HAST - SOW revision.pdf
PDF 207 KB Posted
- Solicitation number
- 1333ND26QNB030157
About this file
This document is an email chain regarding revisions to a Statement of Work (SOW) for NIST Solicitation 1333ND26QNB030157 concerning the procurement of a HAST (Highly Accelerated Stress Test) chamber.
Dr. Ashlee Aiello from NIST provided a revised SOW on April 10, 2026, addressing supplier concerns about conflicting requirements in the original specification. Key technical modifications include: updating the chamber internal dimensions to 11.5" x 11.5" to accommodate test samples while meeting pressure specifications, and clarifying electrical connection requirements to specify available connections rather than mandate 300-400 wires. The original SOW contained conflicting specifications—the maximum testing pressure of 0.392 MPa or higher limited available models (EHS 412M or 432M), but the EHS-412M model was too small to accommodate 300mm wafers, and the EHS-432M lacked a built-in water tank. Additionally, the referenced 21-liter chamber size had a test area diameter less than 300mm, making it incompatible with required test samples. The revised SOW clarifies that vendors should specify the number of electrical connections available and provide preference for higher connection counts using standard electrical panel options rather than custom configurations. Contract Specialist Forest T. Crumpler requested that all changes in the revised SOW be clearly highlighted for vendor clarity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
From: Aiello, Ashlee R. Dr. (Fed) To: Crumpler, Forest T. (Fed) Subject: RE: [EXTERNAL] RE: Courtesy Notification - NIST Solicitation 1333ND26QNB030157 Date: Friday, April 10, 2026 4:17:37 PM Attachments: Statement of Work (SOW)-HASTchamber_260410.docx
Hi Forest, Please see the revised SOW. I confirmed that the samples will fit this updated size. I revised the language surrounding the wires in an attempt to clarify for vendors. Please review and let me know if this looks okay.
Best, Ashlee
From: Crumpler, Forest T. (Fed) <forest.crumpler@nist.gov> Sent: Friday, April 10, 2026 1:54 PM To: Aiello, Ashlee R. Dr. (Fed) <ashlee.aiello@nist.gov> Subject: RE: [EXTERNAL] RE: Courtesy Notification - NIST Solicitation 1333ND26QNB030157
Ashlee, This is for the solicitation. When you get the revised SOW, please make sure that the changes are highlighted in some way.
Forest T Crumpler Contract Specialist Department of Commerce National Institute of Standards and Technology (NIST) Office of Acquisition and Agreements Management (OAAM) Acquisition Management Division 100 Bureau Drive Gaithersburg, MD 20899 Forest.Crumpler@nist.gov
From: Aiello, Ashlee R. Dr. (Fed) <ashlee.aiello@nist.gov> Sent: Friday, April 10, 2026 1:36 PM To: Crumpler, Forest T. (Fed) <forest.crumpler@nist.gov> Subject: RE: [EXTERNAL] RE: Courtesy Notification - NIST Solicitation 1333ND26QNB030157 mailto:ashlee.aiello@nist.gov mailto:forest.crumpler@nist.gov mailto:Forest.Crumpler@nist.gov https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fforms.office.com%2FPages%2FResponsePage.aspx%3Fid%3Dwz7PRAyEhkC33uO8mmwttNP7xPqkFKZPuGgf8Ya3KeJUQlEwWERDMVM2NzRXWTVCVUU3NTYyWjJUOS4u&data=05%7C02%7Cforest.crumpler%40nist.gov%7Cc08947a37b8b463b83b108de973e2ac1%7C2ab5d82fd8fa4797a93e054655c61dec%7C0%7C0%7C639114490571858011%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=2jkd7Ti1vTqkOjN1QdHKS8Lt8tl4D35%2Fk0P9vnTT9L8%3D&reserved=0 mailto:ashlee.aiello@nist.gov mailto:forest.crumpler@nist.gov
STATEMENT OF WORK
Title: Highly Accelerated Stress Test Chamber
Lab: EL, 731.07
I. BACKGROUND INFORMATION
The National Institute of Standards and Technology (NIST) Infrastructure and Materials Group within the Engineering Laboratory is seeking a Highly Accelerated Stress Test (HAST) Chamber capable of meeting the JESD22A11E standard to perform accelerated aging experiments as part of a study of long-term reliability of materials used in advanced packaging of semiconductor chips. This work is in support of the CHIPS Metrology program.
