This is a mechanical systems design document prepared for the University of Wisconsin Oshkosh Intramural Recreation Field Complex, developed by the State of Wisconsin Department of Administration Division of Facilities Development in collaboration with RD Architecture. The document provides detailed mechanical sections and specifications for the installation of two air handling units (AHUs) at the Rec Plex facility located at 140 Osceola Street in Oshkosh, Wisconsin. The project includes comprehensive HVAC system design with specifications for ductwork routing, refrigerant linesets, natural gas piping, flexible connections, and mechanical room configurations across multiple building levels. The design accommodates various building spaces including lobbies, vestibules, restrooms, electrical rooms, and mechanical rooms, with elevation details ranging from ground level (96' top of footings) to roof level (118'). All inquiries regarding this bid opportunity should be directed to Susan Poff at UW Oshkosh Facilities Management - Purchasing at 920-424-2006 or poffs@uwosh.edu.
The mechanical sections document establishes the technical requirements for HVAC component installation, including specifications for cooling coils, energy recovery ventilators (ERV-1), pipe portals, natural gas regulator systems, and temporary capping of gas piping pending plumbing contractor final connections. The design specifications indicate integration with Division 23 utility connections and reference additional detail specifications contained in drawing M500. The document was issued on November 28, 2016, with a revision date of August 23, 2017, indicating an active design development timeline. No specific pricing terms, set-aside provisions, funding sources, or contract award dates are contained within this technical drawing file.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 13A1M-00-CD-C310 (1).pdf | ||
| Questions and Answers.pdf | ||
| Amendment 1- Rec Plex AHU.pdf | ||
| UPDATED Questions and Answers.pdf | ||
| 13A1M-00-CD-E201L.pdf | ||
| Tab 6 AHUs.pdf | ||
| 13A1M-00-CD-E201PT.pdf | ||
| Rec Plex AHU RFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Level 1 100' - 0"
Level 2 113' - 4"
ROOF
118' - 0"
T/O FOOTINGS
96' - 0"
LOBBY
EWH-2 EWH-1
16ø
SG-3
(345)
1 1/2" NG
ABD C
REMOVE CABLE
OPERATED
VOLUME DAMPER
VESTIBULE
Level 1 100' - 0"
Level 2 113' - 4"
T/O FOOTINGS
96' - 0"
WOMEN
MEN
12/26
8ø 6ø
1 1/2" NG
16/20
16ø FLEX
A B DC
RL
RS
24/16
L-1
ROUTE DUCTWORK BETWEEN
STRUCTURAL MEMBERS
16/24
Level 1 100' - 0"
Level 2 113' - 4"
EWH-4
IT/ELEC. ROOM
7 8 9
1" CWW
AC-2
REFRIGERANT LINESET AND
CONDUIT IN LINE-HIDE SET
Level 1 100' - 0"
Level 2 113' - 4"
TCP-1
EWH-3
/2
FILTER AND
FILTER HOUSING
GF-1
24" TALL ANGLE IRON
PIPE STAND BY M.C.
MECH. ROOM
FLEXIBLE CONNECTION
12/24
COOLING COIL
16/20
/2
OUTSIDE AIR
CONNECTION TO
RETURN DUCT SYSTEM
10/44 L-3
MOD-2
16ø
8/16
FLEXIBLE
CONNECTION
20/20
BLANK OFF
7 8 9
TCP-2
3/4" NG
REFRIGERANT
LINESET
Level 1 100' - 0"
Level 2 113' - 4"
16/20 14/44
ERV-1
MECH. ROOM
12ø
12ø
12ø
12ø
10/44
L-3
1" NG
TEMPORARILY CAP NATURAL GAS PIPING.
PLUMBING CONTRACTOR SHALL PROVIDE
FINAL CONNECTION TO WATER HEATER.
VF-1
1" CWW
PIPE PORTAL (24"X36")
10ø
MOD-2
MOD-1
Level 1 100' - 0"
Level 2 113' - 4"
ROOF
118' - 0"
T/O FOOTINGS
96' - 0"
D
UTILITY PROVIDED
NATURAL GAS
METER (REFER TO
DETAIL 13 ON M500).
NOT IN CONTRACT.
DIVISION 23
POINT OF
CONNECTION.
4" NG
1 1/2" NG
4" NG
4" NG TO DOME
AHU'S.
1-1/2" NG TO
GENERATOR.
1-1/2" NG TO
BUILDING
NATURAL GAS SHUT
OFF VALVE (TYP.).
GAS REGULATOR
BUILDING
GAS REGULATOR
2-1/2" NG TO
GENERATOR.
KEYED NOTES:
LOUVER PLENUM BOTTOMS SHALL SLOPE TO THE EXTERIOR OF
THE BUILDING. REFER TO LOUVER DETAIL 6 ON M500.
2' 4'1'0' c o r p o r a t i o n
B u s in e s s P a rk
D r.
S te v e n s P o in t, W
I
T e le p h o n e
F a x e m a il:
i n fo re tt le r.
c o m
W e b s te r:
w w w
.r e tt le r.
c o m
Number
Date Issued
Sheet
Set Type
DFD
Number
Graphic Scale
Revisions:
S h e e t T it le
O s c e o la
S tr e e t
O s h k o s h W is c o n s in
S ta te o f W is c o n s in
D e p a rt m e n t o f A d m in is tr a ti o n
D iv is io n o f F a c il it ie s D e v e lo p m e n t
17400 West Capitol Drive Brookfield, WI 53045 Phone: 414.778.1700 Fax: 414.778.2360 E-Mail: r-d@ringdu.com RD Project No: 214050.01
In tr a m ur al R ec re at io n F ie l d
C om p l ex
U ni v e rs ity o f W is co ns in O s h ko sh O sh ko sh , W
I
C U s e rs
\g u e p a \D o c u m e n ts
\4
.0
M -1 g u e p a
.r v t
/1
/2
:4
:0
A M
M300
M E
C H
A N
IC
A
L S
E C
T
IO
N S
11/28/2016
13A1M
BD
1/4" = 1'-0"
MECHANICAL SECTION AT LOBBY AND VESTIBULE
1/4" = 1'-0"
MECHANICAL SECTION AT RESTROOMS
1/4" = 1'-0"
SECTION AT ELECTRICAL ROOM 111
1/4" = 1'-0"
SECTION AT MECHANICAL ROOM FACING PLAN NORTH
1/4" = 1'-0"
SECTION AT MECHANICAL ROOM FACING PLAN SOUTH
1/4" = 1'-0"
NATURAL GAS PIPING SECTION
No. Date Description
8/23/2017
CD
| 4051.01 M-15_guepa |
| Sheet: M300 - MECHANICAL SECTIONS |
File details come from the government source that posted it. Updated .