Attachment 1 - Statement of Work Revised 3-24-26.docx

DOCX document 47 KB Posted

Attached to
Fabry Perot Open Resonators (FPOR) and Microwave Components
Solicitation number
1333ND26QNB030032
Issued by

About this file

This is a Statement of Work (SOW) for the procurement of Fabry Perot Open Resonators (FPOR) and microwave components by the National Institute of Standards and Technology (NIST) Guided Wave Electromagnetics Group in Boulder, Colorado. NIST requires six line items: one D-band waveguide Fabry Perot resonator (110–170 GHz in WR6.5 waveguide ports), one G-band waveguide Fabry Perot resonator (140–220 GHz in WR5 ports), one J-band waveguide Fabry Perot resonator (220–330 GHz in WR3.4 ports), one coaxial Fabry Perot resonator (10–130 GHz with 1–15 dielectric constant capability and 50–150 mm sample diameter), two two-channel precision Source Measure Units (SMUs) with 10 femtoampere resolution and 210 V/3 A DC specifications, and three single-channel precision SMUs with 1 picoampere resolution and 21 V/1.5 A specifications. All equipment must be new, not used or remanufactured, and must include original manufacturer packaging, documentation, and software. Each line item has a delivery requirement of 16 weeks after receipt of order to NIST Boulder at 325 Broadway, Boulder, Colorado 80305, with F.O.B. Destination terms.

The contractor must provide a one-year warranty commencing upon government acceptance of the equipment and including full warranty and return-to-manufacturer coverage. Payment is structured at 100 percent upon installation and acceptance by the NIST Technical Point of Contact and Contracting Officer's Representative following successful completion of testing demonstrating conformance to manufacturer specifications and government requirements. NIST reserves the right to conduct performance testing, including measuring fused silica coupons with the Fabry Perot equipment and performing visual inspections for transport damage. The government will accept or reject equipment within 30 days of receipt, with the contractor responsible for latent defects discovered after final inspection on a prorated basis over the equipment's useful life. The contractor must also comply with NIST cybersecurity and privacy requirements consistent with FISMA, OMB Circular A-130, and NIST Special Publication 800-171, including system security planning, access controls, multi-factor authentication, vulnerability scanning, incident response procedures, and FIPS 140-2/140-3 validated encryption.

View the file

Other files

File Type Posted
Attachment 1 - Statement of Work Revised 4-8-26.docx DOCX document
Attachment 1 - Statement of Work Revised 4-7-26.docx DOCX document
Solicitation QandAs 3-26-26.docx DOCX document
Solicitation QandAs 3-24-26.docx DOCX document
Solicitation 1333ND26QNB030032 FPOR.docx DOCX document
Attachment 2 - Applicable Provisions and Clauses.docx DOCX document
Attachment 1 - Statement of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Title: Fabry Perot resonators and microwave components

BACKGROUND INFORMATION

The National Institute of Standards and Technology (NIST) Guided Wave Electromagnetics Group within the RF Technology Division of the Communications Technology Laboratory requires D-band waveguide Fabry Perot, G-band Fabry Perot, J-band Fabry Perot, Coaxial Fabry Perot, two (2) two channel precision SMU, and three (3) single channel. All equipment must include a 1-year warranty with maintenance. The Fabry Perot resonators will be used for complex permittivity measurements to 330 GHz. The objective of the requirement is to enable traceable complex permittivity to 330 GHz and provide known permittivity measurements for on-wafer traceability for S-parameters, Power, and Phase. This requirement supports the NIST CHIPS program to develop and disseminate NIST best practices and algorithms for complex permittivity and on-wafer measurement.

PURPOSE

The required work provides the necessary permittivity measurement equipment to develop a traceability path for complex permittivity from 20 GHz to 330 GHz. The objective is to deliver D-band waveguide Fabry Perot, G-band Fabry Perot, J-band Fabry Perot, Coaxial Fabry Perot, two (2) two channel precision SMU, three (3) single channel.

MINIMUM REQUIREMENTS

The Contractor shall provide a system that meets all technical specifications identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered. The use of “gray market” components are not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.

Line Item 0001:

Description: D-band Waveguide Fabry Perot Resonator Quantity: 1 A. Technical Specifications

a. FPOR resonator D-band (110 GHz - 170 GHz) in WR6.5 waveguide ports with tables and clamps

b. FPOR software

Line Item 0002:

Description: G-band Waveguide Fabry Perot Resonator Quantity: 1 A. Technical Specifications

a. FPOR resonator G-band (140 GHz - 220 GHz) in WR5 waveguide ports with tables and clamps

b. FPOR software

Line Item 0003:

Description: J-band Waveguide Fabry Perot Resonator Quantity: 1 B. Technical Specifications

a. FPOR resonator J-band (220 GHz - 330 GHz) in WR3.4 waveguide ports with tables and clamps

b. FPOR software

Line Item 0004:

Description: Coaxial Fabry Perot Resonators Quantity: 1 A. Technical Specifications

a. 10 GHz - 130 GHz

b. Coaxial ports: 1 (mm (f)

c. Dielectric constant: 1 – 15

d. Loss tangent: >

e. Sample thickness: 1 µm – 3 mm

f. Sample diameter: 50 mm – 150 mm

g. FPOR software

Line Item 0005:

Description: Two channel precision SMU Quantity: 2 A. Technical Specifications

a. Two channels

b. 10 fA resolution

c. 210 V

d. 3A DC

e. 10.5A Pulse Line Item 0006:

Description: Single channel precision SMU Quantity: 3 A. Technical Specifications

a. One channel

b. 1 pA resolution

c. 21 V

d. 1.5 A

SCHEDULE OF DELIVERABLES

Deliverable Number
Description
Quantity
Due Date
Place of Delivery
0001
D-band Waveguide Fabry Perot Resonator
1
16 weeks after receipt of order (ARO)
NIST Boulder
0002
G-band Waveguide Fabry Perot Resonator
1
16 weeks ARO
NIST Boulder
0003
J-band Waveguide Fabry Perot Resonator
1
16 weeks ARO
NIST Boulder
0004
Coaxial Fabry Perot Resonators
1
16 weeks ARO
NIST Boulder
0005
Two channel precision SMU
2
16 weeks ARO
NIST Boulder
0006
One channel precision SMU
3
16 weeks ARO
NIST Boulder

Standards of Acceptance: The NIST Technical Point of Contact (TPOC) and Contracting Officer’s Representative (COR) shall review all the above deliverables and respond with an acceptance or request for revision email to the Contractor Point of Contact (POC) within 30 days.

DELIVERY TERMS

Delivery shall be F.O.B Destination (or equivalent incoterms, such as DDP) and shall occur in accordance with the delivery due dates provided in the above table.

FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery.

The contractor shall deliver all Line Items to:

National Institute of Standards and Technology Shipping and Receiving 325 Broadway Boulder, Colorado 80305 ATTN: Nathan Orloff

INSPECTION & ACCEPTANCE

In addition to the inspection and acceptance terms articulated in the specific FAR clause that allows the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.

Performance Tests:

1. Measure fused silica coupons for Fabry Perot

NIST may choose at its discretion to forego this part of acceptance testing.

A visual inspection of the equipment will be performed by the NIST TPOC and COR to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.

Ownership of the equipment shall transfer to NIST upon acceptance by the Government.

The Government will test, inspect, and accept or reject the equipment within 30 days of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.

I. WARRANTY

The contractor shall warranty the entire system for a period of a minimum of 1 years after acceptance of the equipment and shall be in accordance with terms in RFO 52.212-4. Warranty shall commence upon acceptance of the system by the Government and at a minimum shall include the following:

· First year full warranty and return to manufacturer

PAYMENT SCHEDULE

The Contractor will be paid, in accordance with the payments clause in the contract and as otherwise noted in this document, upon receipt of a proper invoice.

1. 100% after installation and acceptance by the TPOC of fully installed system, AND

2. After the successful completion of the testing requirements set forth in this document, AND

3. After successful demonstration by the instrumentation that it performs in accordance with the requirements set forth in this document.

CYBERSECURITY PRIVACY REQUIREMENTS

NIST seeks a solution that provides security and privacy protection consistent with requirements defined by applicable federal laws, regulations, policies, and standards (e.g., the Federal Information Security Management Act (FISMA), OMB Circular A-130, and FIPS Publication 200). The solution provider (including subcontractors) may meet these requirements through various means, including but not limited to FedRAMP authorization, current third-party assessments (e.g., SSAE, PCI), and/or responses to NIST special publication control set SP 800-171.

Minimally Acceptable Controls

· System security plan describing physical, technical, and administrative controls implemented to protect systems and sensitive personally identifiable information (SPII).

· IT management processes to establish and manage secure configuration baselines including routine patching for all operating systems and applications.

· Access to SPII is restricted to those with a need to know. Personnel with access to SPII have background investigations performed (e.g. criminal, financial etc.), and are trained on secure handling of SPII.

· Access Controls for SPII meet or exceed industry best practices for access and identification control including, but not limited to, connectivity to servers and databases, multi-factor authentication for remote accesses for administration, secure configurations for any devices accessing the system, and strong physical security for any place where the data is accessed.

· The solution supports multifactor authentication for users and/or supports integration with customer federation services for Single-Sign capability.

· Processes for scanning on a continual basis for vulnerabilities and proper configurations for all aspects of the system, as well as processes for timely mitigation of findings.

· Auditing and Incident Response processes including customer notification of suspected or actual incidents and logging with sufficient information to perform forensics on any incident. Processes for notifying and providing appropriate mitigations, including but not limited to credit monitoring services, for subsidy applicants in the event of suspected or actual incidents.

· SPII is encrypted in transit using TLS 1.2 or better and encrypted at rest in all places the SPII is stored. All encryption algorithms and modules are FIPS 140-2/140-3 validated.

If unable to meet any of the requirements listed above, the solution provider may provide details of mitigations or alternative protections in place to ensure the appropriate handling and protection of SPII.

If the solution provider provides services to other Federal agencies, provide a general description of the security risk management approach and client point of contact.

File details come from the government source that posted it. Updated .