SOC Nulhegan Auto Route Gravel Materials.pdf
PDF 247 KB Posted
- Attached to
- NULHEGAN BASIN DIVISION - Gravel Materials
- Solicitation number
- 140F0421Q0072
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_140F0421Q0072_0004.docx | DOCX document | |
| Sol_140F0421Q0072_Amd_0004.pdf | ||
| Sol_140F0421Q0072_Amd_0003.pdf | ||
| Sol_140F0421Q0072_Amd_0002.pdf | ||
| SOC_Nulhegan_Basin_Gravel_Materials_SOW_0002.pdf | ||
| Sol_140F0421Q0072_Amd_0001.pdf | ||
| PAST EXPERIENCE REFERENCES.pdf | ||
| Sol_140F0421Q0072.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
GRAVEL MATERIAL DELIVERY
FOR
NULHEGAN BASIN DIVISION
SILVIO CONTE NATIONAL FISH AND WILDLIFE REFUGE
Brunswick, VT
PART A – GENERAL INFORMATION AND INSTRUCTIONS
GENERAL DESCRIPTION OF WORK: Provide crushed gravel materials to the site listed below in 12 yard loads up to the specified dollar amount. The materials will be delivered on an as needed basis on unfinished roads within a radius of 12 miles of the site listed below. The quantity of the material is an estimate and not guaranteed to be accurate/final, the contract is a “Not to Exceed” with a final dollar amount. The material will be called for on an as needed basis for a roadway construction project.
PART B – PERFORMANCE REQUIREMENTS
Delivery Site:
1. 5396 Route 105, Brunswick, VT 05905
Material Estimates:
1. 1-1/4” crushed aggregate ~ 5,819yards
Pricing Schedule:
1. Price Per Yard Delivered 1-1/4” crushed aggregate
Material will be provided on an as-needed basis up to 180 yards per day during the primary operations in June 1 – August 30, 2021. The project is expected to run for a 12 week period during this time.
Coordination of deliveries will be done through refuge staff while the job is being completed. General refuge hours are 8AM – 4PM Monday – Friday.
PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION
DOCUMENTATION AND REPORTING: Written ticket will be provided to refuge staff daily to ensure load counts and volumes are accurate. All local and state transportation regulations apply.
1. Station: Date:
Contact: Phone No:
2.
3.
4. X
Tail Gate Spread Thickness:
5. MaxLoads: 15
MinLoads: 0
6.
7. NO X
NOTE:
8.
M-F 8A 4P
9.
M-F 8A 4P
10.
(A) (B) (C)
ROADWAY SURFACING MATERIAL
NOT TO EXCEED
Nulhegan Basin Division, Conte NFWR 3/4/2021
Darren Stover 302-222-7598
Material Description (i.e., gravel, aggregate, etc.): 1-1/4" crushed aggregate
Total Tons/Yards Required: 5,819 yards of 1-1/4" crushed aggregate
Check one or more: Stock Piled (Spot Dumped)
TBD
Maximum/Minimum Amount to be delivered daily:
Attach a delivery and/or local site map.
(Insert number of truck loads per day)
Are there State certified scales in the area? YES
If yes, weight tickets are required for each delivery.
If no, delivery must be by cubic yards.
The following shall be attached to the acquisition request:
Required commencement date for delivery:
Last date for delivery:
Local conditions (bridge restrictions, weather conditions, water levels, road flooding, etc.)
that may affect delivery: Operational needs and weather may impact delivery
June 1, 2021
August 30, 2021
Delivery Days/Hours (Closed Federal Holidays)
Delivery Days/Hours (Closed Federal Holidays) schedule.
A completed Roadway Surfacing Material Form Applicable Map List of suggested vendors with names, addresses and phone numbers.
File details come from the government source that posted it. Updated .