This is a Cost Proposal Form for Solicitation # USBE-MI27009-RFP, issued by the Utah State Board of Education (USBE) for the procurement of electric school buses with optional chargers through cooperative contracts. The RFP seeks to provide battery-electric school buses compliant with USBE/NCST 2025/R277-601 standards for use by Utah Local Education Agencies (LEAs), USBE, the Utah Schools for the Deaf and Blind (USDB), and other eligible users. Offerors must complete all mandatory cost fields in the orange-highlighted sections of the spreadsheet, providing per-unit pricing for a five-year contract term, with detailed cost breakdowns submitted as separate attachments. The form evaluates proposals based on the Grand Total Cost Per Unit across the five contract years; the contract may include five additional one-year renewal options at USBE's discretion, though renewal option pricing is not scored in the evaluation.
The mandatory scored costs include three line items per year: the all-inclusive base price of the battery-electric school bus, delivery price to Utah LEA locations, and any other mandatory costs such as training materials or technical assistance, all calculated on a per-unit basis. Optional items not scored in the evaluation include charger procurement (Level 2 chargers, DC Fast chargers, and annual software subscriptions), installation and site preparation, electrical infrastructure upgrades, and additional training and support. Offerors proposing chargers must comply with all Scope of Work requirements and complete the Charger Software Disclosure Table for each charger model; failure to provide complete charger responses will result in the charger component being deemed non-responsive, though the associated bus proposal will still be evaluated independently. Contractors must honor submitted pricing for all eligible users who wish to purchase directly; however, there is no guarantee of minimum purchase volumes or exclusive supply rights to Utah LEAs, and multiple awards may be made.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7-Evaluation Score Sheet (final).pdf | ||
| 11-RFP Prerequisites Document.pdf | ||
| 12-Scope of Work (final).pdf | ||
| 1-Changing+Your+Time+Zone.pptx | PPTX presentation | |
| 6-Att. A - USBE Standard Cooperative TsCs for Goods and Services (rev. 8-2026).docx | DOCX document | |
| 4-Att. B - USBE IT Terms and Conditions.docx | DOCX document | |
| 3-PII+Questionnaire (1).xlsx | XLSX spreadsheet | |
| 15-Charger Software Disclosure Table.docx | DOCX document | |
| 2-GRAMA-business-confidentiality.pdf | ||
| 10-R277-601.pdf | ||
| 13-Technical Evaluation Criteria (final).pdf | ||
| 8-Mandatory Minimum Requirements (final).pdf | ||
| 9-R277-600.pdf | ||
| 5-USBE Contractor COI Form.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mandatory (Scored) Costs
SOLICITATION # USBE-MI27009-RFP
ELECTRIC SCHOOL BUS (WITH OPTIONAL CHARGERS) COOPERATIVE CONTRACTS RFP
COST PROPOSAL FORM
INSTRUCTIONS: Please complete all applicable ORANGE fields below. If any cost is “$0” or not applicable, clearly indicate so. If you have any questions or concerns regarding this cost proposal form, please submit a question during this RFP’s question and answer period. Any deviation from this format may result in disqualification of your proposal.
Evaluation shall be based on the GRAND TOTAL COST PER UNIT for the FIVE (5) YEARS of the contract.
Please submit separate pages detailing your per-year cost breakdown. You MUST still submit this completed Cost Proposal Form.
Please note that any contract resulting from this RFP may include five (5) additional one-year renewal options. These renewal option years MAY be exercised at USBE’s discretion. While not scored, please provide the costs associated with these additional renewal option years.
Contractor must honor any submitted pricing for all Eligible Users who may wish to utilize the cooperative contracts and purchase directly from them; however, there is no guarantee that Eligible Users will utilize the cooperative contracts. Furthermore, due to the potential for multiple awards, an award does not guarantee any minimum volume of sales or exclusive rights to supply buses to Utah LEAs.
