13558-20241105102322 BAY ST LOUIS.pdf
PDF 8 KB Posted
- Attached to
- 13558-20241105102322 Bay St Loui
- Solicitation number
- 3170030897
- Issued by
- Hancock County, Mississippi
About this file
This document appears to be a newspaper advertisement for a contract opportunity related to the boiler replacement project at West Hancock Elementary School in Picayune, Mississippi. The advertisement provides details on the scope of work, which includes the demolition of the existing electric boiler and associated piping, accessories, and electrical components, as well as the installation of two new electric boilers and related systems. The bid due date is December 12th at 2:00 pm. No additional details are provided regarding site visits, bidder's conferences, or the contract term and renewal options.
The advertisement does not contain information on pricing terms, set-asides, incumbents, funding requirements and sources, or other salient details. It appears to be a straightforward notification of the upcoming boiler replacement project at the elementary school.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAY ST LOUIS NEWSPAPERS
PO BOX 2009
835 HWY 90, STE 8
BAY ST LOUIS MS 39521
(228)467−5474 Fax (228)467−0333
ORDER CONFIRMATION
Salesperson: HOUSE ACCOUNT Printed at 11/01/24 13:06 by dfaul−lm Acct #: 1237 Ad #: 57051 Status: New WHOLD
MACHADO / PATANO, PLLC Start: 11/07/2024 Stop: 11/14/2024 918 HOWARD AVE SUITE F Times Ord: 2 Times Run: *** BILOXI MS 39530−4118 40LEG 1.00 X 2.16 Words: 39
Total 40LEG 2.16 Class: D101 LEGALS Rate: LEG01 Cost: 11.58 # Affidavits: 1 Ad Descrpt: BOILER REPLACEMENT
Contact: MELANN Descr Cont: BOILER REPLACEMENT WEST H Phone: (228)388−1950 Given by: * Fax#: (000)000−0000 P.O. #:
Email: dstyron@mpdesigngroup.us, mm Created: dfaul 11/01/24 12:52 Agency: Last Changed: dfaul 11/01/24 13:05
PUB ZONE EDT TP RUN DATES
40SE A 93 S 11/07,14
AUTHORIZATION
Under this agreement rates are subject to change with 30 days notice. In the event of a cancellation before schedule completion, I understand that the rate charged will be based upon the rate for the number of insertions used.
Name (print or type) Name (signature)
Boiler Replacement
West Hancock Elementary School 23350 Highway 43 Picayune, MS 39466
Bid Date/Time: 12/12, 2:00 pm
Description:
Demolition of existing electric boiler, associated piping, ac-cessories, and electrical
Installation of two new electric boilers, associated piping, ac-cessories, and electrical
File details come from the government source that posted it. Updated .