Attach-2-FINAL REVISED-2-Price sheets_0003.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
AZ-SAN BERNARDINO NWR-REPLACEMENT WELLS
Solicitation number
140F0221R0002
Issued by

View the file

Other files

File Type Posted
Sol_140F0221R0002_Amd_0003.pdf PDF
Attach-1-REVISED SOW-2_0002.pdf PDF
Attach-2-REVISED-Price sheets_0002.xlsx XLSX spreadsheet
Sol_140F0221R0002_Amd_0002.pdf PDF
Attach-5-Revised SOW-Readable_0001.pdf PDF
Sol_140F0221R0002_Amd_0001.pdf PDF
Attach-1-SOW.pdf PDF
Attach-2-Price Sheet.pdf PDF
Attach-3-Past Performance and Clauses.pdf PDF
Attach-4-DBA Min. Wage Rates.pdf PDF
Sol_140F0221R0002.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

price sheet

SBNWR Replacement Wells Price Sheet
Description of Task ItemNumber of unitsUnit PriceTotal Price

1 Insurance and payment performance bond 1 Limp Sum n/a

2 Mobilization to well site 1 Limp Sum n/a

3 Drill well 600 ft per well=1,800 TL feet

4400 ft of Blank Casing400 ft per well=1,200 TL Feet
5200 ft of Perforated Casing200 ft perwell=600 TL feet
6Provide & install Tacna Gravel Pack ( 1/8 x 1/4 in. mix)1 per well=3 Total
Provide & Install Borehole Seal - Bentonite ( 60 ft thick)1per well=3 Total

7 Provide & install borehole filler above borehole seal - local pea gravel ( 1/8 x 3/8 )

8Air - lift development of well
( Min. 750 cfm x 250 psi compressor package)12 hours per well= 36 Total Hours
9Wellhead completion, clean up well site,
fill in pits, etc .. , concrete pad.1 per well=3 Total

10 Fill and cap existing well, and properly file State paperwork 1 per well=3 Total

11Overhead %1 Limp Sum%
12Profit %1 Limp Sum%

TOTAL PRICE