140A2323Q0639_Questions_and_Answers_0004.pdf

PDF 131 KB Posted

Attached to
Kitchen Hood & Fire Suppression System
Solicitation number
140A2323Q0639
Issued by

About this file

This document contains questions and answers related to solicitation number 140A2323Q0639 from the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education for a kitchen hood and fire suppression system at the Crazy Horse Indian School. The solicitation is for brand new work requiring the installation of two type I kitchen hoods. Drawings of the work area and information on a recent kitchen floor project can be provided. While fire dampers are not required for the hoods, a structural evaluation of the roof should be included in the curb design. The existing kitchen equipment layout must be maintained.

View the file

Other files

File Type Posted
Sol_140A2323Q0639_Amd_0004.pdf PDF
Attachment_30_Statement_of_Work-Amended_0004_0004.pdf PDF
A-6_SCHOOL_COMPLEX_KIT_AREA_A_ENLARGED_FLR___EQUIPMENT_LAYOUT_PLAN_0003.pdf PDF
S-12_SCHOOL_COMPLEX_UPPER_FLOOR_FRAMING_PLAN_AREA_A-B_JOIST___BEAM_SCHEDULE_0003.pdf PDF
E-21_SCHOOL_COMPLEX_POWER_RISER_DIAGRAM___PANEL_SCHEDULE_0003.pdf PDF
S-16_SCHOOL_COMPLEX_ROOF_FRAMING_PLAN_AREA_A-B_0003.pdf PDF
Sol_140A2323Q0639_Amd_0003.pdf PDF
M-37_SCHOOL_COMPLEX_HEATING___AIR_CONDITIONING_AREA_A-C_0003.pdf PDF
E-20_SCHOOL_COMPLEX_POWER_MECHANICAL_LOFTS_0003.pdf PDF
E-7_SCHOOL_COMPLEX_POWER_PLAN_PARTIAL_AREA_A___LOWER_AREA_B_0003.pdf PDF
M-28_SCHOOL_COMPLEX_HEATING___AIR_CONDITIONING_AREA_A_0003.pdf PDF
E-10_SCHOOL_COMPLEX_POWER_PARTIAL_AREA_KITCHEN_0003.pdf PDF
E-16_SCHOOL_COMPLEX_SPECIAL_SYSTEMS_PARTIAL_AREA_A_KITCHEN_0003.pdf PDF
E-13-SCHOOL_COMPLEX_SPECIAL_SYSTEMS_PLAN_PARTIAL_AREA_A____LOWER_AREA_B_0003.pdf PDF
Sht_2_of_7_Main_Floor_Partial_Area_A_0003.pdf PDF
A-46_SCHOOL_COMPLEX_MISC_KITCHEN___RELATED_EQUIPMENT_DETAILS_AREA_A_0003.pdf PDF
A-14_SCHOOL_COMPLEX_EXTERIOR_ELEVATIONS_0003.pdf PDF
Sol_140A2323Q0639_Amd_0002.pdf PDF
Sol_140A2323Q0639_Amd_0001.pdf PDF
Attachment_6_A-E_Submission_Instruction_for_Minor_Construction_Projects.pdf PDF
Attachment_5_Health_and_Safety_Codes_and_Standards_2019.pdf PDF
Attachment_10_SF25A_Payment_Bond.pdf PDF
Attachment_4-_Pictures.pdf PDF
Attachment_9_SF25_Performance_Bond.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment_7_Questions_and_Answers_Log.xlsx XLSX spreadsheet
Attachment_14_SF1413_Statement_and_Acknowledgement.pdf PDF
Attachment_8_SF24_Bid_Bond.pdf PDF
Attachment_3_Vicinity__Site_Map_and_Drawing.pdf PDF
Attachment_13_IA_C713_Progress_Report.pdf PDF
Attachment_12_IA_C113_Progress_Schedule.pdf PDF
Sol_140A2323Q0639.pdf PDF
Attachment_2_Wage_Determination_SD20230022_7-21-23.pdf PDF
Attachment_11_IA_Form_3000_Material_Approval_Submittal.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers for 140A2323Q0639 – Kitchen Hood & Fire Suppression System – Crazy Horse Indian School

Q1: Do you have a drawing for the area we are working in?

A1: Drawings are posted

Q3: We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

If not brand new, could you please provide the current / previous contract number?

A3: This is a brand new contract.

Q4: Can you confirm that this bid is due on Labor Day?

A4: Yes, will extend.

Q5: Will makeup air be included in the design and construction?

A5: No

Q6: Does cooling need to be added to the makeup air unit?

A6: No, cooling will not be added to the makeup air unit.

Q7: Can you end any information on the recent kitchen floor project as we will need to perform patching?

A7: The flooring was provided by Fischers Flooring of Rapid City, DS.

Q8: Are there plans for the school that can be shared?

A8: Yes

Q9: We do not typically see a requirement for fire dampers on exhausts, can you clarify the

SOW?

A9: Fire dampers are not required for kitchen hoods. This requirement will be removed from the

SOW

Q10: The exhaust fans on the roof, is there a structural evaluation that needs done?

A10: Yes, a structural evaluation should be made as part of the roof curb design.

Q11: Is it possible to re-arrange the equipment under the hoods to be (1) type one hood and (1) type 2hood? Cooking/frying on one side and ovens/steamer on the other side?

A11: The cooking staff prefer the existing kitchen equipment arrangement as is. Unfortunately, we will need to install 2 type I hoods to accommodate.

File details come from the government source that posted it. Updated .