National Multiple Award Demolition Contract Federal contract opportunity
Solicitation number
140A1621R0014
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

About this file

This document contains questions and answers related to a solicitation for a national multiple award demolition contract. The solicitation was issued by the Department of the Interior Bureau of Indian Affairs Central Office as solicitation number 140A1621R0014 for a National Multiple Award Demolition Contract. The questions and answers provide additional details for a Phase 2 seed project involving the demolition of four buildings located at the Crownpoint Justice Center in New Mexico. Details include the age and construction dates of the buildings, utility disconnection requirements, health and safety standards, waste disposal procedures, and confirmation that no Davis-Bacon wage rates or additional construction activities are required. Offerors must meet all applicable local, state, and tribal permitting and tax requirements.

View the file

Other files for this federal contract opportunity

Other files attached to National Multiple Award Demolition Contract, newest first.
File Type Posted
Sol_140A1621R0014_Amd_0001.pdf PDF
B08 Solicitation 140A1621R0014_Section J_Attachment 1_SOW.docx DOCX document
B08 Solicitation 140A1621R0014_Section J_Attachment 2_Demolition Experience Project Data Sheet.docx DOCX document
B08 Solicitation 140A1621R0014_Section J_Attachment 4_RFI Form.pdf PDF
B08 Solicitation 140A1621R0014_Section J_Attachment 3_PPQ.doc DOC document
Sol_140A1621R0014.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A1621R0014 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

A16

Reston VA 20191 Contracting Office 12220 Sunrise Valley Drive

BIA CENTRAL 00016

03/08/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/08/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is provide the timely questions and answers in response to the Phase 2, Seed Project/Technical Price, of solicitation number 140A1621R0014, Demolition

Services Multiple Award Contract. The proposal submission deadline is hereby extended to

3:00 PM (ET) on 28 Jun 2021.

Period of Performance: 07/30/2021 to 07/29/2026

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Brian Schoellkopf

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0002, RFI's for Phase 2 Seed Project/Technical Price Solicitation No. 140A1621R0014, Demolition Services Multiple Award Contract

No. Question Answer 1 Can you please provide the Site Walk Attendees list? Yes, see attached attendance roster.

2 How old are the trailers?

Bldg # 966 Year Built 1977 44 years old Bldg # 971 Year Built 1973 48 Bldg # 973 Year Built 1980 41 Bldg # 1380 Year Built 1997 24 None of them is older than 50 for historical reasons.

What are the requirements for the City of Crown Point for this project? (it is mentioned in the RFP that we must meet City of Crown Point requirements)?

The contractor should contact the local (Crownpoint) Police Department. The use of city roads is under the jurisdiction of the police.

4 Where is the nearest source of water for dust control?

Local utility company NTUA has a lagoon and they have provided water in the past and the contractor will need to chlorinate it.

5 What, if any, are the requirements for site restoration? No, please refer to SOW Section D. Task Identification 5 and 6.

6 The utilities will be cut and capped right below each trailer, is that correct?

Yes, but only Building 1380 was hooked up to the utilities. (It used to serve as Criminal Investigation Bldg.) Other buildings were never connected to public services.

Behind trailer 1380, is the power line connected to the trailer energized? If yes, will the BIA disconnect the power?

BIE/BIA Facility Management will request the utility provider to cut the power line to the BIA own utility meter pole.

What are the recycling requirements for this project, if any, since there are limited recyclable materials?

BIA has no recycling requirements for this project, please check codes and regulations.

Are we responsible for removing the utility pole and overhead lines behind trailers 1380 and 971?

BIE/BIA Facility Management request the utility provider to cut the overhead power line. The utility belongs to BIA and the contractor can remove the entire pole if the pole in the way of the portable move.

10 Does this project require Davis Bacon Wage Rates for all construction workers?

No, this project is a service acquisition. Therefore, the selected contractor will have to adhere to the Service Contract Wage Determination.