The CHIPS Metrology program develops and advances cutting edge metrology capabilities for members of the US semiconductor manufacturing ecosystem. This NIST conducted research program works with device manufacturers, tool vendors, materials suppliers, and other organizations to address critical metrology gaps to spur innovation within seven grand challenge areas. For more information on CHIPS Metrology, please visit https://www.nist.gov/chips/research-development-programs/metrology-program.
II. PURPOSE
The Infrastructure and Materials Group requires the acquisition of a highly accelerated stress test (HAST) chamber. This HAST chamber is essential to our CHIPS project focused on reliability of advanced packaging in heterogeneously integrated semiconductor devices. This capability directly supports the CHIPS R&D Metrology Program’s Grand Challenge to enable metrology for long-term aging studies of integrating components in advanced packaging. By providing the semiconductor industry with an accurate material property database of polymeric packaging components throughout long-term aging and a new, more accurate reliability model, long-term reliability design efficiency (both time and cost savings) will be greatly improved.
This HAST chamber will allow for accelerated aging at variable temperature, humidity, and pressure to study the effect of thermal environment, including direct in-situ temperature and resistance monitoring throughout samples, of polymeric components (e.g., underfills, redistribution layers, and thermal interface materials) used in advanced packaging of heterogeneously integrated semiconductors. This is a critical requirement to study the impact of different long-term aging environment (e.g. the impact of different thermal history) experienced by real-world semiconductor devices. This will allow for material properties to be measured throughout the aging process. The measured material properties will be provided as part of an open-source database and will also be used as inputs for developing a new reliability model, both of which will be provided to industry stakeholders.
III. MINIMUM REQUIREMENTS
The Contractor shall provide a system that meets all technical specifications identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental or prototype items will not be considered. The use of “gray market” components are not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
Line Item 0001:
Description: HAST Chamber
Quantity: 1
A. Technical Specifications
a. Size
i. Must accommodate multiple samples up to 280 mm in diameter.
ii. Must have a minimum of two shelves (not including bottom shelf).
iii. Minimum of 21 L interior volume.
b. Accelerated Stress Testing
i. Temperature
1. Minimum temperature of 105 °C or lower.
2. Maximum temperature of 142 °C or higher.
ii. Pressure
1. Minimum testing pressure of 0.020 MPa or lower.
2. Maximum testing pressure of 0.392 MPa or higher.
iii. Humidity
1. Minimum relative humidity of 75% RH or lower.
2. Maximum relative humidity of 100% RH.
c. Must have built in water supply tank. Size must be provided.
d. Must comply with JESD22A11E standard testing.
e. Power requirements, required receptacle, and plug (if required) must be provided.
Option Line Item 0002:
Description: Terminal Bias Panel (Option can be exercised at time of award)
Quantity: 1
A. Technical Specifications
a. Side connection panel to accommodate wires for in-situ monitoring (data acquisition) and low-current bias application.
i. Connection panel must be located on oven side (not the rear) to provide wire access.
ii. The monitored test vehicles will have 300-400 resistance-based wired connections. Ideally the connection panel will be able to accommodate all 300-400 wires (for resistance-based measurements). Fewer connections will still be considered, although preference will be given to instruments that can accommodate a higher number of connections. If a custom solution is provided, also include a quote for standard options (i.e., standard electrical panel option with fewer connections or no electrical panel if electrical panels are not available as part of the standard options).
iii. Provide current and bias limits to allow for in-situ bias application during testing.
IV. SCHEDULE OF DELIVERABLES
Deliverable Number
Description
Quantity
Due Date
Place of Delivery
HAST Chamber
No later than 27 weeks after receipt of order.
NIST (Gaithersburg)
Terminal Bias Panel, if option exercised
No later than 27 weeks after receipt of order.
