This is a Solicitation, Offer, and Award (SF 1442) for a firm-fixed-price construction contract for the removal and replacement of emergency power infrastructure at the National Institute of Standards and Technology (NIST) Boulder Campus. The National Institute of Standards and Technology, under the Department of Commerce, is seeking a contractor to remove the existing standby emergency generator (Onan Model 11-5GNAB-90901A) and Automatic Transfer Switch (ATS) identified as EMG-003, and provide and install new equipment serving Building 4. The contractor must furnish two generator options (one natural gas unit and one diesel unit) with minimum output of 12 kW, 208V, three-phase, and 40 amps under full load conditions, accounting for altitude derating. The new ATS must be fully compatible with the selected generator, include a NEMA 1 aluminum indoor enclosure, and support the same electrical specifications. Work includes disconnecting existing electrical leads, installing new three-phase building electrical connections, conduit, and wiring in compliance with the National Electrical Code (NEC) and NFPA standards. All work must be completed within 90 days from issuance of the Notice to Proceed and performed during regular business hours (Monday-Friday, 0600-1900 Mountain Time, excluding federal holidays and NIST closures).
This is a total small business set-aside with NAICS code 238210 and a small business size standard of $19.0 million. The contractor must submit a detailed site-specific Safety Plan within 10 days of award and obtain acceptance before the Notice to Proceed is issued. Additional deliverables include final project schedule (Microsoft Project format), generator and ATS specifications, electrical and conduit specifications, Daily Job Hazard Analysis, and acceptance testing compliance reports per NFPA 110 Sections 7.13 and 7.13.4. Payment is 100 percent upon completion and Government acceptance of the fully installed system following successful testing. A pre-proposal site visit is highly recommended with a mandatory post-award construction meeting. Proposals are due Wednesday, August 12, 2026, with a pre-bid conference and site visit scheduled for Thursday, July 23, 2026 at 1 p.m. Questions must be submitted by Thursday, July 30, 2026. The contract includes standard FAR clauses for construction, wage rate requirements (Davis-Bacon Act compliance), small business compliance, safety and security requirements, and performance testing and acceptance criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1333ND26RNB190034 002.pdf | ||
| 1333ND26RNB190034 001.pdf | ||
| Section J Attachments.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
See Attached
STANDARD FORM 1442 (REV. )
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( )
20b. SIGNATURE 20c. OFFER DATE
STANDARD FORM 1442 (REV. ) BACK
Attachment Page
PAGE 3 OF 116 1333ND26RNB190034
SF 1442 BLOCK 10 (CONTINUED)
Project: Building 4 Generator and ATS Replacement
Enter Price(s) in Section B.
This acquisition is a total small business set aside.
The NAICS for this acquisition is 238210; the Small Business Size Standard is $19.0 Million.
Verbal explanations given before award WILL NOT BE BINDING. Any changes will be made in writing by issuing amendment(s).
Offeror(s) shall acknowledge receipt of amendment(s) in block 19 of the SF 1442 or by returning a signed copy of the amendment(s) with their offer.
Notice to Proceed will not be issued until the contractor's Site Specific Safety Plan has been accepted.
Any award resulting from this solicitation will be subject to the City of Boulder Sales/Use Tax. No exemption certificate issued by the Colorado Department of Revenue or any other taxing authority shall be recognized as a basis for exemption from the City of Boulder Sales/Use Tax.
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Contractor shall provide all labor, equipment, and materials to accomplish the work set out in the attached
SOW.