11 Is any technical write up required with the submittal, or is it strictly a bid? Please follow the proposal preparation instructions in the solicitation.

12 Is this project currently funded, and if so, what is the amount of funding? Yes, it's currently funded, but we will not disclose the amount.

13 Does CLIN 0001 correspond with Item 0100 in the original solicitation (Phase 1)? Yes

No. Question Answer

M.3.7.4 Technical Approach evaluation criteria is not relevant to a demolition/disposal project. Please clarify applicable evaluation factors for the technical approach.

Paragraph M.3.7.4 is deleted in its entirety and replaced with the following:

M.3.7.4 Technical Approach: The Government will evaluate the submitted project narrative for compliance with the requirement and for clarity, realism, and effectiveness.

We propose that the SCA Wage Determination No.: 2015‐5451 | Revision No.: 12 Date of Last Revision: 12/21/2020, be replaced with the Nationwide SCA Oil Spills and Hazardous Materials Wage Determination No.: 1996‐0223 Revision No.: 50 Date of Last Revision: 02/04/2020. The National SCA wage determination is more appropriate to the training and professional certifications for the workers on this project.

CO has determined that WD 2014‐5451, Rev #12, applies to this acquisition. FAR 22.1002‐2 states, "Contractors performing on service contracts in excess of $2,500 to which no predecessor contractor’s collective bargaining agreement applies shall pay their employees at least the wages and fringe benefits found by the Department of Labor to prevail in the locality or, in the absence of a wage determination, the minimum wage set forth in the Fair Labor Standards Act."

Is it correct to assume there is no intent for contractor to reconstruct, and that services do not include excavation of contaminated soils, stockpiling, backfill, restoration or other “Construction” related activities? Please see SOW D.2.a.iii.E

Since this is a small demolition project in a remote area, would the government pre‐ authorize a 6‐day work week (Monday through Saturday) to be more cost effective?

The Contractor needs to check with the local government agencies, state and federal regulations and OSHA standards.

This project is on the Navajo Lands. The government expects the contractor to pay the New Mexico Gross Receipts tax and pass that cost along to the BIA, Correct?

Offerors need to verify the applicability of NM Gross Receipts Tax with NM Taxation & Revenue Department

The NM State Historic Preservation Office (SHPO) requires a minimum of 30 days to review a historic survey; the Tribal Historic Preservation Officer (THPO) also requests 30 days minimum to review submittals. This federal and tribal requirement could impact the ability to complete the project within 60 days from Notice to Proceed.

a. What was the build date of these buildings, are they less than 50 years old?

b. Because this project is on Navajo Lands, will the SHPO be required to review and concur with the survey findings before work begins, or is that authority delegated to the THPO?

Bldg # 966 Year Built 1977 44 years old Bldg # 971 Year Built 1973 48 Bldg # 973 Year Built 1980 41 Bldg # 1380 Year Built 1997 24 None of them is older than 50 for historical reasons.

Will the government consider alternate proposals to the Low Price Technically Acceptable evaluation, such as a Best Value approach using higher percentages of local Priority 1 contractors and new hires? No

Will the BIA or the Crownpoint Justice Center have a representative on site to sign the waste manifest as the waste generator?

No. Crown Point Facility Management has an office and due authorization at Crownpoint.

No. Question Answer

Without the ability to complete an Environmental Survey, please confirm that it is expected any surfacing or paint impacted debris will not change the waste characterization to D008, and that any demolition debris will be universal waste, asbestos‐containing material, or construction and debris only.

It is the Contractor's duty to provide the Initial Level 1 and 2 hazardous materials investigation/survey. See SOW Section D. Task Description.

Per the Original Solicitation on page 85 of 99, section L.7.5.2.2 Standard Form (SF) 30 (Amendments), we are supposed to include SF30 Amendments with our Phase 2 proposal. Are we supposed to include Amendment 0001 that we already included in the Phase 1 Proposal again, or just any new Amendments that our issued? Thus far, we have only received one SF30 for Amendment 0001 with an effective date of 03/08/2021.

