Attachment_1__Statement_of_Work.pdf
PDF 207 KB Posted
- Solicitation number
- 140A2327Q0314
About this file
This is a Statement of Work for school classroom furniture replacement, removal, delivery, assembly, and installation services at Isleta Elementary School in Albuquerque, New Mexico.
The Bureau of Indian Education (BIE) seeks a Time-and-Materials contract to replace classroom furniture while minimizing disruption to school operations. The contractor must remove existing furniture (desks, chairs, tables, storage units, and similar items), handle lawful disposal or recycling, and deliver and install new replacement furniture. All work must be completed between May 31, 2027, and July 31, 2027. The contractor is responsible for providing all management, supervision, labor, transportation, material-handling equipment, tools, supplies, protective materials, and resources. Labor shall be priced using fully burdened hourly rates including wages, fringe benefits, overhead, and profit. The contract has a 12-month period of performance commencing upon award. The contractor must coordinate site access, verify delivery routes and room locations, unpack and inspect all products, assemble and install furniture according to manufacturer specifications, remove all packaging and debris, protect the facility from damage, and ensure all furniture is clean and service-ready before final acceptance. The scope includes correction or replacement of damaged, defective, or incorrectly delivered items; manufacturer warranty support; and contractor workmanship warranty for a minimum of one year following final acceptance.
Security requirements are substantial and require all contractor personnel to complete BIE background investigations with favorable or favorable provisional determinations before performing on-site work. Resumes/CVs must be submitted within two days of award, and initial security forms within five business days. Personnel with favorable clearance work independently; those with favorable provisional status must work under line-of-sight supervision (LOSS) with a maximum ratio of one favorable personnel to eight favorable provisional personnel. The contractor must establish controlled work areas, maintain entry/exit logs, and ensure no unauthorized contact between contractor personnel and students. Work hours are generally 7:30 AM to 4:00 PM Mountain Time, Monday through Friday, excluding federal holidays, though the Government may authorize work outside these hours to maintain schedule. Deliverables include project point-of-contact information, cleared personnel lists, security intake packages, site-specific supervision and access-control plans, daily site-access logs, delivery/installation coordination information, furniture installation documentation, existing furniture removal records, disposal documentation, deficiency tracking logs, warranty documentation, product information, care and maintenance instructions, keys and tools, and a final completion notification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2__Pricing_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_4__IA_-_IEE_Representation_Form.pdf | ||
| Attachment_3__QASP.pdf | ||
| Sol_140A2327Q0314.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SCHOOL CLASSROOM FURNITURE REPLACEMENT, REMOVAL, DELIVERY,
ASSEMBLY, AND INSTALLATION
1.0 BACKGROUND
The Bureau of Indian Education (BIE) is seeking contract services to support the replacement of classroom furniture at Isleta Elementary School (IES) located in Isleta Pueblo, New Mexico, approximately 10 miles south of Albuquerque, New Mexico. The BIE serves as a branch of the State Education Agency (SEA) responsible for providing educational services for several elementary and secondary schools and dormitories serving students across 23 states. The IES is operated by the BIE under the direction of the Associate Deputy Director, Bureau Operated Schools (ADD-BOS) and the Albuquerque Education Resource Center (ERC). The mission of the BIE is to provide quality education opportunities from early childhood through life in accordance with a tribe’s needs for cultural and economic well-being, in keeping with the wide diversity of Indian tribes and Alaska Native villages as distinct cultural and governmental entities. Further, the BIE is to manifest consideration of the whole person by considering the spiritual, mental, physical, and cultural aspects of the individual within his or her family and tribal or village context.
This requirement will be executed as a Time-and-Materials (T&M) contract. The Contractor shall provide all management, supervision, labor, tools, equipment, transportation, material-handling resources, incidental supplies, and other services necessary to perform the requirements of this Statement of Work.
Labor shall be priced using fully burdened hourly labor rates that include wages, fringe benefits, overhead, general and administrative expenses, and profit. All materials, furniture, supplies, equipment, transportation, disposal fees, freight, and other direct costs shall be included and invoiced in accordance with the terms and conditions of the contract. No travel reimbursement or mileage will be separately reimbursed unless expressly authorized by the Contracting Officer (CO).
The Contractor shall be responsible for planning, coordinating, and executing all required work in a manner that minimizes disruption to school operations, protects Government property, and ensures that all furniture is delivered, assembled, installed, and ready for occupancy and intended use by the Government within the required project schedule.
Isleta Elementary School (IES)
Isleta Elementary School (IES) located in Isleta Pueblo, New Mexico, approximately 10 miles south of Albuquerque, New Mexico. IES serves approximately 90 students in kindergarten through 6th grade. The vision of IES is to educate the whole child based on the core community values so each child has the knowledge and skills to be successful. Built in 2006, visual interconnectedness is what you will find as you walk through the doors of Isleta Elementary School. Every aspect of the school, from the tile colors and placement to the directional stationing of the front, help honor and set the representation of the rich cultural history and tradition of the Pueblo of Isleta, as viewed from their Elders, Parents, Staff Members, and Students.
2.0 OBJECTIVES
The purpose of this requirement is to provide a complete, turnkey classroom furniture replacement solution while minimizing disruption to school operations and protecting Government property. Existing classroom furniture and excess equipment, including desks, chairs, tables, and similar items, must be removed from designated locations and disposed of or otherwise handled in accordance with Government direction. Replacement furniture must be delivered, unpacked, assembled, installed, positioned in designated rooms, inspected, and placed into fully functional, ready-for-use condition. All cartons, pallets, plastic wrap, protective materials, and other delivery and installation debris must be removed from the
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
Government site. The contractor shall furnish all personnel, materials, equipment, travel costs, and services required to perform the work described herein. See attachment 2, product specifications for the furniture required for this project.
3.0 SCOPE
The Contractor shall provide all management, supervision, personnel, transportation, vehicles, material-handling equipment, tools, supplies, protective materials, incidental hardware, and other resources necessary to achieve the performance outcomes of this SOW, except for items specifically identified as Government-furnished.
The scope includes:
1. Coordination of furniture removal, delivery, assembly, installation, and final Government acceptance activities.
2. Removal of existing furniture and equipment designated by the Government.
3. Transportation and lawful disposal, recycling, or other approved disposition of designated excess furniture.
4. Delivery of new furniture to the designated school facility and final room locations.
5. Unpacking and inspection of delivered products.
6. Assembly and installation of new furniture.
7. Placement, leveling, adjustment, and functional verification of furniture.
8. Removal of all shipping, packing, assembly, and installation materials.
9. Protection of the facility and Government property during performance.
10. Correction or replacement of damaged, defective, incomplete, incorrectly delivered, or improperly installed furniture.
11. Manufacturer warranty support.
12. Contractor workmanship warranty support.
13. Project closeout documentation.
The scope does not include modification of the building, permanent utility relocation, structural alterations, electrical work, plumbing work, telecommunications work, or other construction unless expressly included elsewhere in the contract.
Furniture quantities, manufacturers, models, dimensions, colors, finishes, room assignments, and other product-specific requirements shall be established in the contract furniture schedule, contract line-item structure, or other contract documentation.
4.0 REQUIREMENTS / TASKS
4.1 Project Management and Coordination
a. Furniture removal, delivery, installation, and closeout activities shall be coordinated so that the project is completed within the contractual schedule without preventable interference with school operations.
b. The Contractor shall:
1. Designate a project manager (PM) and/or a responsible on-site lead with authority to coordinate contractor activities and resolve routine performance issues.
2. Coordinate site access, deliveries, removal activities, staging, installation, and final inspection with the Government-designated representative.
3. Verify access routes, loading areas, doorways, and room locations before scheduled delivery.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
4. Identify discrepancies that could prevent successful delivery or installation and notify the Contracting Officer (CO) or Contracting Officer Representative (COR) before proceeding with affected work.
5. Coordinate work so that exits, corridors, fire protection equipment, and required accessible routes remain unobstructed except for temporary movement necessary to perform the work.
6. Comply with all applicable BIE Human Resources Office (HRO), Personnel Security Branch (PSB) requirements governing background investigations for contractor and subcontractor personnel working at BIE-operated facilities. See Section 7.0 Security Requirement for additional information.
4.2 Removal of Existing Furniture and Equipment
a. All furniture designated by the Government for removal shall be removed from its assigned location without unauthorized removal of Government property and without damage to Government facilities.
b. Furniture may include:
• Student desks.
• Student chairs.
• Desk/chair combination units.