Building 4 Generator and ATS Replacement
1.00 JB
PAGE 4 OF 116 1333ND26RNB190034
Table of Contents
SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 SOW - B4 Generator and ATS Replacement
SECTION E INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E.2 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
SECTION F DELIVERIES OR PERFORMANCE
F.1 52.242-14 SUSPENSION OF WORK (APR 1984)
SECTION G CONTRACT ADMINISTRATION DATA
G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
G.3 NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
G.4 NIST LOCAL-54ELECTRONIC BILLING INSTRUCTIONS
G.5 NIST LOCAL-56INVOICING PROCESSING PLATFORM-ALTERNATE I (DEC 2022)
SECTION H SPECIAL CONTRACT REQUIREMENTS
H.1 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
H.2 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
H.3 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)
H.4 1352.237-73 FOREIGN NATIONAL VISITOR AND GUEST ACCESS TO DEPARTMENTAL RESOURCES (APR 2010)..21
SECTION I CONTRACT CLAUSES
I.1 52.203-17CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
I.2 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
(JAN 2017)
I.3 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
I.4 52.204-13 System for Award Management Maintenance
I.5 52.204-19INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
I.6 52.209-6 Protecting the Governments Interest When
I.7 52.209-10 Prohibition on Contracting with Inverted
I.8 52.215-8 Order of Precedence- Uniform Contract For
I.9 52.215-21 Requirements for Certified Cost or Prici
I.10 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I.11 52.219-6 Notice of Total Small Business Set-Aside
I.12 52.219-28 Postaward Small Business Program Rerepre
I.13 52.222-3 CONVICT LABOR (JUN 2003)
I.14 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
I.15 52.222-6 Construction Wage Rate Requirements
I.16 52.222-8PAYROLLS AND BASIC RECORDS (JUL 2021)
I.17 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
I.18 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)
I.19 52.222-11 Subcontracts Labor Standards
I.20 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY
2014)
I.21 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
I.22 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)
I.23 52.222-55MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022)
I.24 52.222-36 Equal Opportunity for Workers with Disab
I.25 52.222-50 Combating Trafficking in Persons
PAGE 5 OF 116 1333ND26RNB190034
I.26 52.222-62PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)
I.27 52.223-5POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2024)
I.28 52.222-90 Addressing DEI Discrimination by Federal
I.29 52.223-2 Reporting of Biobased Products Under Serv
I.30 52.223-3 Hazardous Material Identification and Saf
I.31 52.223-11 Ozone-Depleting Substances
I.32 52.223-23 Sustainable Products
I.33 52.225-9 Buy American Construction Materials
I.34 52.226-8ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)
I.35 52.227-1AUTHORIZATION AND CONSENT (JUN 2020)
I.36 52.227-2NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JUN 2020)
I.37 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)
I.38 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
I.39 52.228-11INDIVIDUAL SURETY--PLEDGE OF ASSETS (FEB 2021)
I.40 52.228-12PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (DEC 2022)
I.41 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)
I.42 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
I.43 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
I.44 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.45 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
I.46 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
I.47 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)
I.48 52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023)
I.49 52.233-1 Disputes
I.50 52.233-3 Protest After Award
I.51 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I.52 52.236-2 Differing Site Conditions
I.53 52.236-3 Site Investigation and Conditions Affecti
I.54 52.236-5 Material and Workmanship
I.55 52.236-6 Superintendence by the Contractor
I.56 52.236-7 Permits and Responsibilities
I.57 52.236-8 Other Contracts
I.58 52.236-9 Protection of Existing Vegetation Structu
I.59 52.236-10 Operations and Storage Areas
I.60 52.236-11 Use and Possession Prior to Completion
I.61 52.236-12 Cleaning Up
I.62 52.236-13 Accident Prevention
I.63 52.236-14 Availability and Use of Utility Services
I.64 52.236-17 Layout of Work
I.65 52.236-21 Specifications and Drawings for Construc
I.66 52.243-4 Changes
I.67 52.243-5 Changes and Changed Conditions
I.68 52.244-6 Subcontracts for Commercial Products and
I.69 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
I.70 52.249-1 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT FORM) (APR 1984)--
ALTERNATE I (APR 1984)
I.71 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.72 52.252-6AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
SECTION J LIST OF ATTACHMENTS
J.1 List of Attachments
PAGE 6 OF 116 1333ND26RNB190034
SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K.1 52.209-11 Representation by Corporations Regarding
K.2 52.219-1 Small Business Program Representations
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 52.204-7 System for Award Management Registration
L.2 52.222-5 Construction Wage Rate Requirements Secondary Site of the Work (May 2014)
L.3 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
L.4 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L.5 52.252-5AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
L.6 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)
L.7 1352.233-70 AGENCY PROTESTS (APR 2010)
L.8 1352.242-70 POSTAWARD CONFERENCE (APR 2010)
L.9 1352.270-71 PRE-BID / PRE-PROPOSAL CONFERENCE AND SITE VISIT (APR 2010)
L.10 Instructions to Offerors
SECTION M EVALUATION FACTORS FOR AWARD
M.1 Basis for Award
PAGE 7 OF 116 1333ND26RNB190034
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 SOW - B4 Generator and ATS Replacement
PAGE 8 OF 116 1333ND26RNB190034
1 | P a g e
STATEMENT OF WORK for:
B4 Generator and ATS Replacement
NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY
United States Department of Commerce
325 Broadway
Boulder, CO 80305 May 1, 2026
I. BACKGROUND INFORMATION
This project involves the replacement of aging emergency power infrastructure serving Building 4 at the National Institute of Standards and Technology (NIST) Boulder Campus. The existing standby emergency generator and associated Automatic Transfer Switch (ATS), identified as EMG-003, have reached the end of their service life and no longer fully align with current operational requirements and reliability expectations.
