Sol_140A1124B0001_Amd_0002.pdf

PDF 90 KB Posted

Attached to
PIR 2(4) - ROAD CONSTRUCTION - TOHONO O'ODHAM NATI
Solicitation number
140A1124B0001
Issued by

About this file

This document is an amendment to a solicitation for road construction services on the Tohono O'Oodham Nation reservation. Amendment No. 2 extends the bid response date to November 29, 2023 at 1400 Mountain Standard Time. It provides responses to five questions from prospective offerors regarding quality control and traffic management requirements. The amendment clarifies that an independent testing laboratory will oversee quality control and that the project superintendent can serve as the traffic control supervisor, performing other duties as needed. It also confirms that end dumps will not be required for mainline paving. The related federal contract opportunity identifies this as Solicitation No. 140A1124B0001 issued by the Department of the Interior Bureau of Indian Affairs Western Region for PIR 2(4) road construction services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A1124B0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Phoenix AZ 85004

A11

SUITE 400 MAILROOM

2600 N CENTRAL AVENUE

Contracting Office

DOI, BIA WRO

Phoenix AZ 85004

A11

SUITE 400 MAILROOM

Contracting Office

2600 N CENTRAL AVENUE

BIA WRO 00011

11/20/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/23/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment No. 2 is issued as follows:

1. Bid Date Extended - Standard Form 1442 - Block 13a is revised to read as 11/29/2023

1400 MS (Mountain Standard Time).

2. Response to questions are provided:

Question 1: Section 153 of FP-14 requires a Quality Control Manager. Is a Quality Control

Manager required?

Response 1: The contract requires an Independent Testing Laboratory that over sees all

Quality Control for this contract. The Contractor's are required to submit a quality

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Renee Holly

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140A1124B0001/0002 control plan that includes professional registered engineers and certified testing technician for our approval prior to any testing being completed on the project. So yes, they need a Quality Control Manager.

Question 2: If so, is this full-time, on site or part-time, on site?

Response 2: Whenever any testing is required in the contract.

Question 3: Section 156 Public Traffic. Is a

Traffic Control Supervisor (TCS) required for this project?

Response 3: This can be the project superintendent.

Question 4: If so, can the TCS perform other duties?

Response 4: Answered above.

Question 5: What supplier has the Government found that will supply the specified mix?

Response 5: The Government is required to follow the Federal Highways guidelines for the specified mix and the government does not have a list of suppliers to provide.

Question 6: Section 402.13. Is an asphalt pickup machine (Kocal) acceptable for mainline paving?

Response 6: Yes, No end dumps will be required for main line paving, only belly dumps.

End of Amendment