• Classroom and activity tables.
• Teacher desks.
• Teacher chairs.
• Workstations.
• Cabinets.
• Bookcases.
• Shelving.
• Storage units.
• Stools.
• Other classroom furniture identified by the Government.
c. Only furniture designated by the Government for removal shall be removed from Government control.
d. Furniture identified by the Government for retention shall remain Government property and shall be placed at the Government-designated on-site location.
4.3 Disposal, Recycling, and Disposition
a. All items designated for off-site disposition shall be removed from Government property and lawfully disposed of, recycled, donated, or otherwise processed in accordance with the contract and applicable law.
b. The Contractor shall:
1. Provide transportation necessary for off-site disposition.
2. Bear all hauling, landfill, recycling, tipping, and other disposal costs included within the contract price.
3. Use lawful disposal or recycling facilities.
4. Not use Government dumpsters or waste containers for furniture or project debris unless expressly authorized by the Government.
5. Not abandon removed furniture or project debris on Government property.
6. Furnish evidence of disposal, recycling, or other disposition when identified as a required deliverable.
c. Disposition of Government property shall occur only in accordance with Government direction and applicable contract requirements.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
4.4 Delivery of Replacement Furniture
a. All required replacement furniture shall be delivered to the correct Government facility and assigned room or final placement location in the correct quantity, model, configuration, size, color, and finish specified by the contract.
b. Unless otherwise stated in the contract, delivery shall include inside delivery to the final designated room.
c. Curbside delivery, dock-only delivery, or delivery solely to a central staging point does not satisfy this requirement unless specifically authorized by the Government.
d. The Contractor shall provide sufficient labor and material-handling resources to unload and transport furniture safely through the facility.
4.5 Product Condition and Conformance
a. All replacement furniture accepted by the Government shall be new, unused, complete, functional, and free from unacceptable damage or manufacturing defects.
b. Furniture shall conform to the contract's approved:
• Manufacturer and model, where specified.
• Product type.
• Dimensions.
• Configuration.
• Color.
• Finish.
• Accessories.
• Quantity.
c. Furniture shall not contain unsafe sharp edges, exposed hazardous fasteners, unstable components, cracks, material failures, or defects that prevent normal intended use.
d. The Contractor shall not furnish an alternate manufacturer, model, configuration, finish, or other product substitution unless authorized in accordance with the contract.
4.6 Unpacking, Assembly, and Installation
a. All replacement furniture shall be completely unpacked, correctly assembled, installed, adjusted, and capable of immediate intended use.
b. The completed installation shall include, when applicable:
• Furniture bases.
• Legs.
• Tops.
• Shelves.
• Handles.
• Casters.
• Glides.
• Modesty panels.
• Brackets.
• Connectors.
• Manufacturer-provided hardware.
• Accessories included with the contracted product.
c. Assembly and installation shall conform to manufacturer instructions.
d. All fasteners shall be properly installed and tightened. Adjustable products shall operate through their intended adjustment ranges. Furniture shall be stable and level when positioned on the intended floor surface.
e. Furniture shall not be left partially assembled at Government final acceptance.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
4.7 Furniture Placement
a. Furniture shall be located in the room and position designated by Government-provided furniture schedules, room assignments, layouts, or authorized Government direction.
b. Installed furniture shall not obstruct:
• Required exits.
• Doors.
• Accessible routes.
• Fire extinguishers.
• Fire alarm equipment.
• Electrical panels.
• Required HVAC access.
• Required emergency egress.
• Other building safety systems.
4.8 Facility and Property Protection
a. Government facilities and property shall remain free from Contractor-caused damage.
b. The Contractor shall protect floors, carpet, walls, corners, doors, door frames, elevators, windows, casework, fixtures, and other surfaces exposed to furniture movement and installation activities.
c. Any Contractor-caused damage shall be reported to the Government and restored to the pre-performance condition at no additional cost to the Government.
4.9 Packaging and Debris Removal
a. Upon completion of installation activities, the affected school areas shall contain no Contractor-generated packaging or installation debris.
b. The Contractor shall remove from Government property all Contractor-generated:
• Cartons and cardboard.
• Pallets.
• Plastic wrap.
• Foam.
• Strapping.
• Wood blocking.
• Protective packaging.
• Bags.
• Hardware packaging.
• Shipping materials.
