Amendment_0001_Q_A_and_Bid_Schedule_0001.pdf
PDF 5 MB Posted
- Attached to
- Upgrade detention center security system Federal contract opportunity
- Solicitation number
- 140A1121Q0024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003_0003.pdf | ||
| Sol_140A1121Q0024_Amd_0003.pdf | ||
| Sol_140A1121Q0024_Amd_0002.pdf | ||
| Amendment_0002_0002.pdf | ||
| Sol_140A1121Q0024_Amd_0001.pdf | ||
| Sol_140A1121Q0024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 10, 2021
Reference Solicitation 140A1121Q0024
Following questions and answers are provided to all potential bidders:
Q: Does the government want CAT5 or CAT6 cable for this project? CAT 6
Q: What kind of ceilings does the building has? Drop ceiling or hard lid? Corrugated metal with concrete, T-bar suspended ceilings and drywall
Q: What is the tallest ceiling height? 8 ft to 18 feet
Q: Are there any drawings giving the dimensions to the perimeter of the building? Detention area is 9,781 sq. ft, Office area 5,485 sq ft and Education area is 3,323 sq. ft. Total sq feet = 18,589
Q: I don't see specifics for mounting hardware. Vicon has many choices. Can indicate the number and types each camera will need such as Wall mount, ceiling mount, corner mount, long arm etc..? It will depend on which camera because some are pole mounted, wall mounted, or ceiling mounted.
Floorplans and camera locations are attached to this amendment.
Potential bidders must have inspected the site prior to bidding, due to the complexity of the proposed project.
Revised Bid Schedule is attached.
United States Department of the Interior
BUREAU OF INDIAN AFFAIRS
SAN CARLOS IRRIGATION PROJECT
13805 N. Arizona Boulevard
Coolidge, Arizona 85128
IN REPLY REFER TO: ACQUISITIONS
Item Description Qty U/I Price Amount 01 Vicon Valerus 62TB rack-mounted network video recorder (VLR-62TB-R5-A) w/all necessary Pro Licenses
1 EA $_______ $_______
02 Vicon Application Server VLR-APPSRV-RK w/all necessary license(s)
1 EA $_______ $_______
03 Vicon Viewing Station (VLR-CLIENT-A) including all necessary license(s)
3 EA $_______ $_______
04 23.6” LED monitor at the rack for setup/viewing 5 EA $_______ $_______ 05 Install and terminate Fiber 6 strand MM 50mic OM3
Armored Tight Buffer I/O (approx. 300’) master control room to the IDF
1 EA $_______ $_______
06 Install and terminate Fiber 6 strand MM OM3 Tight Buffer I/O 50um (approx. 300’) Master control room to the MDF
1 EA $_______ $_______
07 Two rack mount fiber LIU’s and 1 wall mount LIU with adapter panels (LC to LC
1 EA $_______ $_______
08 24-port PoE switches in master control room, IDF, and MDF along with GBIC’s
3 EA $_______ $_______
09 24-port Cat 6 panels in master control room, IDF, and
MDF
3 EA $_______ $_______
10 Camera install with new CAT 6 cabling to new IP cameras as required
1 EA $_______ $_______
11 Install 16 Vicon Indoor PTZ cameras (incl. all necessary Pro Licenses)
16 EA $_______ $_______
12 Install 41 Vicon Indoor/Outdoor cameras (incl. all necessary Pro License(s))
41 EA $_______ $_______
13 Provide and install PLC Controls Upgrade including Master control Viewing
1 EA $_______ $_______
14 Provide and install 43” monitor with wall mount articulating mount
1 EA $_______ $_______
GRAND TOTAL $_______
1. Pole PTZ B. Ball Court
2. Pole B. Ball Court
3. Wall PTZ Back Door
4. Wall PTZ Court Yard N. Side (Kitchen)
5. Wall Court Yard N. Side (Libary)
6. Wall Court Yard S. Side (Booking)
7. Wall Court Yard S. Side (Bio Closet)
8. Wall Vehicle Sally Port S. Side
9. Wall Vehicle Sally Port N. Side
10. Wall Vehicle Sally Port (Inside Port)
11. Ceiling PTZ Booking Floor
12. Wall Unit B Above Entrance Door
13.Wall PTZ Unit C Above 209 Shower
14. Wall Unit C Above 201 Door
15. Wall Housing Hallway above 182 Door
16. Wall PTZ Unit A Above Entrance Door
17. Wall Unit C Above Sgt Office
18. Wall Lobby
19. Wall Kitchen E. Wall
20. Wall Kitchen Above Dishes
21. Wall PTZ Outer Perimeter S. Wall
22. Pole S. W By Connex
23. Wall PTZ Outer Perimeter Front Entrance
24. Wall PTZ Outer Perimter N.E Wall
25. Wall Unit B E. Wall
26. Wall Unit A E. Wall
27. Ceiling PTZ Visiting
28. Ceiling Admin Hallway Reception
29. Ceiling Holding #164
30. Ceiling Holidng #165
31 Ceiling Holidng #163
32.Wall Housing Hallway Above 174 Door
33. Ceiling Classroom 1 By TV
34. Ceiling Classroom 2 Above Closet
35. Ceiling Arts and Crafts
36. Ceiling Library
37. Ceiling Cultural Room
38. Ceiling Admin Hallway 130 Door
39. Ceiling Unit B Cell 187
40. Ceiling Unit A Cell 175
41. Ceiling Unit C Cell 217
42. Ceiling PTZ Kitchen Above Window
43. Ceiling PTZ Above Can Food
44. Ceiling By Ref/Frzr
45. Ceiling Classroom 1 Above Door
46. Ceiling Classroom 2 Above Door
47. Ceiling Classroom Hallway
48. Ceiling Control
49. Ceiling Break Room
50. Wall Outer Perimter Green House Sallyport
51. Ceiling Green House
52 Ceiling PTZ Booking Above Desk
File details come from the government source that posted it. Updated .