13A1M-00-CD-E201PT.pdf

PDF 406 KB Posted

Attached to
Air Handling Units for Rec Plex
Solicitation number
SP-22-145
Issued by
Winnebago County, Wisconsin

About this file

This file is a First Floor Plan for Power and Technology for the Intramural Recreation Field Complex at the University of Wisconsin Oshkosh, prepared by the State of Wisconsin Department of Administration, Division of Facilities Development. The document is a bid drawing (dated August 23, 2017) that details electrical, power, and technology infrastructure requirements for the recreation facility located at 140 Osceola Street, Oshkosh, Wisconsin. The plan specifies the placement of electrical components including wall-mounted network equipment cabinets, conduit routing for low-voltage circuits, camera and wireless access point locations, overhead door motor controls, generator wiring, field lighting control panels, and fire suppression monitoring systems. The drawing indicates the layout of various rooms including offices, storage, mechanical rooms, restrooms, and athletic spaces, with specific notations for equipment mounting, conduit specifications (including 3-inch EMT conduits, 3/4-inch conduits, GRC conduit, and HDPE direct bore conduit), and control wiring requirements per manufacturer specifications.

The document serves as a technical reference for bidders and the electrical contractor responsible for providing complete access control and security systems, rough-in work, devices, and all associated wiring. Key specifications include provisions for future scoreboard connections, manual control push buttons for dome and athletic field lighting, multi-mode fiber optic cable installation from fire suppression monitoring to the telecommunications rack, and coordination with the generator installation. The plan references additional detailed specifications in Section 27 11 00 and architectural drawings for elevation details and equipment mounting locations, establishing the comprehensive technical framework for the electrical and technology infrastructure bid submitted by the electrical contractor for the recreation complex project.

View the file

Other files

File Type Posted
13A1M-00-CD-C310 (1).pdf PDF
Questions and Answers.pdf PDF
Amendment 1- Rec Plex AHU.pdf PDF
UPDATED Questions and Answers.pdf PDF
13A1M-00-CD-E201L.pdf PDF
13A1M-00-CD-M300.pdf PDF
Rec Plex AHU RFB.pdf PDF
Tab 6 AHUs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

FD

FD

FDFD

S

S

S

SS

S S

S

S

SS

S

T

S

S

S

S S

S

S

S

S

S

S

S

S

MM

MM

2 3 4 5 6 7 8

A

B

D

C

NHA

MSB

1NLA

T

NLA

NHA

EM

ECB

EM

ATS

1ELA

T

ELA

OSB

ECB

OSB

ATS

1OSBLA

T

OSBLA

1/NLA-6

GFI

1/NLA-6

GFI

1/NLA-6

GFI

1/NLA-6

GFI

1/NLA-6

1/NLA-7

1/NLA-4

1/NLA-7

DD

1/NLA-4

DD

1/NLA-4

DD

1/NLA-2

DD

1/NLA-2

1/NLA-2

1/NLA-2

WP

GFI

1/NLA-5

1/NLA-5

GFI

1/NLA-1

GFI

1/NLA-1

GFI

1/NLA-3

WP

GFI

1/NLA-3

GFI

1/NLA-1

GFI

1/NLA-1

WP

GFI

1/OSBLA-6

1/OSBLA-6

1/OSBLA-6

1/OSBLA-6

WP

GFI

1/OSBLA-6

WP

GFI

1/NLA-5

D,3D

D,3D

D,3D D,3D

VEND

1/NLA-11

VEND

1/NLA-9

WAP

CLG,2D

CR

ES

RM

DCDC

PT CR/EL

ES

RM

DCDC

CR

AO

1/ELA-5

AO

AO

AO

1/ELA-1

AO

AO

AO

AO

AO

1/ELA-3

SEC

1/NLA-7

CR/EL

PT

EHA

OSBHA

ANN

GEN

GEN1

SG1

MSBNHA

T

TR

1/NLA-10

TR

1/OSBLA-1

D,3D

GFI

1/NLA-6

GFI

1/NLA-6

DC ES

CR

OHD

1/OSBLA-4

M

OHD

1/OSBLA-3

M

HTR BATT

UGH-1

EWH-1

EWH-2

EWH-6

SEC

GF-1

TCP-1

TCP-2

EWH-3

AC-2

EWH-4

EWH-5

VF-2

M

VF-1

M

ERV-1 M

ACCU-3

M

WH-1

CP-1M

EWC-1

S,2D

S,P2P

AT&T

LOBBY

LOUNGE / VENDING

STORAGE/ PASS THRU

OFFICE

JC

IT/ELEC. ROOM

MECH. ROOM

EMERG. ROOM

UNISEX

MEN

WOMEN

VESTIBULE

HALLWAY

C-05

WAP

S,1D

C-01

RM

W,1D C-03

C-02

C-04

WAP

CLG,2D

D,3D

NHB

DC

DC

E503

M

ACCU-1 M

ACCU-2

M

AC-1

DR

NL-20

WA

NL-22

OHS

NL-23

WP

GFI

1/OSBLA-12

TS

FS

FAHS

FA

2' 4'1'0' c o r p o r a t i o n

B u s in e s s P a rk

D r.