II. PURPOSE
The purpose of this procurement is to remove the existing standby emergency generator and Automatic Transfer Switch (ATS), identified as EMG-003, and to provide and install a new standby emergency generator and ATS for Building 4 at the National Institute of Standards and Technology (NIST) Boulder Campus. All work shall be performed in strict accordance with applicable codes, current industry standards, and the requirements set forth in this Statement of Work (SOW) and as cited for the NIST site within this document.
PLACE OF PERFORMANCE
Work will be performed on the NIST Boulder Campus
Regular Business Hours Regular business hours are Monday through Friday, 0600 to 1900 Mountain Time, excluding Federal holidays and NIST closures.
PERIOD OF PERFORMANCE
All work shall be completed 90 days from issuance of NTP.
III. SPECIFIC REQUIREMENTS
TASKS
• Pre-proposal site visit highly recommended
• Post award construction meeting required
• Contractor shall confirm all locations, conditions, and dimensions in the field, confirm with
COR
• Weekly progress meeting on site once construction commences
PAGE 9 OF 116 1333ND26RNB190034
2 | P a g e
Task 1 – B4 Generator Replacement and ATS Replacement The Contractor shall furnish all labor, materials, tools, equipment, and supervision necessary to remove the existing standby emergency generator and Automatic Transfer Switch (ATS), identified as EMG-003, and to provide and install a new standby emergency generator and ATS for Building 4 at the National Institute of Standards and Technology (NIST) Boulder Campus.
All work shall be performed in strict accordance with applicable codes, current industry standards, and the requirements set forth in this Statement of Work (SOW) and as cited for the NIST site within this document.
1.1 The Contractor shall remove the existing standby emergency generator identified as Onan
Model No. 11-5GNAB-90901A, Serial No. I978649545 (EMG-003). The Government will retain responsibility for final disposition of the removed generator. The Contracting Officer’s Representative (COR) will designate the relocation/staging area following removal.
1.2 The Contractor shall drain and remove the existing starter battery, lubricating oil, and coolant from the generator prior to removal. All removed materials shall be transported and disposed of offsite in accordance with applicable environmental regulations.
1.3 The Contractor shall disconnect and remove existing three-phase building electrical leads from the generator alternator and inspect the conductors for serviceability.
1.4 The Contractor shall provide two (2) generator options for Government selection: one natural gas unit and one diesel unit. Each option shall comply with NIST Site Standards for generators and, at a minimum, the following features: sound attenuated enclosure, cold weather kit, low oil pressure shutdown, low coolant shutdown, battery rack, emergency stop switch, industrial muffler, and sub-base fuel tank (for diesel option). All generator and options shall comply with NIST Site Standards that is provided in this SOW. The Contractor shall submit complete generator specifications and supporting documentation to the COR for review and approval.
1.5 The Contractor shall account for altitude derating and ensure the installed standby emergency generator provides a minimum output of 12 kW, 208V, three-phase, and 40 amps under full load conditions.
1.6 The Contractor shall remove the existing Automatic Transfer Switch (ATS), identified as
Onan Model OT 40, Serial No. J970651234, Specification No. 4979J.
1.7 The Contractor shall furnish and install a new ATS in Room 1402A. The new ATS shall be fully compatible with the installed generator and shall include a corrosion-resistant NEMA 1 aluminum indoor enclosure, status indicator panel, and standard interface board. The ATS shall support not less than 12 kW, 208V, three-phase, and 40 amps under full load conditions. The Contractor shall submit ATS specifications to the COR for approval prior to installation.
