14019 Tech Data.docx

DOCX document 25 KB Posted

Attached to
Poly/Wool and Wool Cloths Sources Sought
Solicitation number
SPE1C125R____
Issued by

About this file

This document is a technical data specification for a polyester-wool elastance stretch cloth for the Space Force in Heather Charcoal shade. The specification (11-PD-24-012 dated 5 March 2024) details precise manufacturing requirements for fabric to be produced under roll #23-21, with strict quality control standards including shade evaluation, testing procedures, and packaging requirements. The material is intended for the Defense Logistics Agency (DLA) Troop Support Clothing and Textiles directorate, with comprehensive testing to be conducted at the DLA Product Testing Center in Philadelphia, requiring 45 calendar days for acceptance testing and shade evaluation before shipment. Additional technical requirements include RFID tagging, specific packaging standards, and compliance with Berry Amendment regulations for domestic manufacturing.

View the file

Other files

File Type Posted
TECH DATA PGC91754-.pdf PDF
00667 Tech Data.docx DOCX document
Sources Sought-Cloth.docx DOCX document
TECH DATA PGC93366.pdf PDF
TECH DATA PGC91752-.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PGC14019

NIIN 01-718-7965

CLOTH,POLYESTER,WOOL ELASTANCE STRETCH

Class 2 Space Force Shade Heather Charcoal 1691 SPEC: 11-PD-24-012 DATED: 5 MARCH 2024 Roll-piece 23-21

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND NON-MANUFACTURERS)

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

52.246-15 CERTIFICATE OF CONFORMANCE

ADDITIONAL INFORMATION FOR ANSI/ASQC Z1.4:

NOTE: THE MOST RECENT VERSION OF THIS DOCUMENT SHOULD BE USED.

APPLICATION FOR COPIES SHOULD BE ADDRESSED TO:

AMERICAN SOCIETY FOR QUALITY

600 NORTH PLANKINTON AVENUE

MILWAUKEE, WISCONSIN 53203

(Ref. T0795 - May 17, 2006)

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

a. This solicitation/award consists of the following documents, exhibits, and other attachments

b. DLA Troop Support Clothing & Textiles Additional Quality Assurance Requirements Revision 1 dated August 2021, which has superseded DLA Troop Support Clothing and Textiles Additional Quality Assurance Requirements dated October 2018.

CLOTH, POLYESTER ELASTANE, STRETCH, SHALL BE MADE IN ACCORDANCE WITH 11-PD-24-012 date: 5 March 2024 Class1 Space Force Shade Heather Charcoal 1691 IS AVAILABLE UNDER ROLL #23-21

Additional information for:MIL-STD-655D: Provisions for Evaluating Quality of Cloth Interim changes to: MIL-STD-655D:

PAGE 3, PARA 4.1, ADD "QUALITY LEVEL 7" .

PAGE 5, TABLE I, UNDER QUALITY LEVEL"7", ADD UNDER ENTIRE SAMPLE "7

POINTS PER 100 SQ. YARDS", ADD UNDER INDIVIDUAL ROLLS "10 POINTS PER 100

SQ. YDS." (Ref. T0319) The demerit points per 100sq yds shall not exceed a quality level 12

IAW MIL-STD-655D.

SHADE EVALUATION OF CONTRACTOR FURNISHED MATERIALS:

Government Acceptance Testing. Unless otherwise stated in the contract, testing performed at the DLA PTC for acceptance purposes will be completed in forty five (45) calendar days. The contract delivery requirements are based on the assumption that DLA Troop Support and the DLA PTC will require a total of 45 calendar days from the date of the receipt of samples at the Government laboratory to the date the completed test results are mailed to the contractor.

If this time frame is exceeded, the contract delivery schedule will be extended by the number of additional days needed to complete the testing, provided the contractor can establish that the delay in its delivery was caused by the Government exceeding the prescribed time. The foregoing provision for the extension of delivery schedules is exclusive and the Government shall not be liable to suit for breach of contract by reason of any delay of the Government in providing test results.