• Installation debris.
c. Waste shall not be left in classrooms, corridors, loading areas, exterior staging areas, or parking areas.
4.10 Cleaning and Service-Ready Condition
a. At completion, each installed furniture item and affected installation area shall be clean and service-ready.
b. Furniture shall be free of:
• Shipping labels not intended to remain on the product.
• Temporary markings.
• Dust.
• Fingerprints.
• Packing residue.
• Adhesive residue.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
• Installation debris.
c. Manufacturer identification, safety labels, compliance labels, and other permanent product markings shall not be removed.
4.11 Damaged, Defective, Missing, or Incorrect Furniture
a. No damaged, defective, incomplete, incorrect, or improperly installed furniture shall remain unresolved at Government final acceptance.
b. Deficiencies include:
• Freight damage.
• Concealed damage.
• Scratches.
• Dents.
• Chips.
• Cracks.
• Incorrect models.
• Incorrect sizes.
• Incorrect colors or finishes.
• Missing components.
• Missing accessories.
• Instability.
• Improper assembly.
• Improper installation.
• Manufacturing defects.
c. The Contractor shall repair or replace deficient items without additional cost to the Government when the deficiency is attributable to the Contractor, its supplier, carrier, manufacturer, or subcontractor.
d. Repair or field modification that changes product appearance, structural integrity, safety characteristics, or warranty coverage shall not be used in lieu of replacement without Government approval.
4.12 Manufacturer Warranty
a. All furniture shall be supported by the applicable manufacturer's commercial or institutional warranty provided with the contracted product.
b. The Contractor shall provide warranty documentation identifying, at a minimum:
• Manufacturer.
• Covered product or product family.
• Warranty duration.
• Covered defects.
• Exclusions.
• Warranty claim procedures.
• Warranty contact information.
c. Warranty coverage shall include all coverage provided by the manufacturer for the furnished product and shall not be reduced by the Contractor.
4.13 Contractor Workmanship Warranty
a. The Contractor shall warrant its assembly and installation workmanship for a minimum of one year following Government final acceptance.
b. The workmanship warranty shall cover deficiencies resulting from Contractor-performed:
• Assembly.
• Installation.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
• Fastening.
• Adjustment.
• Leveling.
• Placement.
• Installation of hardware or accessories.
c. Valid workmanship warranty deficiencies shall be corrected without additional labor, travel, freight, delivery, assembly, or installation charges to the Government.
d. The Contractor workmanship warranty shall be in addition to applicable manufacturer warranties.
4.14 Warranty Administration
a. The Government shall have an identified process for obtaining warranty correction without independently coordinating ordinary warranty logistics between the Contractor and manufacturer.
b. For valid warranty claims within the Contractor's contractual responsibility, the Contractor shall coordinate applicable:
• Manufacturer communications.
• Replacement parts.
• Replacement furniture.
• Shipping.
• Removal of defective items.
• Delivery.
• Reassembly.
• Reinstallation.
c. Warranty repairs or replacements covered under the applicable warranty shall not result in additional covered freight, delivery, assembly, or installation charges to the Government.
4.15 Final Inspection and Deficiency Correction
a. The project shall not be considered complete until all furniture and associated services conform to contract requirements.
b. The Government may conduct a final inspection and identify deficiencies.
c. The Contractor shall correct Government-identified deficiencies within the correction period established by the contract, delivery order, or CO.
d. Government final acceptance requires:
1. Delivery of all required furniture.
2. Complete assembly and installation.
3. Correct room placement.
4. Removal or other authorized disposition of designated existing furniture.
5. Removal of packaging and Contractor-generated debris.
6. Resolution of damaged, defective, missing, or incorrect products.
7. Correction of installation deficiencies.
8. Correction of Contractor-caused facility damage.
9. Completion of required closeout documentation.
e. Government occupancy, use, invoice processing, or partial payment does not constitute acceptance of latent defects or otherwise waive Government rights under the contract.
5.0 GENERAL REQUIREMENTS
5.1 PERFORMANCE LOCATION
Physical Address: 1000 Moon Light Drive SW, Albuquerque, New Mexico 87105
Work shall be performed at the school location and at Contractor-controlled or third-party locations
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation necessary for transportation, recycling, disposal, or other authorized off-site activities, unless otherwise arranged with the school Principal and Contracting Officer Representative (COR).
