Attach-5-Revised SOW-Readable_0001.pdf

PDF 822 KB Posted

Attached to
AZ-SAN BERNARDINO NWR-REPLACEMENT WELLS
Solicitation number
140F0221R0002
Issued by

View the file

Other files

File Type Posted
Attach-2-FINAL REVISED-2-Price sheets_0003.xlsx XLSX spreadsheet
Sol_140F0221R0002_Amd_0003.pdf PDF
Attach-1-REVISED SOW-2_0002.pdf PDF
Attach-2-REVISED-Price sheets_0002.xlsx XLSX spreadsheet
Sol_140F0221R0002_Amd_0002.pdf PDF
Sol_140F0221R0002_Amd_0001.pdf PDF
Attach-1-SOW.pdf PDF
Attach-2-Price Sheet.pdf PDF
Attach-3-Past Performance and Clauses.pdf PDF
Attach-4-DBA Min. Wage Rates.pdf PDF
Sol_140F0221R0002.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Well Replacement Project on the San Bernardino National Wildlife Refuge

Part 1 General Information

1. GENERAL: This is a non-personnel services contract to provide well drilling for the US Fish & Wildlife Service. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform abandonment of 3 wells and drilling of 3 replacement wells, on the San

Bernardino National Wildlife Refuge (NWR), as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: To fulfill the purpose of the refuge, the service must maintain critical aquatic habitat, in the form of many artificial ponds, for multiple Federally listed fish species. The current system heavily relies on artesian flows through refuge wells to maintain habitat. Given water usage in the local area and overall climate change, the artesian flow at the refuge is at risk; it is expected that the refuge artesian flows will continue to be at risk and efforts are underway to install larger capacity pumps on most refuge wells. Due to current concerns, and the old age of many wells, the refuge assessed all wells that support ponds by evaluating them with video equipment. The evaluation process revealed that the above wells are in need of replacement. The project will greatly improve upon the current system by providing the refuge with the security of having new stable wells provide water to critical habitat

1.3 Objectives:

• All bids must include a completed copy of the attached Contractor pricing sheet.

• Properly seal and abandon 3 wells per Arizona Dept. of Water Resources (ADWR) standards.

• Drill 3 new deep aquifer wells following the attached conceptual deep well design document. Exact locations to be discussed with refuge staff onsite.

• Accurately complete required ADWR forms, provide to refuge staff for review, and file with the state as required.

1.4 Scope: The contractor should access the area only during dry times and/or during times pre-approved by refuge staff. If the areas are too wet, they will not be able to work on the project areas, to minimize the damage to the refuge. Daily work reports will be completed by contractor and turned in to refuge staff.

1.5 Period of Performance:

The period of performance for well replacements should not overlap with monsoon seasons (typically July- September) and must be fully completed no later than June 2021, with a desired completion date of 12/31/2020.

1.6 General Information: Refuge access roads provide for one-way travel, and most are surfaced with base coarse material to provide vehicle access during all-weather conditions. No road construction will be needed. All equipment storage and environmental concerns will be addressed during project meetings.

1.6.1 Quality Control: NA

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: The Contractor is not required to perform work on these holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of sunrise to sunset, Sunday thru Saturday except Federal holidays at the Contractor’s option. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at San Bernardino NWR. Job site is approximately 16 miles east of Douglas, Arizona, on a graded dirt road. The nearest facilities are located in Douglas. The refuge lies in a remote area immediately adjacent to the international border of Mexico and the United States, and is fenced on all sides by barbed wire fence. Sierra Vista, Arizona is 65 miles west of the refuge and Tucson, Arizona, is 100 miles northwest of the refuge.

1.6.6 Type of Contract: The government will award a firm-fixed price.

1.6.7 Gate Locks: Vehicle access onto the refuge is restricted to refuge personnel, and contractors will be provided a key to the refuge padlock to allow access for this project. Initial access to the site will be arranged by refuge personnel.

1.6.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.9 Contracting Officer Representative (COR): The (COR) will be Tasha Harden. Her contact information is: 7628 N Hwy 191 Douglas AZ 85607, 520-368-6004. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.10 Key Personnel: The following personnel are considered key personnel by the government:

Contract Manager and Site Project Leader. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 am to 5:00 pm, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.6.11 Identification of Contractor Employees: All contract personnel attending meetings, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.12 Contractor Travel : Contractor will be responsible for all travel cost and scheduling of travel.

1.6.13 Other Direct Costs : At the contractor’s option, partial payments can be made to cover the cost of equipment and materials obtained by the contractor for this project. Final payment will be made upon Refuge acceptance following total completion of the project by the contractor. Upon completion and acceptance of all work and receipt of a proper invoice, the contractor will be paid the balance of the firmfixed-price of the contract.

1.6.14 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2 DEFINITIONS &

ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10.QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11.SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12.WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government may assist in clearing access for new well sites if needed.

3.2. Facilities: The Government will not provide and facilities for this contract.

3.3. Utilities: The Government will not provide any utilities for this contract.

3.4. Equipment: The Government will not provide any equipment for this contract

3.5. Materials: The Government will not provide any equipment for this contract

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.1.1 Equipment: The Contractor shall furnish all equipment to adequately preform the requested job.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

The contractor will conduct an initial site visit with refuge staff for access arrangements and to ensure proper identification of each area and well. Contractor and refuge staff will review well designs and Contractor will then mobilize their heavy equipment and rigs to abandon 3 wells and to drill 3 new wells.

Soil and ground disturbance is expected, however contractor should attempt to minimize impacts where possible.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable Federal and State regulations and laws applicable to this project.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. NA

ADPD471.tmp
Part 1 General Information
PART 2 DEFINITIONS & ACRONYMS
PART 3
PART 4
PART 5 SPECIFIC TASKS
APPLICABLE PUBLICATIONS
ATTACHMENT/TECHNICAL EXHIBIT LISTING