This document is a Quality Assurance Surveillance Plan (QASP) for the Isleta Elementary School Furniture Replacement contract. The QASP establishes measurable performance standards and Acceptable Quality Levels (AQLs) against which the Government will evaluate Contractor performance throughout the project lifecycle.

The surveillance methods include 100% inspection of delivered and installed furniture at Government final acceptance, visual observation of furniture removal, installation, facility protection, cleanup, and safety practices, inventory verification to confirm quantities and configurations, functional checks of assembled components, documentation review of warranties and project closeout submissions, and reinspection to verify deficiency corrections. The Contractor is responsible for all quality control, and failure to satisfy an AQL does not relieve the Contractor of corrective action obligations. Performance standards require 100% conformance across twelve task categories: existing furniture removal (Government-designated items only), disposal/disposition per contract requirements, correct furniture delivery matching contracted specifications, complete assembly per manufacturer requirements, proper installation ensuring stability and service-readiness, correct placement in Government-designated locations without obstructing safety features, facility protection with no unresolved damage, packaging and debris removal, cleanliness of installed furniture and work areas, product condition with no damaged or defective items, deficiency correction within contractually established timeframes, warranty documentation provision, and safety compliance ensuring no obstruction of exits, accessible routes, fire protection equipment, or life-safety access. The Contracting Officer or Contracting Officer's Representative will document deficiencies and communicate corrective actions through authorized contract administration procedures, with contractor performance considered satisfactory when all standards and AQLs are met and identified deficiencies are resolved within the correction period.

View the file

Other files

File Type Posted
Attachment_2__Pricing_Schedule.xlsx XLSX spreadsheet
Attachment_4__IA_-_IEE_Representation_Form.pdf PDF
Attachment_1__Statement_of_Work.pdf PDF
Sol_140A2327Q0314.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Standards and Quality Assurance Surveillance Plan (QASP) For

Isleta Elementary School Furniture Replacement

The Government will evaluate Contractor performance against the measurable standards and Acceptable Quality Levels (AQLs). Surveillance may include:

1. 100% inspection of delivered and installed furniture at Government final acceptance.

2. Visual observation of furniture removal, installation, facility protection, cleanup, and safety practices.

3. Inventory verification to confirm furniture quantities, types, configurations, and assigned locations.

4. Functional checks of assembled furniture, adjustment mechanisms, casters, hardware, and other operable components.

5. Documentation review of warranty information, product information, disposal documentation when required, and project closeout submissions.

6. Review of the Deficiency Tracking Log and follow-up reinspection to verify that all identified deficiencies have been corrected before Government final acceptance.

The CO or COR will document observed deficiencies and communicate required corrective action through authorized contract administration procedures.

Contractor performance will be considered satisfactory when the applicable performance standards and AQLs are met and all identified deficiencies subject to correction are resolved within the contractually established correction period.

The QASP is a Government surveillance document and does not relieve the Contractor of responsibility for performing its own quality control or for meeting all contract requirements.

Failure to satisfy an AQL does not relieve the Contractor of responsibility for correcting the underlying nonconforming service or product.

Section 4 #

Task/Deliverable Performance Standard AQL Surveillance Method

4.2

Existing Furniture Removal

Government-designated items removed; no unauthorized items removed

100% Observation and inspection

4.3

Disposal/Disposition Designated items removed from Government property and disposition conducted in accordance with contract requirements

100% Documentation review and observation

4.4.

Correct Furniture Delivery

Furniture matches contracted product, quantity, size, configuration, color, finish, and assigned location

100% conforming at final acceptance

Inspection and inventory verification

4.6

Assembly Furniture completely and correctly assembled according to manufacturer requirements

100% at final acceptance

Inspection and functional check

4.6

Installation Furniture stable, level where applicable, correctly configured, and service-ready

100% at final acceptance

Inspection and functional check

4.7 Placement Furniture positioned in correct

Government-designated

100% at final acceptance

Inspection

QASP | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation room/location and does not obstruct required safety features

4.8 Facility Protection No unresolved Contractor-

caused facility or Government-property damage

100% Observation and inspection

4.9 Packaging/Debris

Removal

No Contractor-generated packaging or installation debris remains in affected areas at completion

100% Visual inspection

4.10 Cleanliness Installed furniture and affected

work areas are clean and service-ready

100% at final acceptance

Visual inspection

4.11 & 4.15

Product Condition No unresolved damaged, defective, incorrect, or incomplete products

100% at final acceptance

Inspection

4.11 & 4.15

Deficiency Correction

All deficiencies documented on the Deficiency Tracking Log are resolved within the contractually established correction period

100%at final acceptance

Reinspection

4.12 Warranty

Documentation

Required manufacturer and workmanship warranty information provided

100% Document review

Safety No Contractor-created condition blocks required exits, accessible routes, fire protection equipment, or other required life-safety access

100% Observation