Attachment 07 – Quote Sheet
Quote Form - Two Rivers NWR Small Arms Firing Range Removal
The decommissioning of a Small Arm Firing Range (SAFR) at Two Rivers NWR. The SAFR is located on the edge of the gravel shop yard in the south-east corner of the Two Rivers NWR building complex. The pile is of unknown age but is at least 25 years old based on aerial photos. The pile was historically used by LEO employees to target shoot; however, the amount of shooting or lead contamination has not been documented. The shooting area was abandoned several years ago, and the wood target cribbing was pushed into the face of the berm. The berm is approximately 30 Ft L X 20 Ft W X 6 Ft H. The firing line was approximately 25 yards from the face of the berm.
Small Arm Firing Range Removal.
The work includes but is not limited to: Site characterization via soil sampling; excavation and sieving approximately 30 cubic yards of soil for bullet and bullet fragments from the berms face; excavation and disposal of approximately 35 cubic yards of the entire berm and range as special waste, confirmation sampling via soil and groundwater sampling for metals; providing a written Corrective Action Completion Report (CACR); and obtain a “No Further Action” letter from the Illinois Environmental Protection Agency as part of the Site Remediation Program (35 Ill Adm Code Part 740.
Bid: $_____________
Additional Work as Required
Removal of Additional Contaminated Soil as Required based on sampling.
The contractor will provide a bid for excavation and disposal of additional contaminated material based on a Cubic Yard Price
Per Cubic Yard Price: $_____________
Additional Sampling if Required of Face of Berm in 3 Feet Increments.
The contractor will provide a bid for sampling face of berm if additional clearing sampling rounds are needed to document compliance with Illinois EPA standards. The contractor will provide a bid based on each sampling event.
Per Sampling Event: $_____________