This document is a Question and Answer (Q&A) log related to a federal contract opportunity for the Varnish Gym, Auditorium & Bennett Hall at Sherman Indian High School. The contract opportunity involves providing materials, supplies, labor, equipment, and supervision for floor replacement/installation at the referenced facilities. Key details include:

The solicitation number is 140A2324Q0341 and it is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside. Proposals are due by August 5, 2024 at 12:00 PM MDT. The contract requires a two-volume proposal, with Volume I for pricing and Volume II for technical approach. The Q&A log covers topics such as confirming the use of water-based sealant and finish coats, allowance for floor patching, replacement of game lines and logos, use of generator power for sanding, and safety/supervision requirements. The agency is the Department of the Interior, Bureau of Indian Education.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Questions Log - 140A2324Q0341
Contractor's QuestionGovernment Response
1please confirm waterbase 2 seal coats and 3 finish coats for proper build and gloss level as opposed to 2 finish coats per the RFP due to quality control for longevity and OIL base is no longer California approved.Yes water base.
2Per the walk we noticed faulty floor that would need replacing-Auditorium floor will require up to 250sf of patching. 3 1/8" wide DF. This is not a standard size and will need to be custom ordered from the mill. Recommend including an allowance for patching based on $60sf. .Will allow.
3Please confirm all gamelines to be replaced based on existing in both gymsGame lines and volleyball lines to installed.
4Please confirm stain color in three point areas to be added on the main gym floor.Stain medium color.
5Please confirm lettering and logo to be like for like in size and complexityVarsity lettering.
6Please provide new graphics/lettering and pantone school colors for the main gym. PacWest can provide a rendering for approval post bid if awardedSchool will provide logo, boundary color purple and lettering white maybe.
7please confirm Per the RFP Contractor is provide generator power for power sanders due to large magnitude of power for sanders as existing power will not sufficeCorrect
8considering the small size of this project please confirm Supervison is the be a TRI HAT- meaning Safety/Quality Control/ Supervisor to fullfill all roles on site.Pewo is Safety Officer
9Please confirm all sites will be unoccupied during construction phase.Yes
10Please confirm Air conditioners and or heaters can and will be running for curring purposesNew units are been installed.
11Please confirm in the large GYM we are only going up to the bleechers when they are in their fully retracted operational positionUp to bleachers.
12Please confirm that no cove cove base is being replaced and is to remainCorrect
13Please confirm we can use a local water hose connection.Yes.
14Please confirm EM 385 safety measures are going to be usedYes
15Please confirm a VOLUME 2 Technical Proposal is necessary for this project and not just a price proposalYes
16what is the Tero tax percentage for this projectNo Tero tax.
17When is the first proposal or proposals due date considering we just received RFP on 7/3 and RFI still need to be answeredCO will answer.
18Does this project have any asbuiltsto be provided to the contractorYes but not needed.
19Please consider extending the RFP And or lower written technical written proposal for this single scope project.CO will answer..
20Will all the RFI's be shared with all the potential contractor to ensure even bidding fieldCO will answer..