B12_Vendor_Requested_Information_0001.docx

DOCX document 13 KB Posted

Attached to
Contracted Line Crews for CRA-ES Federal contract opportunity
Solicitation number
140A1623Q0013
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

View the file

Other files for this federal contract opportunity

Other files attached to Contracted Line Crews for CRA-ES, newest first.
File Type Posted
Sol_140A1623Q0013_Amd_0001.pdf PDF
A04_SOW.pdf PDF
Sol_140A1623Q0013.pdf PDF
B03_DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: What do you consider a specialized vehicle, and if these vehicles are to be provided by the contractor, do we provide an hourly price?

A: It is envisioned that the contractor will provide their own vehicles in performance of this work which would require contractor pricing. The work here is estimated as follows (at voltages from 120 VAC up to 69,000 VAC);

90% : ground-level to 45' off the ground 8% : 45' to 70' above ground 2% : underground conductor

The bulk of service orders/work orders are completed utilizing a standard utility truck or insulated aerial truck ("small bucket service truck"). The greater heights may require larger insulated aerial truck. Underground work often may require hand tools and general excavation equipment.

In the context of the work statement, the term "specialized vehicles" may refer to equipment such as the following; over 45' reach insulated aerial truck, derrick auger/digger, backhoe, lighted tower trailer, wire spool trailer, trencher, backhoe, equipment trailer, and dump trailer. CRA-ES's transmission line (69kV) is primarily located in the desert where very soft sand can impede ingress; this may require specialized equipment.

Under exceptional circumstances, CRA-ES can provide a derrick digger, 70' insulated aerial bucket truck, backhoe, dump truck, and lighted tower trailer. However, the contractor should be utilizing their vehicles.