PAGE 10 OF 116 1333ND26RNB190034
3 | P a g e
1.8 The Contractor shall furnish and install new start conductors, conduit, and wiring suitable for a three-wire start/stop control system between the generator and ATS. All specifications shall be submitted to the COR for approval.
1.9 The Contractor shall inspect all existing control and power wiring conduits and replace any components deemed unserviceable. Replacement conduit specifications shall be submitted to the COR for approval.
1.10 The Contractor shall install the new standby emergency generator in full compliance with the manufacturer’s instructions and specifications, as well as all applicable NIST Site Standards.
1.11 The Contractor shall install the new ATS in strict accordance with the manufacturer’s instructions and specifications.
1.12 The Contractor shall install new three-phase building electrical connections to the standby emergency generator in accordance with manufacturer requirements, including:
(1) Extension of existing conduit and conductors from the existing ATS (to be demolished) to the new ATS location;
(2) Extension of existing conduit and conductors from Panel EM1 to the new ATS location;
(3) Installation of new conduit and conductors from the new ATS to the new generator;
(4) Compliance of all electrical installations with the current edition of the National Electrical Code (NEC). The Contractor shall provide installation drawings to the COR for final approval.
1.13 The Contractor shall furnish and install all manufacturer-recommended consumables, including oil, air filters, starter battery, and necessary fluids to ensure proper operation.
1.14 The Contractor shall perform all work in compliance with applicable codes and standards, including NFPA, IBC, state and local codes, and the NEC, for installation of a NFPA Level 2 Emergency Power Supply System (EPSS).
1.15 The Contractor shall perform EPSS acceptance testing in the presence of the COR in accordance with NFPA 110 Sections 7.13 and 7.13.4. All testing data shall be documented and submitted to the COR in a formal compliance report.
1.16 The Contractor shall provide complete as-built drawings, operation and maintenance manuals, wiring schematics, and warranty documentation for the generator and ATS upon project completion.
1.17 The Contractor shall procure equipment only from the approved generator manufacturers listed in the attached NIST Site Standards for Generators.
1.18 All new conduit, electrical equipment, and associated components shall comply with NIST
Site Standards for electrical systems. All electrical submittals shall be reviewed and approved by the COR prior to installation.
PAGE 11 OF 116 1333ND26RNB190034
4 | P a g e
Safety on the NIST Campus NIST is committed to maintaining a work environment that safeguards the public and the environment, as well as personnel and property.
If the award requires construction, demolition, excavation, renovation, or other work for which the contractor directs and oversees contractor personnel (including subcontractors) at NIST-owned and operated sites, the contractor shall:
Provide a detailed, site-specific Safety Plan to the contracting officer within 10 days after award that describes how the contractor will maintain a safe work environment and comply with applicable Occupational Safety and Health Administration (OSHA) standards, as well as with applicable state and local laws, standards, and codes.
The Safety Plan shall specify how the company’s policies and practices will comply with each of the applicable standards, laws, and codes.
The contracting officer will provide written comments regarding the plan to the contractor within ten (10) days of receipt and will require the contractor to submit a revised safety plan within ten
(10) days after that to the contracting officer for their review. This cycle may be repeated, if necessary, until the contracting officer determines the safety plan to be acceptable.
Reference:
See NIST’s Contractor Safety Program for required elements of Contractor Safety Plans.
Safety-Related Equipment The Contractor shall:
Provide all safety-related equipment required to perform the work under this award, including personal protective equipment (PPE) and other equipment that is required or appropriate to protect contractor personnel and other personnel on the NIST campus. Contractor-provided personal protective equipment shall include, at a minimum, hard hats, safety shoes, safety glasses (prescription or standard), respiratory protection (powered air purifying respirator or full-face mask respirator), high visibility clothing and gloves that meet applicable OSHA standards for
PPE.
Training The Contractor shall:
Provide safety-related training required by applicable OSHA, state and local regulations or standards to affected contractor personnel (including subcontractor personnel) that perform work
PAGE 12 OF 116 1333ND26RNB190034
5 | P a g e under this award. Such training may include, for example, training for proper use of PPE, respirator use, fall protection, crane operation, forklift operation; electrical safety, or other safety-related topics.
Maintain records of safety training provided to contractor personnel (including subcontractor personnel) that perform work on this award. The contractor shall make those records available to the contracting officer, contracting officer’s representative for the award, or other authorized personnel within 7 days of receipt of their written request, and annually thereafter or upon request.