5.2 WORK HOURS
a. The Contractor is responsible for determining the labor hours, staffing levels, sequencing, and resources necessary to meet all contract requirements and completion milestones. The Government does not guarantee a minimum number of Contractor labor hours.
b. Work shall generally occur between 7:30 AM and 4:00 PM Mountain Time, Monday through Friday, excluding Federal holidays and other days when the facility is closed, unless otherwise coordinated and approved by the Government.
c. The Government may authorize work outside normal core hours, including early mornings, evenings, or weekends, when necessary to maintain the project schedule, accommodate deliveries, minimize interference with school activities, or achieve the required completion date.
d. The Contractor shall coordinate all on-site work, deliveries, staging, removal activities, and room access with the Government-designated representative.
e. The Contractor shall maintain sufficient staffing and resources throughout the period of performance of this contract.
f. The Contractor shall not perform on-site work outside authorized work periods without prior Government approval.
5.3 PERIOD OF PERFORMANCE
The period of performance is for twelve (12) months and shall commence on the award of contract.
The Contractor shall complete all furniture removal, delivery, assembly, installation, relocation, cleanup, and related activities between May 31, 2027, through July 31, 2027, to ensure the school is fully furnished and ready for occupancy and operational use the contractors will submit a timeline, including but limited too: background checks; ordering items; delivery of items; acceptance of items; removal/disposal of items; assembly of items; installation of items. Dates shall be estimated times for related workload for this requirement, knowing that the background check(s) and the line-of-sight supervision (LOSS) must be initiated at time of award. There shall be at least one (1) lead personnel, usually the project manager (PM) who has been fully vindicated on-site at all times. The contractor will have two (2) days after award to submit all employees resumes/CVs.
6.0. GOVERNMENT-FURNISHED INFORMATION (GFI)
The Government will provide applicable information incorporated into the contract, which may include:
• Furniture schedule.
• Furniture quantities.
• Room assignments.
• Approved furniture selections.
• Room layouts when available.
• Identification of existing furniture designated for removal.
• Identification of existing furniture designated for Government retention.
• Authorized delivery and installation windows.
• Site access procedures.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
7.0 SECURITY REQUIREMENTS
The Contractor shall conduct all work in a manner that protects the health, safety, and security of students, staff, visitors, and school property. Contractor personnel shall comply with all BIE security requirements, maintain controlled access to work areas, prevent unauthorized contact with students, and ensure that all work activities are performed within a secure and supervised environment. These measures must comply with all applicable federal laws, regulations, and policies.
The Contractor shall ensure that a sufficient number of its supervisory employees, employees, subcontractors, and agents complete the required background investigation and receive a favorable and/or favorable provisional determination from the BIE HRO/PSB before serving as cleared personnel under this section. Personnel who have received a favorable and/or favorable provisional determination are referred to in this SOW as Cleared Personnel. A favorable clearance is when that individual is fully vindicated and does not need to work under line-of-sight supervision (LOSS). A favorable provisional is an individual who must work under line-of-sight supervision by one who has favorable clearance.
7.1 Contractor Responsibilities
a. Prioritize the background check process immediately after contract award. The background check directly influences the start of services.
b. Actively coordinate with the COR to ensure timely and complete submission of all required documentation. To begin the background checks the contractor’s personnel shall submit their resumes/CVs to the COR. The contractor’s employees shall provide their resumes/CVs within two (2) days of award.
c. Contractor employees are to monitor and track the progress of Personnel Security (PERSEC) Intake Package(s) and respond promptly to any requests for additional information.
d. Maintain communication with the COR and provide updates as needed.
e. Before beginning on-site work, the Contractor shall:
1. Identify the personnel proposed to serve as favorable and/or favorable provisional. The COR will receive a notice for those individuals who have been cleared from PERSEC.
The contractor will be notified, and it’s the contractor’s responsibility to track cleared personnel.
2. Initiate and complete the applicable BIE background-investigation process for those individuals.
3. Receive confirmation of a favorable and/or favorable provisional determination before representing an individual as Cleared Personnel.