Shade Evaluation. Shade Evaluation is Acceptance Testing; each lot must be submitted for evaluation. Lots shall not be shipped until shade is approved by Government. The prime contractor will require the fabric or component supplier to present to the source QAS the complete lot prepared for shipment, a set of tally sheets by shipment listing case numbers, roll numbers, and yardage of each roll and a shade swatch (header) from each roll with roll and case numbers identified on each swatch.

The following sampling procedure will be followed unless otherwise specified.

- SHADE SAMPLING IS APPLICABLE

The color and appearance of the shade sample swatch shall match the standard sample when viewed using the AATCC EP 9, Option C, with a primary light source simulating the spectral quality of average daylight, CIE illuminate D65, with a color temperature of 6500 K (±200 K) illumination of 100 (±20) foot candles. The shade sample swatch shall also be an approximate match to the standard sample with a secondary source simulating the spectral quality of incandescent lamplight, CIE illuminant A, with a color temperature of 2856 K (±200 K).

FOR SHADE TESTING: THE COMPLETED HARDCOPY DD FORM 1222 AND THE SWATCHES SHALL BE FORWARDED TO:

DLA Product Testing Center Analytical 700 Robbins Avenue, BLDG 5D Philadelphia, PA 19111 EMAIL: paactlab@dla.mil

PHONE: 215-737-6121

NOTE: PERMIT 30 CALENDAR DAYS.

FOR PHYSICAL (NON-SHADE) TESTING:

THE VENDOR SHALL NOTIFY THE DLA Product Test Center -- Analytical FOURTEEN (14) CALENDAR DAYS TO THIRTY (30) CALENDAR DAYS IN ADVANCE OF WHEN LOTS ARE TO BE PRESENTED FOR SAMPLING AT THE ADDRESS BELOW.

THE CONTRACTOR'S APPROVED QUALIFIED LABORATORY WILL BE REQUIRED TO FORWARD A COMPLETED TEST REPORT FOR EACH LOT OF COMPONENTS TO THE ADDRESS BELOW. THE SUPPLIER'S SOURCE SAMPLING REPRESENTATIVE WILL PROVIDE THE COMPLETED DD FORM 1222 dated March 2021 TO THE LABORATORY TO BE SUBMITTED WITH THE COMPLETED TEST REPORT. TEST REPORTS SHALL NOT BE OLDER THAN NINETY (90) CALENDAR DAYS.

LOT NOTIFICATIONS AND SOURCE SAMPLING DD1222s/TEST REPORTS SHALL BE FORWARDED TO:

paactlab@dla.mil

SAMPLES FOR PHYSICAL TESTING WILL ONLY BE FORWARDED UPON REQUEST TO:

DLA Product Test Center -- Analytical 700 Robbins Avenue, BLDG 5D Philadelphia, PA 19111 EMAIL: paactlab@dla.mil

NOTE: PERMIT 45 CALENDAR DAYS

SHADE EVALUATION OF CONTRACTOR FURNISHED COMPONENTS

Contracts awarded under this solicitation shall require shade evaluation of Contractor furnished components in accordance with DLA Troop Support Clothing & Textiles Additional Quality Assurance Requirement(Revision1 dated: August 2021) Identification of Testing Sites. Unless the contract mandates a Government laboratory be used to conduct testing, the prime contractor shall identify all testing sites that will perform any test required by the terms of the contract, including end item testing.

Any laboratory proposed by the contractor is subject to the approval of the contracting officer. Testing facilities shall be subject to on-site witnessing of testing by the Government. The use of a laboratory previously approved by the Government is not a guarantee that testing will be performed properly, nor does it relieve a contractor from the contractual obligation to present conforming supplies accompanied by true, accurate, and valid test results.

Certification of Testing Sites. The prime contractor shall identify a technical point of contact for the testing site and provide current contact information. The prime contractor should alert the technical point of contact that the certification process has begun. A current ISO 17025 accreditation whose scope encompasses the contractual testing or equivalent will be accepted. When a testing site and its contact information are provided to DLA Contracting and the DLA Product Specialist, the product specialist will initiate a request for the DLA Product Test Center (DLA-PTC) to certify the lab. This request will be managed via an internal DLA Troop Support process.

In the absence of an appropriate ISO 17025 accreditation, the DLA-PTC will compare all required testing in the contract to the commercial lab capability. If the testing facility is new and/or unknown to the DLA-PTC, a lab certification survey (DLA Form 6005) will be provided for submission.

If the DLA-PTC has a lab survey on file that is less than 3 years old, that survey will be used for the initial evaluation. The DLA-PTC may ask for additional information or clarifications. If the laboratory survey on file is over 3 years old, a new form will be sent out for the testing facility to fill out. During a contract, the laboratory may be asked to fill out another lab survey when the original survey becomes older than 3 years.

Note: The Qualified Laboratories List (QLL) previously maintained by DPSC has been canceled. No testing facility should refer to their previously issued QLL number.

Approval. If the testing facility and its named subcontractors meet the capability of the required testing, the DLA-PTC will notify the DLA Troop Support Product Specialist. Once approved by contracting, the testing facility becomes the Place of Performance and is placed in the contract.

Disapproval. If a testing facility does not meet the testing capability as per the specifications, the prime contractor is asked to submit another laboratory, and the process starts anew.

Note: DLA will require a total of 45 calendar days from the date of the receipt of the request to add a certified testing location to the date the requestor (contractor) is provided a decision of the laboratory certification.

Identification of Testing Sites. Unless the contract mandates a Government laboratory be used to conduct testing, the prime contractor shall identify all testing sites that will perform any test required by the terms of the contract, including end item testing.

The prime contractor shall identify a technical point of contact for the testing site and provide current contact information to DLA Contracting and the DLA Product Specialist. The prime contractor should alert the technical point of contact that the certification process has begun.

Note: DLA will require a total of 45 calendar days from the date of receipt of the request to add a certified testing location to the date the requestor (contractor) is provided a decision of the laboratory certification.

For more details on the lab certification process, see the C&T Additional Quality Assurance Requirements, which is incorporated by reference into this contract.

PRES/PACK TO ASTM-D-3951

EACH ROLL SHALL BE PACKED IN A

POLYETHELENE BAG AS A MINIMUM

PALLETIZATION IS REQUIRED FOR THESE SUPPLIES

NOTE: THE FOLLOWING APPLIES TO ALL NON-MANUFACTURED WOOD PACKAGING

MATERIALS:

"ALL WOOD PACKAGING MATERIAL (WPM) ACQUIRED BY DOD MUST MEET

REQUIREMENTS OF INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES

(ISPM) 15, "GUIDELINES FOR REGULATING WOOD PACKAGING MATERIALS IN

INTERNATIONAL TRADE." DOD SHIPMENTS INSIDE AND OUTSIDE OF THE UNITED

STATES MUST MEET ISPM 15 WHENEVER WPM IS USED TO SHIP DOD CARGO, OR WHEN

WOOD IS BEING ACQUIRED BY DLA FOR FUTURE USE AS PACKAGING MATERIAL. WPM

IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN

BOXES, REELS, DUNNAGE, CRATES, FRAME, AND CLEATS. PACKAGING MATERIALS

EXEMPT FROM THE REQUIREMENTS ARE MATERIALS THAT HAVE UNDERGONE A

MANUFACTURING PROCESS, SUCH AS CORRUGATED FIBERBOARD, PLYWOOD,

PARTICLEBOARD, VENEER, AND ORIENTED STRAND BOARD (OSD). ALL WPM SHALL

COMPLY WITH ONE OF THE FOLLOWING OFFICIAL QUALITY CONTROL PROGRAMS:

HEAT TREATMENT (HT) OR KILN DRIED HEAT TREATMENT (KD HT) IN ACCORDANCE

WITH AMERICAN LUMBER STANDARD COMMITTEE, INCORPORATED (ALSC) WOOD

PACKAGING MATERIAL PROGRAM AND WPM ENFORCEMENT REGULATIONS (SEE

HTTP://WWW.ALSC.ORG/; OR ALL WPM SHALL INCLUDE CERTIFICATION/QUALITY

MARKINGS IN ACCORDANCE WITH THE ALSC OR NWPCA STANDARDS, AS APPLICABLE.

MARKINGS SHALL BE PLACED IN AN UNOBSTRUCTED AREA THAT WILL BE READILY

VISIBLE TO INSPECTORS. PALLET MARKINGS SHALL BE APPLIED TO THE STRINGER

OR BLOCK ON DIAGONALLY OPPOSITE SIDES OF THE PALLET AND BE CONTRASTING

AND CLEARLY VISIBLE. ALL CONTAINERS SHALL BE MARKED ON A SIDE OTHER THAN

THE TOP OR BOTTOM, CONTRASTING AND CLEARLY VISIBLE. ALL DUNNAGE USED IN

CONFIGURING AND/OR SECURING THE LOAD SHALL ALSO COMPLY WITH ISPM 15 AND

BE MARKED WITH AN ASLC APPROVED DUNNAGE STAMP. FAILURE TO COMPLY WITH

THE REQUIREMENTS OF THIS RESTRICTION MAY RESULT IN REFUSAL, DESTRUCTION,

OR TREATMENT OF MATERIALS AT THE POINT OF ENTRY. THE AGENCY RESERVES

THE RIGHT TO RECOUP FROM THE CONTRACTOR ANY REMEDIATION COSTS INCURRED

BY THE GOVERNMENT."

PALLET SHALL BE 4 WAY ENTRY, WINGED TYPE. PALLETIZED LOAD DIMENSIONS

SHALL NOT EXCEED 43 INCHES IN LENGTH, 52 INCHES IN WIDTH, AND 54 INCHES

IN HEIGHT (INCLUDING THE PALLET).

THE PALLETIZED LOAD SHALL BE BONDED USING APPROVED COMMERCIAL BONDING

MATERIALS. THE USE OF METAL BANDING, IN SECURING BOXES TO PALLETS, IS

DISCOURAGED. PALLET LOADS SHALL CONTAIN THE SAME NUMBER OF CARTONS, OF

IDENTICAL QUANTITIES, OF ONE NSN, TO THE MAXIMUM EXTENT POSSIBLE.

PALLET LOADS CONTAINING MORE THAN ONE NSN SHALL BE CLEARLY MARKED TO

LIST ALL THE NSN'S CONTAINED IN THE LOAD. NO CARTON SHALL HAVE MORE THAN

ONE NSN. AT THE END OF A SIZE RUN, NO MORE THAN ONE CARTON PER NSN

MAYBE SHORT OR OVER THE SPECIFIED QUANTITY. SAID CARTON SHALL BE

CLEARLY MARKED "SHORT" OR "OVER".

MIL-STD-147 IS REFERENCED FOR PALLETIZED LOADS. IN ADDITION TO

REQUIREMENTS SPECIFIED ABOVE THE FOLLOWING CLAUSE ALSO APPLIES:

52.247-9012 - REQUIREMENTS FOR TREATEMENT OF WOOD PACKAGING MATERIALS.

OMISSION OF MARKINGS ON EXTERIOR SHIPPING CONTAINERS OF ITEMS IN THE DLA

TROOP SUPPORT CLOTHING AND TEXTILE (C&T) DIRECTORATE:

THE NOMENCLATURE AND MANUFACTURER'S NAME (WHEN THE NAME IDENTIFIES THE

MATERIAL) SHALL BE OMITTED FROM ALL EXTERIOR SHIPPING CONTAINERS OF DLA

TROOP SUPPORT C&T ITEMS, REGARDLESS OF MODE OF SHIPMENT.

IF THE MANUFACTURER'S NAME DOES NOT IDENTIFY THE MATERIAL AS BEING

CLOTHING, IT MAY REMAIN. NSNS SHALL BE SHOWN ON ALL SHIPPING

CONTAINERS OF C&T ITEMS, THE PACKING LIST SHALL BE PLACED INSIDE THE

LAST CONTAINER TO BE LOADED FOR EACH SHIPMENT. THE WORDS "PACKING LIST

HERE" SHALL BE STENCILED, NOT HAND LETTERED, ON THE CONTAINER.52.246-11

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999) ANSI/ISO/ASQ

Q9001-2015(EXCLUDING PARA 7.3) OR EQUIVALENT. CERTIFICATION OR

REGISTRATION OF A CONTRACTOR'S QUALITY SYSTEM OR PROGRAM IS NOT REQUIRED

BY DOD IF ISO OR ANSI/ASQ STANDARDS ARE USED.

Examine Defect Marking

OMITTED, INCORRECT, ILLEGIBLE, OF IMPROPER (EXTERIOR AND SIZE, LOCATION,

SEQUENCE, OR METHOD OF INTERIOR) APPLICATION.

MATERIALS: ANY COMPONENT MISSING, DAMAGED, OR NOT AS SPECIFIED.

WORKMANSHIP: INADEQUATE APPLICATION OF COMPONENTS, SUCH AS: INCOMPLETE

CLOSURE OF FLAGS, LOOSE STRAPPING, IMPROPER TAPING, INADEQUATE STAPLING,

BULGED OR DISTORTED CONTAINERS.

CONTENT NUMBER OF ITEMS PER SHIPPING CONTAINER IS MORE OR LESS THAN

REQUIRED. SIZE SHOWN ON ONE OR MORE ITEMS NOT AS SPECIFIED ON SHIPPING

CONTAINER. 1/1/ FOR THIS DEFECT, ONE ITEM FROM EACH SHIPPING

CONTAINER IN THE SAMPLE SHALL BE EXAMINED

THE CONTRACTOR SHALL STAMP LEGIBLY WITH INDELIBLE INK THE LOT NUMBER ON

EACH END ITEM AND OUTER CONTAINER IN THE LOT.

52.246-2 INSPECTION OF SUPPLIES – FIXED – PRICE

CERTIFICATION OR REGISTRATION OF A CONTRACTOR’S QUALITY SYSTEM OR

PROGRAM IS NOT REQUIRED BY DoD IF ISO OR ANSI/ASQ STANDARDS ARE USED

An RFID inlay shall be added to the barcode paper hang tag attached to each item. Where the use of self-adhesive bar-code labels are authorized, the RFID inlay may be added to the self-adhesive label in lieu of a paper hang tag. All other contract barcode and hang tag requirements still apply.

The RFID inlay should be passive Gen2 with a frequency range between 860 and 960 MHz. The RFID antenna should be Avery/Dennis AD222 or comparable with ISO/IEC 18000-C EPCglobal C1G2 Protocol and an EPC memory allocation containing a 96 bit EPC Number. The data linking the EPC number to the NSN and quantity unit pack must be exportable to VIM/ASAP.

The bar code of the EPC Number must be printed at the bottom of the tag along with the human readable version below the bar code.

In addition to defects applicable to the paper tag and barcoding element, the RFID tag shall be examined for the defects listed below:

RFID Inlay omitted RFID Inlay not secure RFID Inlay not laying flat when packaged RFID Inlay not readable with RFID scanner RFID Inlay or configuration not as specified The manual "Item-Level Passive RFID Technology Manufacturer's Information Guide" provides guidance on RFID implementation and is available from the contracting officer.

File details come from the government source that posted it. Updated .