Require contractor personnel (including subcontractors) to attend required NIST-specific health or safety training that is required by the award.
GENERAL REQUIREMENTS
Installation shall include, but is not limited to the following:
1. Provide all labor, furnish, and install materials, equipment and supplies in accordance with the SOW
2. Delivery Schedule: With initial proposal and prior to commencement of work the contractor must provide detailed project schedule in Microsoft Project to the COR for acceptance. Final schedule shall be agreed upon after NTP at post-award meeting.
3. Provide management and field supervision throughout the project duration.
4. Contractor must be familiar with the work required and local conditions affecting the work.
5. Ensure that the safety of the project is a top priority. Submit a site-specific safety plan with project quotation.
6. Ensure due diligence and timely delivery of the project.
7. Cooperate with NIST Police and Security regarding site security. Contractor is responsible for ensuring its personnel meet all site access requirements. Provide a list of all anticipated employees at least two weeks in advance of their arrival. All employees must fill out specified background check forms for review by NIST Security before security badges will be issued. These forms will be typed.
8. Maintain a record set of all inspections, or other authorizations necessary for the work to proceed.
9. An “Impairment Permit” is required when project work produces: Smoke; Sparks;
Steam; Flames; Fumes; and/or Dust; or other particulates within the buildings when working around fire detection devices. The Contractor must pull a permit through the COR five days in advance of beginning associated work.
10. Notify the COR of the work progress and any required inspections forty-eight (48) hours in advance of all inspections.
11. Upon substantial completion, notify the COR for the performance of a punch list inspection. Submit a written list of items requiring completion or correction accompanied by an anticipated schedule.
PAGE 13 OF 116 1333ND26RNB190034
6 | P a g e
12. Contractor is responsible for determining order of work. Sequential work is envisioned in this SOW but is not required.
13. See COR for any conflicts associated with this SOW.
14. Contractor shall comply with the “General Instructions for Conducting Work at the
NIST Boulder Campus” that is attached in the contract.
Inspection & Acceptance In addition to the inspection and acceptance terms articulated in the specific FAR clause that allows the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
NIST may choose at its discretion to forego this part of acceptance testing.
A visual inspection of the equipment will be performed by the NIST POC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.
Ownership of the equipment shall transfer to NIST upon acceptance by the Government.
The Government will test, inspect, and accept or reject the equipment within 7 days of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.
REQUIREMENTS FOR CONTRACTOR PERSONNEL
Identify all qualifications that the Contractor and/or their personnel working on this contract must possess.
Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.
Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.
PAGE 14 OF 116 1333ND26RNB190034
7 | P a g e
Identification Badges: Contractor employees must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.
V. SCHEDULE OF DELIVERABLES
Deliverable Number Description Format Due Date
Quantity
1 Final Schedule Microsoft Project
10 Days After Project Award
2 Site-Specific Safety Plan
PDF 10 Days After Project Award
3 Generator and Options Specs
PDF 10 Days After Project Award
4 Automatic Transfer Switch Specs
PDF 10 Days After Project Award
5 Perform Generator Based EPSS Acceptance Test
PDF 10 Days After Project Award
6 Manuals/Warranty Information
PDF 10 Days After Project Award
7 Daily JHA PDF 10 Days After Project Award
8 Acceptance Testing Compliance Report
PDF 10 Days After Project Award
9 Conduit Specs PDF 10 Days After Project Award
10 Conductor and Wiring Specs
PDF 10 Days After Project Award
11 Electrical Specs PDF 10 Days After Project Award
Standards of Acceptance: The NIST POC or COR shall review all the above deliverables and respond with an acceptance or request for revision email to the Contractor Point of Contact (POC) within 14 days of receipt of deliverable. This section applies to deliverables which must be reviewed and approved for acceptance (e.g., draft plans, drawings, etc.)
VI. PAYMENT SCHEDULE
The Contractor will be paid, in accordance with the payments clause in the contract and as otherwise noted in this document, upon receipt of a proper invoice.
PAGE 15 OF 116 1333ND26RNB190034
8 | P a g e
1. 100% after installation and acceptance by the POC of fully installed system, AND
2. After the successful completion of the testing requirements set forth in this document under section set forth in this document, AND
3. After successful demonstration by the instrumentation that it performs in accordance with the requirements set forth in this document.