4. Provide the CO or COR with the names of Cleared Personnel assigned to the project.
5. Submit a site-specific supervision and access-control plan describing:
i. The anticipated number of favorable and/or favorable provisional Personnel;
ii. How the Contractor will maintain the required staffing ratio;
iii. How line-of-sight supervision (LOSS) will be maintained;
iv. The physical barriers and access controls to be used;
v. The designated entrances and exits;
vi. Procedures for accessing classrooms or other occupied school areas; and
vii. Procedures for preventing contact or interaction between Non-Cleared Personnel and students.
f. Ensure that personnel designated as cleared personnel do not serve in that capacity until the BIE
HRO/PSB issues a favorable and/or favorable provisional determination. Favorable provisional
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation personnel may access school property only when all supervision, staffing-ratio, access-control, escort, and student-separation requirements of this section are satisfied, otherwise known as line-of-sight supervision (LOSS).
g. The Contractor shall promptly notify the CO or COR of any change affecting the availability or status of assigned Cleared Personnel. The contractor shall not continue work with favorable provisional personnel unless the required favorable personnel, supervision, ratio, and site controls remain in place.
7.2 Background Check Process
a. Initiation. Upon contract award, the COR will initiate the background check process with the contractor’s designated Project Manager. The COR will provide Government-issued forms, submission instructions, and coordination support. The Contractor and its employees remains responsible for the completeness, accuracy, and timely submission of all Contractor Personnel documentation.
b. PERSEC Intake Package. The COR will issue a Personnel Security (PERSEC) Intake Package for each personnel requiring clearance. This package includes:
1. Required Forms (All Applicants Must Complete):
i. Intake Coversheet
ii. Authorization for Release of Information (AFR)
iii. Applicant Screening Questionnaire for Indian Children (ASQ)
iv. Fair Credit Reporting Release (FCRR)
v. Noncriminal Justice Applicant’s Privacy Rights (FPAR)
vi. OPM General Release Form (REL)
vii. Declaration for Federal Employment, Optional Form 306 (OF-306)
viii. Places Applicant Lived (PAL)
2. Additional Forms - The COR will review the PAL form and notify the Contractor of any additional required forms. Based on the completed PAL form, additional documentation may be required, including:
i. Local Law Enforcement Inquiry (LLEI)
ii. Navajo Nation Authorization for Release of Information (NN-LLEI) – if applicable
iii. State-specific background check forms (e.g., notarized releases, fingerprint authorizations)
iv. Copy of State-Issued Driver’s License
v. Fingerprint Cards – SF-87 or FD-258
c. Submission Process. The Contractor shall follow the steps below to ensure timely and accurate submission of required personnel security documentation:
1. Initial Submission to COR. The Contractor must email all completed forms in PDF format to the Contracting Officer’s Representative (COR) for review. The COR will verify the completeness and accuracy of all submitted documents.
2. Mailing of Original Documents. After COR approval, the Contractor or Contractor Personnel must mail the original signed documents, fingerprint cards, and all supporting materials to the BIE HRO/PSB in Albuquerque, NM using a trackable shipping method (e.g., FedEx, USPS, UPS). The COR will provide the official mailing address.
3. Tracking Number Requirement. The Contractor must provide the COR with the shipment’s tracking number, which is required for the COR to complete the electronic intake submission.
4. Electronic Intake Submission. Upon receipt of the tracking number, the COR will electronically submit the intake package to the BIE HRO/PSB to initiate the background investigation process.
d. BIE Background Investigation. Upon acceptance of the package intake by the BIE HRO/PSB, a BIE Personnel Security Officer will be assigned to the Contractor Personnel’s case and will work
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation directly with the Contractor Personnel to complete the investigation. All communication from this point forward will occur between the Contractor Personnel and the BIE Personnel Security Officer. There are two key steps the Contractor Personnel must complete promptly when notified by BIE PER SEC:
• Step 1: US Access Fingerprinting Appointment. The Contractor Personnel must schedule and complete a fingerprinting appointment at a nearby US Access enrollment site. Once the appointment is completed, he/she must notify the BIE HRO/PSB to confirm completion.
