACING MATERIAL
NOT TO EXCEED
Nulhegan Basin Division, Conte NFWR 6/3/2021
Darren Stover 302-222-7598
Material Description (i.e., gravel, aggregate, etc.): 1-1/4" crushed aggregate (99% granite ledge)
Total Tons/Yards Required: 4,820 yards
Check one or more: Stock Piled (Spot Dumped)
TBD
Maximum/Minimum Amount to be delivered daily:
Attach a delivery and/or local site map.
(Insert number of truck loads per day)
Are there State certified scales in the area? YES
If yes, weight tickets are required for each delivery.
If no, delivery must be by cubic yards.
The following shall be attached to the acquisition request:
Required commencement date for delivery:
Last date for delivery:
Local conditions (bridge restrictions, weather conditions, water levels, road flooding, etc.)
that may affect delivery: Operational needs and weather may impact delivery
June 15, 2021
August 30, 2021
Delivery Days/Hours (Closed Federal Holidays)
Delivery Days/Hours (Closed Federal Holidays) schedule.
A completed Roadway Surfacing Material Form Applicable Map List of suggested vendors with names, addresses and phone numbers.
X
PEANUT
DAM
LOWER TIN
SHACK
TIM
CARROLL
BROOK
UPPER TIN
SHACK
FOUR
MILE
LEWIS
POND
MCCONNELL
POND
EAGLES
NEST
BLACK
BRANCH
HENSHAW
ROAD
POWERLINE
ACCESS
LEWIS POND
OVERLOOK
STONE
DAM
NORTH BRANCH
TRAIL
LEPINE
CAMP
CANAL
£¤VT-105
0 2.5 51.25 Kilometers
0 1.5 30.75 Miles
PLEASE DO NOT BLOCK ROADWAY
TRUCKS HAVE RIGHT-OF-WAY
AT ALL TIMES
NO CELL SERVICE ON REFUGE
Silvio O. Conte National Fish and Wildlife Refuge Nulhegan Basin Division
VISITOR CONTACT
STATION
INFORMATION
KIOSK
WHEELCHAIR
ACCESSIBLE
PARKING AREA
LOCKED GATE
OVERLOOK
CAR-TOP ACCESS
DIVISION ROADS
PRIMARY
SECONDARY
UNMAINTAINED
PRIVATE, WITH
RIGHT-OF-WAY
HIKING TRAILS
NULHEGAN BASIN
DIVISION
PRIVATE W/
PUBLIC ACCESS
RIVER CORRIDOR
EASEMENT
STATE PARK
WILDLIFE
MANAGEMENT
AREA
This map is for illustrative purposes only. The accuracy of the data layers shown on this map are limited by the accuracy of the source materials. No warranty as to the accuracy or the usefulness of the data is expressed or implied.
REFUGE PHONE: 802-962-5240
| SOC+Nulhegan+Auto+Route++Gravel+Materials.pdf |
| Visitor Map_Nulhegan_PRIMARY |
File details come from the government source that posted it. Updated .