X. ATTACHMENTS:
See Section J, List of Attachments
PAGE 16 OF 116 1333ND26RNB190034
SECTION E
INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(Reference 52.246-12)
E.2 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
(Reference 1352.246-70)
PAGE 17 OF 116 1333ND26RNB190034
SECTION F
DELIVERIES OR PERFORMANCE
F.1 52.242-14 SUSPENSION OF WORK (APR 1984)
(Reference 52.242-14)
PAGE 18 OF 116 1333ND26RNB190034
SECTION G
CONTRACT ADMINISTRATION DATA
G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010) (Reference 1352.201-70)
G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
(Reference 1352.201-72)
G.3 NIST LOCAL-53 CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
All contractors performing work on active contracts at the U.S. Department of Commerce(DOC), National Institute of Standards and Technology (NIST) campuses and/or working in NIST workspaces should go to the www.nist.gov website and under the "About NIST" tab click on "Visit". This site includes information about campus access and security information; identification requirements; parking information and more.
Contractor personnel are required to check the appropriate campus operating status and personnel requirements at https://www.nist.gov/campus-status daily prior to arriving on site. All personnel must adhere to the requirements set forth in the operating status.
Unless otherwise stated in the contract terms and conditions, normal days of business operation are Monday through Friday, excluding Federal Holidays. However, throughout the contract period of performance, there may be circumstances beyond the control of NIST that will impact normal days of business operation such as inclement weather, power outages, etc. In circumstances such as these, the Contractor must call the appropriate NIST campus status line to verify the operating status:
Gaithersburg Campus Operating Status Line:
(301) 975-8000
(800) 437-4385 x8000 (toll free)
Boulder Campus Operating Status Line:
(303) 497-4000
(303) 497-3000 option 2
In the event of a lapse in appropriation, access to Government facilities and resources, including equipment and systems will be limited to excepted personnel for both Federal employees and contractor personnel. If performance of the contract is onsite and/or requires Government interaction, unless the contractor has been, or is notified that it is required to work under an excepted status, the contractor must stop work. The work stoppage shall remain in effect until the lapse is resolved and notification is provided via the NIST website at www.nist.gov (banner on front page) and/or the NIST operating status line(s). Additionally, contractors are encouraged to monitor public broadcasts or the Office of Personnel Management's website at www.opm.gov for the Federal Government operating status.
NIST will provide notification to all contractors that are determined to have excepted status.
All excepted contractors are required to continue performance and communicate with the appointed Contracting Officer's Representative (COR) for further guidance, or NIST Contracting Officer if a COR is not appointed.
Contractors with active supply or service contracts that are fully funded at the time of contract award and do not require access to Government facilities, resources, or active administration by Government personnel in a manner that would not cause the Government to incur additional obligations during the lapse in appropriation may continue performance.
Please note that in all circumstances that impact operations on the NIST campuses, contractors are expected to follow all direction and guidance provided by NIST authorities.
G.4 NIST LOCAL-54 ELECTRONIC BILLING INSTRUCTIONS
NIST requires that Invoice/Voucher submissions are sent electronically via email to INVOICE@NIST.GOV.
Each Invoice or Voucher submitted shall include the following:
(1) Contract number;
(2) Contractor name and address;
(3) Unique entity identifier (see www.sam.gov for the designated entity for establishing unique entity identifiers);
(4) Date of invoice;
(5) Invoice number;
(6) Amount of invoice and cumulative amount invoiced to-date;
PAGE 19 OF 116 1333ND26RNB190034
(7) Contract Line Item Number (CLIN);
(8) Description, quantity, unit of measure, unit price, and extended price of supplies/services delivered;
(9) Prompt payment discount terms, if offered; and
(10) Any other information or documentation required by the contract.
G.5 NIST LOCAL-56 INVOICING PROCESSING PLATFORM-ALTERNATE I (DEC 2022)
Upon written notice from the contracting officer the following supersedes all other instructions for the submission of payment requests. Accordingly, following written notice payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable payment request or invoicing instructions, Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
The Contractor must use the IPP website to register, access, and use IPP for submitting payment requests. If not already enrolled, the Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email within three to five business days of the addition of the contract award to IPP. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email: IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting payment requests, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation. Contact the contracting officer for more information on submitting a waiver request.
