Phase 1 ESA, Tununak, AK Federal contract opportunity
Solicitation number
140A0525Q0007
Issued by
Department of the Interior Bureau of Indian Affairs and Indian Education

About this file

This is Amendment 0001 to RFQ #140A0525Q0007 for a Phase 1 Environmental Site Assessment in Tununak, Alaska, along with associated Questions & Answers. The amendment extends the quotation due date to February 6, 2025 at 12:00 PM Pacific Time and includes responses to four contractor questions regarding the work requirements.

The Q&A clarifies that while adherence to ASTM 1527-21 standards is required, a site-specific work plan is not needed as long as logistics for remote Alaska work are addressed. Contractors may use their standard Health and Safety Plan rather than creating a site-specific one. No environmental sampling will be conducted, only field work, which must be communicated to the Village Council. The scope covers the entire 3.55-acre BIA parcel (DEC hazard ID 4642) containing the Old School Building (now teacher housing), former tank farm, generator building, and storage building. The period of performance is March 1, 2025 to June 30, 2026. All questions should be directed to jodi.zachary@bia.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Phase 1 ESA, Tununak, AK, newest first.
File Type Posted
IEE_Rep_Form.pdf PDF
Sol_140A0525Q0007.pdf PDF
A05_-_PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A0525Q0007 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

A13

Sacramento CA 95825

2800 COTTAGE WAY ROOM W2820

Contracting Office

DOI, BIA PACIFIC

A13

Sacramento CA 95825

2800 COTTAGE WAY ROOM W2820

Contracting Office

BIA PACIFIC 00013

01/21/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/21/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0001 is to extend the due date and publicly release all questions that have been asked on the solicitation to date and the answers provided by BIA.

The due date and time for this RFQ is hereby changed to 2/6/25, 1200 Noon PS.

All interested parties submitting a quotation must complete blocks 8 and 15A-C of this

Amendment AND INCLUDE the completed page 1 of this Amendment with their quotation.

All questions about this amendment shall be emailed to jodi.zachary@bia.gov.

Period of Performance: 03/01/2025 to 06/30/2026

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jodi Zachary

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Page 1 of 1 2.3.2025

RFQ# 140A1325Q0007, Amendment #1 Phase 1 Environment Site Assessment, Tununak, AK

Questions & Answers

1. Task 1 notes that a planning meeting “will occur within one month of the award where the work plan… will be accepted by BIA”. Industry standard practice does not typically include the preparation of a Site-specific Work Plan for Phase I Environmental Site Assessments (ESAs), as the scope of work for these reports is covered extensively in the ASTM International Standard 1527-21 and is summarized within our proposal. Would BIA find it acceptable to use this standard scope of work, along with the summary of work and schedule laid out in our proposal in lieu of a Site-specific Work Plan for this project?

As noted, adherence to ASTM 1527-21 generally does not necessitate site specific work plan. However, many companies performing PH1 ESAs do so for the purposes of a real estate transfer, whereas our focus is on future remediation efforts and eventual site closure. In addition, many contractors do not understand logistics in remote Alaska or relations with Tribal Villages. Yes, BIA would find it acceptable to use this standard scope of work, along with the summary of work and schedule laid out in a quotation in lieu of a Site-specific Work Plan for this project; as long as a there is discussion and understanding of these issues prior to finalization of planning.

2. Task 1 notes that the Contractor shall: “prepare a draft Health and Safety Plan (HASP) in accordance with 29 CFR 1910.120 to ensure worker protection.” While we are more than happy to provide BIA with a site-specific HASP for this project, it is industry standard practice to perform Phase I ESA within the auspices of a general HASP, which our company maintains in accordance with 29 CFR

1910.120. Is it acceptable for the purpose of this project to rely on the standard HASP or should we include in the proposal preparation of a site-specific HASP?

If the contractor has such a mechanism in place, it is acceptable for the purpose of this project to rely on their standard HASP.

3. Task 1 notes that the Contractor shall: “Prepare a draft notice to Native Corporation/Village advising them of the proposed site visit and sampling.” The collection of samples is not typically included within the scope of a Phase I ESA. Is BIA requesting that provisions for sampling be included in the scope of this quote and if so, can you provide specifics about the extent of sampling being requested?

No environmental samples will be collected. In this case sampling should have been replaced with field work. The objective is to communicate what will take place to the Village Council.

4. It is our understanding that the BIA parcel in Tununak is approximately 3.55 acres in size and contains the Old School Building (now teacher housing), a former tank farm, a generator building, and a storage building. Is the entirety of the parcel included within the scope of this Phase I, or just the vicinity of these buildings? It has been our experience that within remote locations property boundaries are often poorly delineated and a professional survey of the property may be required in order to confirm the boundaries of the parcel in question.

The DEC hazard ID for the site is 4642. The entire parcel is included within the scope of work.