Price_Schedule_Former_Sanostee_School_Remediation_0001.pdf

PDF 128 KB Posted

Attached to
FORMER SANOSTEE SCHOOL SITE REMEDIATION
Solicitation number
140A0925R0002
Issued by

About this file

This document is a Price Schedule for the Sanostee School Site Remediation project, detailing a comprehensive site cleanup and restoration effort. The project is divided into four primary tasks: Prework Submittals (including site-specific Health and Safety Plan and work plan), Mobilization and Labor, Remediation, and Reports. The Remediation task encompasses multiple environmental services, including asbestos abatement of vinyl composition tile (VCT) and transite piping, excavation and disposal of concrete debris, concrete piers, and asphalt pavement, utility removal, well head repair, and non-hazardous solid waste disposal. Each task involves specific activities such as excavation, load-out, transportation, off-site disposal, backfilling, and re-seeding, with coordination required with NTUA (Navajo Tribal Utility Authority) for utility and well handling.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK I PREWORK SUBMTTALS

1. Site Specific HASP

2. Work Plan/Schedule

Task 2 Mobilization and Labor

1. Mobilization/Transportation/Site setup/Offices

2. Equipment/Rental

3. Materials/Supplies

Task 3 Remediation

Asbestos Abatement of VCT

Excavate, Load-Out, Transport, and Off site Disposal (top 3")

Backfill

Re-seed

Asbestos Abatement of Transite piping

Gather, Load-Out, Transport, and Off site Disposal

Concrete Debris/Sidewalks

Gather, Load-Out, Transport, and Off site Disposal

Re-seed

Concrete Piers (non-asbestos)

Excavate, Load-Out, Transport, and Off site Disposal

Backfill

Re-seed

Asphalt Payment (non-asbestos)

Gather, Load-Out, Transport, and Off site Disposal

Re-seed

Artesian Well

Repair well head.

Work with NTUA on proper handling.

Utility

Work with NTUA on proper abandonment of utility

Remove all buried utility (water, natural gas, communication lines, utility poles).

Solid Waste (non-hazardous)

Gather, Load-Out, Transport, and Off site Disposal

Task 4 Reports

Total

Grand Total

H.

Price Schedule Sanostee School Site Remediation

A.

B.

C.

D.

E.

F.

G.

Taxes:

File details come from the government source that posted it. Updated .