NIST (Gaithersburg)
PLACE OF PERFORMANCE
Onsite at NIST Gaithersburg, Building 226.
Regular Business Hours
Regular business hours are Monday through Friday, 8:30 am to 5:00 pm Eastern Time, excluding Federal holidays and NIST closures.
PERIOD OF PERFORMANCE
8 months from the date of award for instrument delivery to include training. This does not include warranty.
V. DELIVERY TERMS
Delivery shall be F.O.B Destination (or equivalent incoterms, such as DDP) and shall occur in accordance with the delivery due dates provided in the above table.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery.
The contractor shall deliver all Line Items to:
National Institute of Standards and Technology
Shipping and Receiving
100 Bureau Drive, Building 301
C/O/ Ashlee Aiello/226
VI. INSTALLATION
The system shall be installed by the Contractor and meet contract specifications no later than three weeks after delivery to install. Installation, at a minimum, shall include uncrating/unpackaging of all equipment, rigging, set-up and hook-up of the system, demonstration of all specifications, and removal of trash. Onsite installation and demonstration shall be done at NIST, Gaithersburg, MD- Building 226. All installation requirements are identified below:
System start up, operation verification, overview of controls and safety features. Site preparation including electrical receptacle will be handled by NIST prior to installation.
VII. TRAINING
The contractor shall conduct an onsite training session for up to five users at NIST. The training shall provide a thorough demonstration of all system/solution functions, maintenance, data administration, and basic troubleshooting. The training may be completed at NIST Monday – Friday during the operating hours of 8:30 am to 5:00 pm immediately after installation and demonstration of specifications and must be completed no later than 14 days after installation.
VIII. INSPECTION & ACCEPTANCE
In addition to the inspection and acceptance terms articulated in the specific FAR clause that allows the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
NIST may choose at its discretion to forego this part of acceptance testing.
A visual inspection of the equipment will be performed by the NIST Contracting Officer’s Representative (COR) or Technical Point of Contact (TPOC) to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.
Ownership of the equipment shall transfer to NIST upon acceptance by the Government.
The Government will test, inspect, and accept or reject the equipment within 10 days of the completed installation of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.
IX. WARRANTY
The contractor shall warranty the entire system for a period of a minimum of 12 months after acceptance of the equipment and shall be in accordance with terms in FAR 52.212-4. Warranty shall commence upon acceptance of the system by the Government and at a minimum shall include the following:
Replacement parts, on-site labor
X. PAYMENT SCHEDULE
The Contractor will be paid, in accordance with the payments clause in the contract and as otherwise noted in this document, upon receipt of a proper invoice.
1. 100% after installation and acceptance by the COR of fully installed system
NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer. Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration.
XI. CYBERSECURITY PRIVACY REQUIREMENTS
NIST seeks a solution that provides security and privacy protection consistent with requirements defined by applicable federal laws, regulations, policies, and standards (e.g., the Federal Information Security Management Act (FISMA), OMB Circular A-130, and FIPS Publication 200). The solution provider (including subcontractors) may meet these requirements through various means, including but not limited to FedRAMP authorization, current third-party assessments (e.g., SSAE, PCI), and/or responses to NIST special publication control set SP 800-171.
Minimally Acceptable Controls
· System security plan describing physical, technical, and administrative controls implemented to protect systems and sensitive personally identifiable information (SPII).
· IT management processes to establish and manage secure configuration baselines including routine patching for all operating systems and applications.
· Access to SPII is restricted to those with a need to know. Personnel with access to SPII have background investigations performed (e.g. criminal, financial etc.), and are trained on secure handling of SPII.
· Access Controls for SPII meet or exceed industry best practices for access and identification control including, but not limited to, connectivity to servers and databases, multi-factor authentication for remote accesses for administration, secure configurations for any devices accessing the system, and strong physical security for any place where the data is accessed.
· The solution supports multifactor authentication for users and/or supports integration with customer federation services for Single-Sign capability.
· Processes for scanning on a continual basis for vulnerabilities and proper configurations for all aspects of the system, as well as processes for timely mitigation of findings.