• Step 2: e-Application (e-APP) Submission. After fingerprinting is confirmed, BIE HRO/PSB will release access to the e-Application (e-APP). This is a time-sensitive online form. Contractor Personnel shall allow sufficient time to complete the e-APP accurately and shall submit it by the deadline established by BIE HRO/PSB.
e. Ongoing Communication and Oversight. Once the background investigation is submitted, the COR will keep the Contractor informed of progress and any follow-up requirements, so the Contractor can work with the Contractor Personnel. Timely completion of these steps is essential to avoid delays in onboarding and service delivery.
f. Timelines. The Contractor should plan for an overall background-investigation process of approximately 60 calendar days. BIE HRO/PSB processing typically requires four (4) to six (6) weeks after receipt of a complete package and completion of all required applicant actions. These timeframes are estimates and do not guarantee clearance by a particular date. To support timely onboarding and ensure compliance with federal security requirements, Contractor Personnel must adhere to the following timeline:
• Resumes/CVs: Contractor personnel must submit their resumes/CVs within two (2) days after contract award.
• Initial Forms Submission: Contractor personnel must submit all required initial forms within five (5) business days of contract award.
• Additional Documentation: Any additional documentation requested based on the Places Applicant Lived (PAL) must be submitted within five (5) business days of the request.
• Completion of Required Steps Initiated by BIE HRO/PSB: Contractor personnel must complete the two steps promptly once initiated by the BIE HRO/PSB
i. Step 1: Schedule and complete a US Access fingerprinting appointment
ii. Step 2: Complete and submit the e-Application (e-APP)
7.3 Staffing and Supervision
a. Whenever favorable provisional personnel are present at the work site, the Contractor shall:
1. Maintain at least one (1) on-duty favorable personnel member at the site.
2. Ensure that favorable provisional personnel remain under the direct supervision and responsibility of favorable personnel.
3. Maintain a ratio not exceeding one (1) favorable personnel member for every eight (8) favorable provisional personnel, or 1:8 under LOSS.
4. Keep all favorable provisional personnel within the clear line of sight of favorable personnel at all times.
5. Ensure that favorable provisional personnel have no unauthorized contact or interaction with students.
b. The Contractor may use a more restrictive staffing ratio when required by the location, layout, number of work areas, or other project conditions. Under no circumstances shall the Contractor exceed the 1:8 maximum ratio.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
7.4 Controlled Work Area
a. When students are present at the facility, the Contractor shall establish and maintain a secure and controlled work area that prevents unauthorized access and separates contractor personnel from students.
b. For exterior work, the Contractor shall fully enclose the work site with a fence at least six feet in height. When fencing is not feasible because of the project’s location or circumstances, the Contractor shall provide alternate physical barriers or access controls sufficient to keep favorable provisional personnel within a secure area where their movements can be monitored by designated favorable personnel.
c. For classroom or interior work, the Contractor shall use appropriate physical and administrative controls, which may include locked or controlled doors, temporary partitions, barricades, restricted corridors, warning signage, controlled entry points, or work scheduling approved by the school. The controls shall prevent students and unauthorized persons from entering the work area and shall allow favorable personnel to continuously monitor favorable provisional personnel.
d. The Contractor shall maintain safe work areas and shall not leave tools, furniture, packaging, strapping, fasteners, or other materials in a condition that creates an avoidable trip, cut, falling-object, or egress hazard.
7.5 Access to School Buildings and Occupied Areas
a. The Contractor shall plan and execute the work to eliminate, to the greatest extent practicable, the need for favorable provisional personnel to enter areas where students are present.
b. If a favorable provisional personnel member must enter a building or area where students may be present, that individual shall:
1. Be escorted by a favorable personnel at all times.
2. Obtain any required work pass and identification badge from the school’s administrative office.
3. Display the issued badge visibly on the exterior of their clothing at all times.
4. Remain within clear line of sight of the escorting favorable personnel.
5. Proceed only to the authorized work location and leave the student-occupied area immediately after completing the authorized activity.
c. Favorable provisional personnel shall not move unescorted through classrooms, hallways, cafeterias, gymnasiums, playgrounds, student restrooms, or other areas where students may be present.
7.6 Entry and Exit Control
a. The Contractor shall control all entrances and exits to the work area. Favorable personnel shall be stationed at each active entry or exit point, or the Contractor shall implement another approved method that keeps all favorable provisional personnel within clear line of sight and under continuous monitoring.
b. The Contractor shall maintain an accurate daily record of its employees, subcontractors, and agents entering the work area. Upon request, the Contractor shall provide the record to the Contracting Officer, Contracting Officer’s Representative, and designated school representative.