Phase 1 is complete so only include any applicable amendments for Phase 2 (Seed Project), such as this amendment

Due to the small magnitude of this specific seed project, is it allowable for key personnel members to fulfill more than one role? Are there any position titles where it is not allowable to fulfill more than one position?

BIA requires the Contractor to have at least one responsible person on site. Various combinations can be made. Site Supervisor/Quality Engineer or PM/Safety Engineer etc. Delegation of authority to Subcontractor is not allowed.

Per the Original Solicitation on page 96 of 99, section M.3.7.4 Technical Approach, “The contractor’s ability to produce detailed shop fabrication drawings is assessed.”

This evaluation factor section concerning design elements does not pertain to the demolition seed project, correct? Please see the answer to Question #14.

26 Is there water available on site for use and/or purchase?

Local utility company NTUA has a lagoon and they have provided water in the past and the contractor will need to chlorinate it.

No. Question Answer

27 Is there a designated area that we could acquire water for dust control?

Local utility company NTUA has a lagoon and they have provided water in the past and the contractor will need to chlorinate it.

It is understood that the sewer line under bldg. 1380 is capped and abandoned in place. Please confirm. Yes

Will the Pueblo of BIA salvage anything from the site? If so, will they remove anything prior to the demolition activities? No

In regards to TERO, as a Alaska Native Corporation, are there any additional requirements we should consider to meet expectations? The contractor needs to check with local and tribal authorities.

31 Are there any permit requirements from city of Crown Point? The contractor needs to check with local and tribal authorities.

Are there any requirements from BIA, the Reservation, the City or other agencies that may affect pricing on this effort? The contractor needs to check with local and tribal authorities.

33 Please identify all active utilities that currently exist that have to be terminated. Electricity, water and sewage.

34 There’s a water well on site. How is that service to be terminated and capped? The contractor shall check with BIE/BIA Facility Management of Crownpoint.

There’s an active sewer line. Please provide a drawing or location of where that is to be capped.

No drawing. BIE/BIA Facility Management showed the participants at the site meeting the exact location of the sewer line.

36 Are there any environmental reports available for these buildings? No

37 When were these buildings constructed?

Bldg # 966 Year Built 1977 44 years old Bldg # 971 Year Built 1973 48 Bldg # 973 Year Built 1980 41 Bldg # 1380 Year Built 1997 24 None of them is older than 50 for historical reasons.

38 Please provide any details required for restoration. Please see SOW D.2.a.iii.E

ITEM# COMPANY NAME/PARTNER REPRESENTATIVE PHONE NUMBER EMAIL SIGNED ON 06/08/2021

1 Cherokee CRCC Matthew Griffin 918 933-0878 Matthew.Griffin@cherokee-federa OK

2 Che/Southern Demolition Daniel Parks 918 557-4910 daniel@southerndemo.com OK

3 ARS ALEUT FEDERAL William Hladick OK

4 ARS/HIGH PRESSURE Paul McCarthy OK

5 Crutcho Downey JV Doug Williams- Superintendent OK

6 CRUTCHO/EAI Abatement Darwin Chesnut- President OK

7 Kaiyuh Services, LLC Jerry Sharp – Yukon Mgt / Anubis Inc

8 KAIYUH/C&C Services David Tarin OK

9 EQM SERVICES Ronald McManamy, Vice President OK

10 EQM SERVICES David Vangraefschepe, Env. Manager OK

11 Cheroenhaka Nottoway Alfred Schneider 414-248-5751 OK

12 Cheroenhaka Nottoway Alfred Schneider 414-248-5752 OK

13 Terra Solutions and Services Kelly Stater 805 431-1418 OK

14 Ahtna Global, LLC Ron DesGranges 206-299-0601 rdesgranges@ahtna.net OK

15 Ahtna Global, LLC Alan Christman 206-299-0601 achristman@ahtna.net OK

CROWNPOINT Seed Project Site Walk Participants