· Auditing and Incident Response processes including customer notification of suspected or actual incidents and logging with sufficient information to perform forensics on any incident. Processes for notifying and providing appropriate mitigations, including but not limited to credit monitoring services, for subsidy applicants in the event of suspected or actual incidents.
· SPII is encrypted in transit using TLS 1.2 or better and encrypted at rest in all places the SPII is stored. All encryption algorithms and modules are FIPS 140-2/140-3 validated.
If unable to meet any of the requirements listed above, the solution provider may provide details of mitigations or alternative protections in place to ensure the appropriate handling and protection of SPII.
If the solution provider provides services to other Federal agencies, provide a general description of the security risk management approach and client point of contact.
XII. REQUIREMENTS FOR CONTRACTOR PERSONNEL
Identify all qualifications that the Contractor and/or their personnel working on this contract must possess.
Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.
Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.
Identification Badges: Contractor employees must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.
Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass must be displayed on the vehicle in accordance with NIST Security Office instructions.
Media Inquiries: The Contractor shall not respond to any media inquiries. Any inquiries from the media shall be immediately relayed to the NIST COR and/or Contracting Officer (CO). There shall be no interviews, comments, or any other response without the knowledge and approval of the NIST COR or Designated Government Official.
2 | Page image1.jpeg
Hi Forest, Is this the Sources Sought or the solicitation?
I wrote this before our test vehicle design was awarded and went larger to be conservative. I am confirming with our test vehicle design team now to see if 11.5” x 11.5” will be large enough.
Regarding the 300-400 wires, we don’t require 300 connections. We only ask that they specify how many connections are available and offer preference to a higher number of connections. I do not want an expensive customized option, just what is available. Some sort of electrical panel is a standard option for these types of chambers.
I’ll provide a modified SOW as soon as I get an answer from our test vehicle team.
Thanks, Ashlee
From: Crumpler, Forest T. (Fed) <forest.crumpler@nist.gov> Sent: Thursday, April 9, 2026 10:42 AM To: Aiello, Ashlee R. Dr. (Fed) <ashlee.aiello@nist.gov> Subject: FW: [EXTERNAL] RE: Courtesy Notification - NIST Solicitation 1333ND26QNB030157
Ashlee, We have a question from one of the suppliers for the HAST chamber. See below and let me know the answer. They seem to think there are discrepancies in the SOW, so I have included that as well.
Ok let me step back.
The SOW on SAM.gov is not something we can offer.
We need NIST to respond to the following points:
1. We don’t have one unit that meets all of the requirements.
1. The pressure spec Maximum testing pressure: 0.392 MPa or higher limits us to the EHS 412M or 432M models
2. However the EHS-412M model is too small to hold a 300mm wafer
3. The EHS-432M does not have a built in water tank mailto:forest.crumpler@nist.gov mailto:ashlee.aiello@nist.gov
2. We do not have a system that could attach 300 – 400 wires. We could use large ports but they would need to supply the custom port plugs that would have the proper number of conductors etc.
3. The reference to 21 liters is our 212 and 412 size chamber but the diameter of the test area is less than 300 mm so the test samples will not fit.
Forest T Crumpler Contract Specialist Department of Commerce National Institute of Standards and Technology (NIST) Office of Acquisition and Agreements Management (OAAM) Acquisition Management Division 100 Bureau Drive
Forest.Crumpler@nist.gov mailto:Forest.Crumpler@nist.gov https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fforms.office.com%2FPages%2FResponsePage.aspx%3Fid%3Dwz7PRAyEhkC33uO8mmwttNP7xPqkFKZPuGgf8Ya3KeJUQlEwWERDMVM2NzRXWTVCVUU3NTYyWjJUOS4u&data=05%7C02%7Cforest.crumpler%40nist.gov%7Cc08947a37b8b463b83b108de973e2ac1%7C2ab5d82fd8fa4797a93e054655c61dec%7C0%7C0%7C639114490571886956%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=bcMcCeNBaJAqndduV5GyJTq21SOxpElI2HPbiSCJ9no%3D&reserved=0