7.7 Subcontractors
All requirements of this section apply equally to subcontractors and their personnel. The Contractor is responsible for ensuring subcontractor compliance and shall incorporate these requirements into every applicable subcontract.
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
7.8 Noncompliance
a. The Contractor shall ensure that all employees, subcontractors, and agents understand these requirements and the consequences of noncompliance. Any Contractor Personnel who fails to comply may be immediately removed from the work site and may be banned from BIE premises where students are present.
b. Failure to maintain the required cleared-personnel ratio, line-of-sight supervision (LOSS), escort, identification, or site-security controls may result in suspension of the affected work until the Contractor restores compliance. Any delay or additional cost caused by the Contractor’s failure to comply shall be the Contractor’s responsibility, subject to the terms and conditions of the contract.
8.0 DELIVERABLES
Deliverable Required Content / Format Frequency Due Date Project Point-of- Contact Information
Name and contact information for Contractor project manager/on-site lead;
electronic format
Once Immediately upon contract award
List of proposed Cleared Personnel
Name and job title for each proposed Cleared Personnel; electronic format
Once and when revised
Within 5 business days after award
Personnel Security (PER SEC) Intake packages
Complete PER SEC Intake package for each proposed Cleared Personnel; single PDF file for each personnel
Once and when revised
Within 5 business days after receipt of Government forms
Favorable Determination from
BIE HRO/PSB
Documentation issued by the BIE HRO/PSB indicating a favorable determination for Contractor personnel designated as Cleared Personnel under the contract.
Once per applicable employee and as personnel change
Prior to the employee performing work as Cleared Personnel
Favorable Provisional Determination from
BIE HRO/PSB
Documentation issued by the BIE HRO/PSB indicating a favorable provisional determination for Contractor personnel designated as Cleared Personnel under the contract and works under the line-of-sight supervision
(LOSS).
Once per applicable employee and as personnel change
Prior to the employee performing work as Cleared Personnel
Site-Specific Supervision and Access-Control Plan
Written plan identifying Cleared Personnel, supervision procedures, staffing ratios, access-control measures, work areas, delivery routes, staging locations, escort procedures, and methods for preventing unauthorized contact with students; electronic PDF format
Once and updated as necessary
Not less than 10 business days before on-site performance
Daily Site-Access Log
Record identifying each Contractor employee, subcontractor, and agent entering the work area, including name, company affiliation, Cleared or Non-
Maintained each day on-site work is performed
Available for inspection during performance and
Statement of Work | School Classroom Furniture Replacement, Removal, Delivery, Assembly, and Installation
Cleared Personnel status, arrival time, departure time, assigned work area, and supervising Cleared Personnel, when applicable. The Contractor shall maintain the log electronically or in hard copy and provide it to the CO, COR, or designated school representative upon request.
submitted upon request
Delivery/Installation Coordination Information
Planned delivery and installation sequence and identification of material access constraints; electronic format
Once and when revised
Before scheduled delivery
Furniture Installation Complete furniture delivered, assembled, installed, clean, and service-ready
Once per furniture item/location
Prior to Government final acceptance
Existing Furniture Removal
Designated furniture removed and disposition completed
Once per designated item/location
Prior to Government final acceptance
Disposal/Recycling Documentation
Disposal tickets, recycling records, donation records, or equivalent documentation when required by the contract; electronic format
Once At project closeout and prior to Government final acceptance
Deficiency Tracking Log
Log identifying each Government-issued deficiency, date identified, corrective action taken, date corrected, and current status. Electronic spreadsheet or PDF format.
Updated as required
Submitted upon completion of all corrective actions and prior to Government final acceptance
Manufacturer Warranty Documentation
Manufacturer warranty terms and claim information; electronic format
Once At project closeout
Contractor Workmanship Warranty
Written confirmation of minimum one-year installation/workmanship warranty;
electronic format
Once At project closeout
Product Information Manufacturer and model information for installed furniture; electronic format
Once At project closeout
Care and Maintenance Information
Manufacturer-provided care and maintenance instructions, when furnished for the product; electronic format
Once At project closeout
Keys and Special Manufacturer Tools
Keys and manufacturer-supplied adjustment tools associated with installed furniture
Once At project closeout
Final Completion Notification
Written notification that all work and identified deficiencies are complete;
electronic format
Once Upon completion of all contract requirements
File details come from the government source that posted it. Updated .