Questions_and_Answers___Final_0002.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- ROOFING PROJECT AT MARIANO LAKE Federal contract opportunity
- Solicitation number
- 140A2324R0094
About this file
This document is a Questions and Answers log for Solicitation #140A2324R0094 for a Roofing Project at Mariano Lake. The solicitation is being issued by the Department of the Interior, Bureau of Indian Affairs, Bureau of Indian Education. The questions cover topics such as revising the scope to address drainage issues, confirming ceiling insulation details, and addressing leakage issues on the library roof. The government has provided responses indicating the contractor can propose recommended solutions in some cases, and that the library roof repairs are required to address leakage. The solicitation also requires R-30 insulation on the dormitory building, despite the existing 1/2" styrofoam which may require additional build-up. Overall, this document provides clarification and responses to contractor questions on various aspects of the roofing project requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A2324R0094_Amd_0002.pdf | ||
| Sol_140A2324R0094_Amd_0001.pdf | ||
| SF-25A_Payment_Bond_Form.pdf | ||
| B08_Questions_and_Answers_Log.xlsx | XLSX spreadsheet | |
| A04_STATEMENT_OF_WORK.docx | DOCX document | |
| B08_BIA_FEDERAL_HEALTH_AND_SAFETY_CODES.pdf | ||
| B08_SF-24_Bid_Bond_Form.pdf | ||
| Sol_140A2324R0094.pdf | ||
| B08_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| B08_Material_Approval_Submittal_BIE.pdf | ||
| B03_WAGE_DETERMINATION__NM20240024__07-26-2024.pdf | ||
| SF-25_Performance_Bond_Form.pdf | ||
| B08_Progress_Schedule.pdf | ||
| B08_Progress_Report.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Questions and Answers Log for Solicitation # 140A2324R0094
| Number | Question | Date Sent to COR | Answer | Date Answered |
| 1 | Building Number 414 Boiler room: Would the government consider revising the scope to demo the deck, add scupper and down spout, and full taper and crickets in order to correct the system for proper drainage? The current scope and magnitude does not allow proper correction. | 8/14/24 | The contractor can propose their recommended |
solution.
2 Building 413 Dormitory: Can the government confirm that insulation on the ceiling is R-30 Batt Insulation? The ciling is hard lid so it could not be verified without destructive investigation. 8/14/24 The Government cannot confirm the ceiling insulation on bldg 413.
| 3 | Building 1399 Gym Roof (mechanical well): The crickets are too small for proper drainage. Would the government agreee to demo of existing PVC leaving existing taper system and installing new cricket system? | 8/14/24 | Contractor can propose their recommended solution on Bldg. 1399. |
| 4 | Building 1400 Library: This standing seam roof leaks at HVAC locations. HVAC maintenance personnel could make a permanent fix to seams at these locations with a recommended product. Would the government consider removing this Building from the scope of work? | 8/14/24 | Government wants to leakage areas repaired to |
ensure no leakages.
| 5 | What are they going to do about the library. There was conversation that it was going to be removed from the SOW. Will that be the case. | The Library will remain in SOW |
| 6 | On the dormitory, R30 is requested, however right now there is only 1/2" styrofoam. A build up will be required if R30 is installed. Is this what you would like? | Government requires R30 |
| 7 | ||
| 8 | ||
| 9 | ||
| 10 |