PAGE 20 OF 116 1333ND26RNB190034
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
(Reference 1352.209-73)
H.2 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
(Reference 1352.209-74)
H.3 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)
(Reference 1352.237-71)
H.4 1352.237-73 FOREIGN NATIONAL VISITOR AND GUEST ACCESS TO DEPARTMENTAL RESOURCES (APR 2010) (Reference 1352.237-73)
PAGE 21 OF 116 1333ND26RNB190034
SECTION I
CONTRACT CLAUSES
I.1 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
(Reference 52.203-17)
I.2 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
(JAN 2017)
(Reference 52.203-19)
I.3 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
(Reference 52.204-9)
PAGE 22 OF 116 1333ND26RNB190034
I.4 52.204-13 System for Award Management Maintenance
PAGE 23 OF 116 1333ND26RNB190034
52.204-13 System for Award Management—Maintenance.
As prescribed in 4.208(b)(2), use the following clause:
System for Award Management—Maintenance (DEVIATION January 2026)
(a) Definitions. As used in this clause—
Commercial and Government Entity code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location (referred to as “CAGE code”); or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency to entities located outside the United States and its outlying areas that the DLA CAGE Branch records and maintains in the CAGE master file (referred to as “NCAGE code”).
Unique Entity Identifier (UEI) means an identifier used to identify a specific commercial, nonprofit, or Government entity.
(b) Active registration.
(1) The Contractor shall maintain an active Federal Government contracts registration in the System for Award Management (SAM) at during contract performance and through final payment under this contract. To maintain an active registration in SAM, the Contractor shall review at least annually its registration in SAM and validate that the information is current, accurate, and complete.
(2) The Contractor is responsible for the currency, accuracy, and completeness of the information provided within SAM, and for any liability resulting from the Government’s reliance on inaccurate or incomplete information. Updating SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(c) Novation and change-of-name agreements.
(1) If the Contractor has legally changed its business name or “doing business as” name (whichever is shown on the contract), or has transferred the assets used to perform the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in part 42 of the Federal Acquisition Regulation (FAR), the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to —
(i) Change the legal business name in SAM;
PAGE 24 OF 116 1333ND26RNB190034
(ii) Comply with the requirements of FAR part 42; and
(iii) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with its written notification sufficient documentation to support the legally changed name.
(2) If the Contractor fails to comply with the requirements of paragraph (c)(1) of this clause, or fails to perform the agreement at paragraph (c)(1)(iii) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(d) Assignees.
(1) The Contractor shall not change the legal business name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR part 32). Assignees shall be separately registered in SAM.
(2) Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be incorrect information within the meaning of the “Suspension of Payment” paragraph of the EFT clause of this contract.
(e) Unique entity identifier (UEI). The Contractor shall ensure that its UEI is maintained throughout the life of the contract.
(f) Commercial and Government Entity (CAGE) code. The Contractor shall ensure that the CAGE code is maintained throughout the life of the contract. To update a CAGE code, the Contractor shall initiate the change by updating its SAM registration.
(g) Communicating changes. The Contractor shall communicate any change to its UEI or CAGE code to the Contracting Officer within 30 days after the change, so a modification can be issued to update the UEI or CAGE code on this contract. A change in the UEI does not necessarily require a novation.
(End of clause)
Alternate I (DEVIATION January 2026). As prescribed in 4.208(b)(2), replace paragraph (b) of the basic clause with the following paragraph (b):
(b) Active registration.
(1) If the Contractor was unable to register for Federal Government contracts in the System for Award Management (SAM) at before award, the Contractor shall register in SAM within
PAGE 25 OF 116 1333ND26RNB190034
30 days after contract award or at least three days before submitting the first invoice, whichever occurs first.
(2) The Contractor shall maintain an active Federal Government contracts registration in SAM during contract performance and through final payment under this contract. To maintain an active registration in SAM, the Contractor shall review at least annually its registration in SAM and validate that the information is current, accurate, and complete.
(3) The Contractor is responsible for the currency, accuracy, and completeness of the information provided within SAM, and for any liability resulting from the Government’s reliance on inaccurate or incomplete information. Updating SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
I.5 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) (Reference 52.204-19)
PAGE 26 OF 116 1333ND26RNB190034
I.6 52.209-6 Protecting the Governments Interest When
PAGE 27 OF 116 1333ND26RNB190034
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.