NOTE: Any formulas entered into this form have been entered as a courtesy, and it is solely the responsibility of each Offeror to ensure that all information entered into this spreadsheet--including mathematical calculations--are complete and accurate.
| ITEM | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
| 1 | All-inclusive Base Price of battery-electric school bus (USBE/NCST 2025/R277-601 compliant) (per unit). (Note: You must list and provide the breakdown of costs in a separate attachment.) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Delivery Price to Utah LEA location (per unit). | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Any other mandatory costs of using your proposed solution for meeting the requirements of this RFP (i.e. training materials, technical assistance, etc.) (per unit) Leave blank if not applicable. (Note: You must list and provide the breakdown of costs in a separate attachment, if applicable.) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ANNUAL PRICE PER UNIT TOTALS†: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| GRAND TOTAL COST PER UNIT†: | $ - 0 | |||||
| †Calculated by USBE. |
| ITEM | Renewal Option Year 1 | Renewal Option Year 2 | Renewal Option Year 3 | Renewal Option Year 4 | Renewal Option Year 5 | |
| 1 | All-inclusive Base Price of battery-electric school bus (USBE/NCST 2025/R277-601 compliant) (per unit). (Note: You must list and provide the breakdown of costs in a separate attachment.) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Delivery Price to Utah LEA location (per unit). | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Any other mandatory costs of using your proposed solution for meeting the requirements of this RFP (i.e. training materials, technical assistance, etc.) (per unit) Leave blank if not applicable. (Note: You must list and provide the breakdown of costs in a separate attachment, if applicable.) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ANNUAL PRICE PER UNIT TOTALS†: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| GRAND TOTAL COST PER UNIT†: | $ - 0 | |||||
| †Calculated by USBE. |
Optional Items - Not Scored
SOLICITATION # USBE-MI27009-RFP
ELECTRIC SCHOOL BUS (WITH OPTIONAL CHARGERS) COOPERATIVE CONTRACTS RFP
COST PROPOSAL FORM FOR OPTIONAL ITEMS
Use this tab to provide pricing on any additional items that are NOT required to use your proposed solution and are NOT listed as a requirement in this RFP. Items listed below are subject to inclusion in the contract resulting from this RFP and may be purchased at USBE's option, but they will NOT be included in the Offeror's Proposed Price and will not be used in the evaluation of cost points.
INSTRUCTIONS: Please complete all fields below. If any cost is “$0” or not applicable, clearly indicate so. If you have any questions or concerns regarding this cost proposal form, please submit a question during this RFP’s question and answer period. Any deviation from this format may result in disqualification of your proposal. Where applicable, provide a detailed breakdown of the per-year costs for each item.
Charger procurement is an optional component of this RFP. Utah LEAs may choose to: (1) accept a charger proposal bundled with a bus proposal from the same vendor; (2) solicit charger proposals separately from EVSE-only vendors; or (3) procure chargers through a separate procurement process entirely. Any vendor wishing to include a charger proposal must comply with ALL requirements in the Scope of Work. Failure to provide complete charger responses will result in the charger component being deemed non-responsive; however, the associated bus proposal will still be evaluated independently. All vendors submitting charger proposals must complete the Charger Software Disclosure Table in the Scope of Work for EACH charger model proposed. Attach additional completed tables if proposing multiple charger models. PLEASE REFER TO THE SCOPE OF WORK AND CHARGER SOFTWARE DISCLOSURE TABLE FOR FURTHER DETAILS.
Any formulas entered into this form have been entered as a courtesy, and it is solely the responsibility of each Offeror to ensure that all information entered into this spreadsheet--including mathematical calculations--are complete and accurate.
| CHARGER OPTIONAL ITEMS | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
| 1 | Level 2 Charger Unit (per unit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | DC Fast Charger Unit (per unit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Annual Software Subscription — if proprietary (per charger, per year) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Installation / Site Preparation (estimated) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | Electrical Infrastructure Upgrade (estimated) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ADDITIONAL OPTIONAL ITEMS | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
| 1 | Any additional training and support, etc., NOT required to complete the Scope of Work (Note: You must list and provide the breakdown of costs in a separate attachment, if applicable.) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CHARGER OPTIONAL ITEMS | Renewal Option Year 1 | Renewal Option Year 2 | Renewal Option Year 3 | Renewal Option Year 4 | Renewal Option Year 5 | |
| 1 | Level 2 Charger Unit (per unit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | DC Fast Charger Unit (per unit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Annual Software Subscription — if proprietary (per charger, per year) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Installation / Site Preparation (estimated) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | Electrical Infrastructure Upgrade (estimated) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ADDITIONAL OPTIONAL ITEMS | Renewal Option Year 1 | Renewal Option Year 2 | Renewal Option Year 3 | Renewal Option Year 4 | Renewal Option Year 5 | |
| 1 | Any additional training and support, etc., NOT required to complete the Scope of Work (Note: You must list and provide the breakdown of costs in a separate attachment, if applicable.) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | [Other] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |