Amendment_0003_0003.pdf

PDF 49 KB Posted

Attached to
Upgrade detention center security system Federal contract opportunity
Solicitation number
140A1121Q0024
Issued by
Department of the Interior Bureau of Indian Affairs Western Region

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade detention center security system, newest first.
File Type Posted
Sol_140A1121Q0024_Amd_0003.pdf PDF
Sol_140A1121Q0024_Amd_0002.pdf PDF
Amendment_0002_0002.pdf PDF
Amendment_0001_Q_A_and_Bid_Schedule_0001.pdf PDF
Sol_140A1121Q0024_Amd_0001.pdf PDF
Sol_140A1121Q0024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 16, 2021

Following questions and answers are provided:

Q: Can you confirm that the Division 11 Section 11700 specification documentation attached to solicitation pertains to the existing system and that the provisions contained therein do not apply to the proposed replacement system other than the new system’s ability to integrate with the existing system? Correct.

Q: Are cable pathways established for all camera locations / ISP Fiber optic cables or will new pathways need to be established? This is a design build, it’s the integrators responsibility during their site visit to work out these details with the end user.

Q: Will cable need to be in conduit systems or free air / cable tray? This is a design build, it’s the integrators responsibility during their site visit to work out these details with the end user.

Q: Is plenum cable required? This is a design build, it’s the integrators responsibility during their site visit to work out these details with the end user.

Q: Will cameras and headend need to be installed side by side with existing cameras then cut over to the new headend and cameras once integration is complete? Yes.

Q: Please indicate the type of fiber connector preferred for GBICS and FOC. LC / SC /

ST? This is a design build, it’s the integrators responsibility during their site visit to work out these details with the end user.

Q: Please indicate the type of fiber optic cable required for connection between MDF/IDF/

Control Room. OS1 OS2 OM1 OM2 or OM3? This is a design build, it’s the integrators responsibility during their site visit to work out these details with the end user.

Q: Can existing CAD files or PDF drawings for floor plan, cable riser diagram, telecommunication wall spaces and rack elevations be provided for purposes of documenting installation per optional pricing, or will the pricing option need to include creating those items from scratch? We only have the blueprints for this building.

Q: What formats would be required for delivery of Optional Documentation? i.e., hard copy drawing sets, DWG files, PDF files etc. Hard copy and PDF.

United States Department of the Interior

BUREAU OF INDIAN AFFAIRS

SAN CARLOS IRRIGATION PROJECT

13805 N. Arizona Boulevard

Coolidge, Arizona 85128

IN REPLY REFER TO: ACQUISITIONS

Q: Can you confirm whether the 41 Vicon fixed dome cameras and 16 Vicon indoor PTZ cameras and locations described in the scope and the included maps constitute the complete number of replacement cameras required? Yes, they are correct.

Q: Do you require cut sheets for the cameras and parts and pieces of the install be submitted along with the quote? These may be submitted to allow the agency to determine responsiveness with specifications in the solicitation.

Questions may be referred to Randall.brown@bia.gov or phone (520) 560-2590.

Closing date 6/22/2021, 11:30 a.m. MST.