As prescribed in 9.409 , insert the following clause:
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (DEVIATION January 2026)
(a) Definition. As used in this clause—
Commercially available off-the-shelf (COTS) item
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” in Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in , such as agricultural products and petroleum products.
(b) The Government suspends or debars Contractors to protect the Government's interests.
Other than a subcontract for a commercially available off-the-shelf item, the Contractor shall not enter into any subcontract, in excess of the threshold specified in FAR 9.405-2(b) on the date of subcontract award, with a Contractor that is debarred, suspended, or proposed for debarment by any executive agency unless a compelling reason exists to do so.
(c) The Contractor shall require each proposed subcontractor whose subcontract will exceed the threshold specified in FAR 9.405-2(b) on the date of subcontract award, other than a subcontractor providing a commercially available off-the-shelf item, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, is or is not debarred, suspended, proposed for debarment, or voluntarily excluded by the Federal Government.
(d) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercially available off-the-shelf item) that is debarred, suspended, proposed for debarment, or voluntarily excluded (see FAR 9.404 for information on the System for Award Management (SAM) Exclusions). The notice must include the following:
(1) The name of the subcontractor.
(2) The Contractor’s knowledge of the reasons for the subcontractor being listed with an exclusion in SAM.
PAGE 28 OF 116 1333ND26RNB190034
(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its being listed with an exclusion in SAM.
(4) The systems and procedures the Contractor has established to ensure that it is fully protecting the Government's interests when dealing with such subcontractor in view of the specific basis for the party's debarment, suspension, proposed debarment, or voluntary exclusion.
(e) Subcontracts. Unless this is a contract for the acquisition of commercial products or commercial services, the Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for the identification of the parties), in each subcontract that—
(1) Exceeds the threshold specified in FAR 9.405-2(b) on the date of subcontract award; and
(2) Is not a subcontract for commercially available off-the-shelf items.
(End of clause)
I.7 52.209-10 Prohibition on Contracting with Inverted
PAGE 29 OF 116 1333ND26RNB190034
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
As prescribed in 9.108-6(b), insert the following clause:
Prohibition on Contracting with Inverted Domestic Corporations (DEVIATION January 2026)
(a) Definitions. As used in this clause-
Inverted domestic corporation means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
Subsidiary means an entity in which more than 50 percent of the entity is owned—
(1) Directly by a parent corporation; or
(2) Through another subsidiary of a parent corporation.
(b) If the contractor reorganizes as an inverted domestic corporation or becomes a subsidiary of an inverted domestic corporation at any time during the period of performance of this contract, applicable law may prohibit the Government from paying for Contractor activities performed after the date when it becomes an inverted domestic corporation or subsidiary. The Government may seek any available remedies in the event the Contractor fails to perform in accordance with the terms and conditions of the contract as a result of Government action under this clause.
(c) Exceptions to this prohibition are located at 9.108-3.
(d) In the event the Contractor becomes either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation during contract performance, the Contractor shall give written notice to the Contracting Officer within five business days from the date of the inversion event.
I.8 52.215-8 Order of Precedence- Uniform Contract For
PAGE 30 OF 116 1333ND26RNB190034
52.215-8 Order of Precedence-Uniform Contract Format.
As prescribed in 15.110(h), insert the following clause:
Order of Precedence-uniform Contract Format (DEVIATION January 2026)
Any inconsistency in this request for proposal or contract shall be resolved by giving precedence in the following order:
(a) The Schedule (excluding the specifications).
(b) Representations and other instructions.
(c) Contract clauses.
(d) Other documents, exhibits, and attachments.
(e) The specifications.
I.9 52.215-21 Requirements for Certified Cost or Prici
PAGE 31 OF 116 1333ND26RNB190034
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications.
As prescribed in 15.110(u), insert the following clause:
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (DEVIATION January 2026)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth in Federal Acquisition Regulation (FAR) 15.403-3(a) on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-3(a) is adjusted for inflation as set forth in FAR part 1, the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable—
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial products or commercial services.
(A) If—
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial product or commercial service; and
(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial product or commercial service, to a contract or subcontract for the acquisition of other than a commercial product or commercial service.
(B) For a commercial product and commercial service exception, the Contractor shall provide, at a minimum, information on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .