Attachment_12_Questions_and_Answers_Log-JEVED-C_Goelz-2026-06-04_0002.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 140A2326R0023
About this file
This is a Questions and Answers Log for Solicitation 140A2326R0023 (Playground and Flood Prevention - Havasupai Elementary), issued by the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education. The document addresses contractor inquiries received on June 4, 2026, with responses provided by Contracting Officer C. Goelz on June 4-5, 2026.
The log contains three substantive Q&A entries clarifying critical project requirements and contractor responsibilities. Regarding temporary power, the Government has not confirmed availability of generators or dedicated power sources capable of supporting two 120-amp connections; contractors must verify their own power needs and provide temporary generators if required, with any connections to existing electrical systems requiring written Contracting Officer approval and coordination with school facility staff. For lodging and logistical support, the Government has not confirmed availability; contractors are responsible for arranging lodging, transportation, meals, and coordinating site access and work hours with the Government before mobilization, with use of school facilities for accommodations prohibited unless expressly approved in writing. Regarding helicopter transportation from Long Mesa, the Havasupai Tribal Council rate letter (dated April 2, 2026) specifies cargo rates of $2 per pound and one-way sling rates of $1,000 for 206 aircraft and $1,500 for 407 aircraft, though payload capacity and aircraft availability must be verified by the contractor with the helicopter operator; contractors remain fully responsible for all transportation logistics and associated costs.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Questions and Answers Log for Solicitation # 140A2326R0023
| Number | Date Received | Contractor | Question | Date Sent to COR | Answer | Date Answered |
| 1 | 6/4/26 | JEVED | Will generators available or a power source that will allow to draw 120amps x 2? | 6/3/26 | Government-furnished generators or a dedicated temporary power source capable of supporting two 120-amp connections have not been confirmed. The Contractor shall not assume that the school’s existing electrical system can support this load. |
The Contractor is responsible for verifying temporary power needs, including voltage, phase, amperage, connection type, duration of use, and load characteristics. If temporary power exceeding available site capacity is required, the Contractor shall provide temporary generators or other temporary power equipment as part of the work, unless otherwise directed by the Contracting Officer.
Any connection to existing site or building electrical systems shall be coordinated with the Government and school facility staff and shall not occur without written approval. Connections shall be performed by qualified personnel and shall not disrupt school operations or existing building systems. C.Goelz 6/4/2026 2 6/4/26 JEVED Will lodging be available for the constrcution team? 6/4/26 Government-furnished lodging has not been confirmed and shall not be assumed. The Contractor is responsible for arranging lodging, transportation, meals, and related logistical support for its personnel unless the contract specifically states otherwise.
The Contractor shall coordinate site access, work hours, staging, and any school-specific restrictions with the Government before mobilization. Use of school facilities for lodging, sleeping quarters, cooking, bathing, or similar personal accommodations is not authorized unless expressly approved in writing by the Contracting Officer. C.Goelz 6/4/2026 3 6/4/26 JEVED Helicopter rates are 500-700 pounds per trip from Long Mesa at $2 a pound, correct? 6/5/26 Partially confirmed. The April 2, 2026 Havasupai Tribal Council rate letter identifies cargo at $2 per pound and lists one-way sling rates between Hilltop/Long Mesa and Supai of $1,000 for a 206 aircraft and $1,500 for a 407 aircraft. The letter does not confirm a 500–700 pound payload per trip. Payload capacity, aircraft type, load configuration, availability, weather limits, and number of trips shall be verified by the Contractor with the helicopter operator. Full payment is required before flight or services are performed.
The Contractor remains responsible for confirming all helicopter transportation, delivery, landing, authorization, scheduling, and logistics costs necessary to complete the work. C.Goelz 6/4/2026