S te v e n s P o in t, W

I

T e le p h o n e

F a x e m a il:

i n fo re tt le r.

c o m

W e b s te r:

w w w

.r e tt le r.

c o m

Number

Date Issued

Sheet

Set Type

DFD

Number

Graphic Scale

Revisions:

S h e e t T it le

O s c e o la

S tr e e t

O s h k o s h W is c o n s in

S ta te o f W is c o n s in

D e p a rt m e n t o f A d m in is tr a ti o n

D iv is io n o f F a c il it ie s D e v e lo p m e n t

17400 West Capitol Drive Brookfield, WI 53045 Phone: 414.778.1700 Fax: 414.778.2360 E-Mail: r-d@ringdu.com RD Project No: 214050.01

In tr a m ur al R ec re at io n F ie l d

C om p l ex

U ni v e rs ity o f W is co ns in O s h ko sh O sh ko sh , W

I

C R e v it L o c a lF ile s \4

.0

E

-1 ro b n e

.r v t

/1

/2

:1 :2

P

M

E201PT

F

IR

S T

F L O

O R

P L A

N

P O

W E

R A

N D

T E

C H

N O

L O

G Y

8/23/2017

13A1M

CD

KEYED NOTES -

12.

13.

14.

15.

16.

17.

PROVIDE (2) 3" CONDUITS WITH PULL STRING FOR FUTURE

SCOREBOARD.

PROVIDE PUSH BUTTON TO ALLOW MANUAL CONTROL OF DOME

LIGHTING RECEPTACLES. PROVIDE 3/4" CONDUIT TO PANEL

1/NHA AND CONTROL WIRING PER MANUFACTURERS

REQUIREMENTS.

HDPE CONDUIT. REFER TO DETAIL 7/E501.

PROVIDE PUSH BUTTON TO ALLOW MANUAL CONTROL OF WEST

ATHLETIC FIELD LIGHTING. PROVIDE 3/4" CONDUIT TO ATHLETIC

LIGHTING CONTROL PANEL AND CONTROL WIRING PER

MANUFACTURERS REQUIREMENTS.

PROVIDE PUSH BUTTON TO ALLOW MANUAL CONTROL OF EAST

ATHLETIC FIELD LIGHTING. PROVIDE 3/4" CONDUIT TO ATHLETIC

LIGHTING CONTROL PANEL AND CONTROL WIRING PER

MANUFACTURERS REQUIREMENTS.

LOCATION OF FIRE SUPPRESSION MONITORING PANEL. PROVIDE

A MULTI MODE FIBER OPTIC CABLE FROM THE FIRE

SUPPRESSION MONITOR PANEL TO TELECOMMUNICATIONS

RACK LOCATED IN ROOM 111.

1/4" = 1'-0"

FIRST FLOOR PLAN - POWER AND TECHNOLOGY

SHEET NOTES -

COMPLETE ACCESS CONTROL/SECURITY SYSTEM INCLUDING

ROUGH-IN, DEVICES, AND WIRING SHALL BE PROVIDED BY

THE E.C. REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

PLAN

NORTH

TRUE

NORTH

No. Date Description

KEYED NOTES -

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

WALL-MOUNTED NETWORK EQUIPMENT CABINET. MOUNT

SO THAT HINGE IS ON LEFT SIDE OF CABINET. ALLOW OPEN

WALL SPACE TO THE ROOM CORNER FOR CABINET OPENING.

SEE SPEC SECTION 27 11 00 FOR FURTHER INFORMATION.

3 - 3" EMT CONDUITS FOR LOW VOLTAGE CIRCUITS. ROUTE

ABOVE LAY IN GRID CEILING.

EXTERIOR MOUNT PTZ CAMERA. MOUNT TO FLUSH

ELECTRICAL OUTLET BOX. REFER TO ARCHITECTURAL

DRAWINGS FOR ELEVATION.

EXTERIOR MOUNTED WIRELESS ACCESS POINT. MOUNT TO

FLUSH ELECTRICAL OUTLET BOX. REFER TO

ARCHITECTURAL DRAWINGS FOR ELEVATION.

PROVIDE 3/4" CONDUIT BETWEEN OVERHEAD DOOR MOTORS

FOR CONTROL CIRCUITS.

ROUTE FEEDERS, CIRCUIT, AND ENGINE START WIRING

UNDER SLAB TO GENERATOR.

GRC CONDUIT BY E.C.

GRC TO HDPE COUPLING. BY E.C.

HDPE DIRECT BORE CONDUIT BY E.C.

48" MAIN GROUND BAR.

LOCATION OF FIELD LIGHTING CONTROL PANEL.

1.

BD 11/28/16 BID DRAWINGS

File details come from the government source that posted it. Updated .