Att 02 BLANK BID FORM.xlsx
XLSX spreadsheet 351 KB Posted
- Attached to
- Lightning Protection Repairs at CUP Federal contract opportunity
- Solicitation number
- 1333ND25RNB190029
About this file
This file is a blank bid form (Excel spreadsheet) for a construction project at the National Institute of Standards & Technology (NIST) in Boulder, Colorado, dated 23-Jun-25. The template is designed by Jim Daley and includes 16 construction divisions ranging from General Requirements to Electrical, with each division having detailed cost breakdown sections for labor, material, equipment, and engineering. The spreadsheet appears to be a comprehensive budgeting and estimation tool with built-in error checking features, contingency calculations, and percentage tracking mechanisms.
The template is structured to allow precise cost allocation across various project components, with columns for quantity, unit of measurement, base costs, labor rates, and total costs. Notable features include percentage-based calculations for contractor overhead, profit, supervisor costs, equipment, freight, taxes, and contingencies. However, in this blank template, all cost fields are set to zero, indicating it is a preparatory document awaiting specific project cost inputs. The spreadsheet includes macros for locking/unlocking headings and appears designed for detailed financial planning and cost estimation in construction projects.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1333ND25RNB190029 AMD 0002 QA.pdf | ||
| 1333ND25RNB190029 AMD 0001 Revise Section L Lightning Protection NIST Boulder CO.pdf | ||
| 1333ND25RNB190029 Lightning Protection Repairs CUP NIST Boulder CO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Attachment 05 |
| 10/12/00 |
jdaley: This template design by Jim Daley this is the last revision date of the template
| Col. C is hidden | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |
| 0 | Check= | $0 |
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | REMARKS: | Page: | 1 OF 1 | |||||||||||||||||
| Proj: | Date: | 23-Jun-25 | |||||||||||||||||||
| Pkg: | Summary | P.O. #: | |||||||||||||||||||
| Rev: | Owner: | Estimator: | |||||||||||||||||||
| Type: | Budget Check Estimate | ||||||||||||||||||||
| LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of | ||||||||||||||||
| DIV # | DESCRIPTION | SCMMR | % | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | Total | Contingency | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | in Work Pkg | |||||||||
| 1 | General Requirements | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ||||||||||||
| 2 | Site Work | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 3 | Concrete | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 4 | Masonry | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | $0 | ERROR:#DIV/0! | |||||||||||||||||||
| 5 | Metals | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 6 | Woods & Plastics | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 7 | Moisture/Thermal Control | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | $0 | ERROR:#DIV/0! | |||||||||||||||||||
| 8 | Doors | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 9 | Finishes | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 10 | Specialties | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | $0 | ERROR:#DIV/0! | |||||||||||||||||||
| 11 | Equipment | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 12 | Furnishings | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 13 | Special Construction | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 14 | Conveying Systems | $0 | 0% | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||
| 0 | $0 | ERROR:#DIV/0! | |||||||||||||||||||
| 15 | Mechanical | 0% | 0 | 0 | $0.00 | $0.00 | $0 | $0 | 0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 0 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 16 | Electrical | $0 | 0% | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||
| 0 | 0 | 0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||||
| Project Total | $0 | 0% | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | Project Contingency Included in Above Totals (Div. 1-16) | ||||||||
| 1 | ERROR:#DIV/0! | ||||||||||||||||||||
| 2 | NIST Project Requirements (Div. 0) | $0 | 0% | 0 | 0 | $0.00 | $0.00 | $0 | $0.00 | $0 | 0 | $0 | ERROR:#DIV/0! | ||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | |||||||||||
| 4 | NIST Project Contingency (undefined scope) | 0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||||
| 5 | Round Off | $0 | $0 | ERROR:#DIV/0! | |||||||||||||||||
| Project Funding | $0 | 0% | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | $0 | check total | |||||||
| 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | ERROR:#DIV/0! | |||||||||||||||
| $0 |
&F &"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
0-NIST Req's
| 10/7/00 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 OF 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 0 - NIST General Requirements | Proj. Code: | 0.0 | |||||||||
| Rev: | Owner: | 0 | Estimator: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | |||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | Compaction & Concrete Testing | ea | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 2 | Paint Inspection | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 3 | Welding inspection | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 4 | Soils Testing | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 5 | Construction Photos | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 6 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 8 | Travel & Per Diem | trips | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 9 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 10 | Temporary fencing & barricades | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 11 | Temporary Construction | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 12 | Temporary Utilities | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 13 | Scaffolding/ Safety Nets | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 15 | Reprographics/ Reproduction | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 16 | Federal Express Charges | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 17 | Engineering: | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 18 | Shop 10- Supervision | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 19 | Shop 12-MAIT CONTRACT MANAGEMENT | EA | 0 | 0 | 0 | $64.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 20 | Shop 13- Mechanical Engineering | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 21 | Shop 14- Civil Engineering | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 22 | Shop 15- Electrical Engineering Technician | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 23 | Shop 16- Mechanical Engineering Technician | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 24 | Shop 17- Civl Engineering Technician | 0 | 0 | 0 | $64.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 25 | Shop 19- Estimates- Engineering | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 26 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 27 | Shop 20- Operations Overhead/OMO | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 28 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 29 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 30 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | ||||||||||
| 31 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||||||
| 32 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 33 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 34 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||||||
| 35 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||||||
| 36 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||||||
| 37 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||||||
| 38 | Division 0 Contingency | 0 | dol | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 0.0% | 0.0% | ERROR:#DIV/0! | 0.0% | 0.0% | 0.0% | ERROR:#DIV/0! |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
1-Gen Req's
| 6/12/98 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | ||||||||
| 0 | Check= | $0 | |||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading | ||||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | PAGE: | 1 OF 1 | |||||||
| Proj: | 0.0 | Date: | DATE: | 23-Jun-25 | |||||||||
| Pkg: | 1 - General Requirements | Proj. Code: | PROJ CODE: | 0.0 | |||||||||
| Rev: | Owner: | 0 | Estimator: | ESTIMATOR: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | |||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | ||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | |||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | ||||||||
| 1 | Gen. Contractor's Overhead | 0 |
Jim Daley: Jim Daley:
| Subtotal of summary less Div 1. Adjust for Div's done by GC. | dol | $0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 2 | Gen. Contractor's Profit | 0 | dol | $0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 3 | Project Supervisor | 0 | hrs | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||
| 4 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 5 | Performance Bond | 0 | dol | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||
| 6 | Insurance | 0 | dol | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 8 | Compaction & Concrete Testing | ea | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||
| 9 | Paint Inspection | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 10 | Welding inspection | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 11 | Testing Services | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 12 | Construction Photos | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 13 | Surveying | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 15 | Travel & Per Diem | trips | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||
| 16 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 17 | Temporary fencing & barricades | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 18 | Temporary Construction | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 19 | Temporary Utilities | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 20 | Scaffolding/ Safety Nets | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 21 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 22 | Contractor's Tempory Office Trailers | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 23 | Portable Chemical Toilet Rental | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 24 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 25 | Phones | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||
| 26 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 27 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 28 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 29 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 |
Jim Daley: Jim Daley:
This is to calculate the % of SCMMR cost allocation for below the subtotal items.
Jim Daley: Jim Daley:
| Subtotal of summary less Div 1. Adjust for Div's done by GC. | ERROR:#DIV/0! | ||||||||||||||||||
| 30 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||||
| $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||||
| 32 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 33 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 34 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 35 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||||
| 36 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||||
| 37 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||||
| 38 | Division 1 Contingency | 0 | dol | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | Total SCMMR | ||||||||
| 0.0% | 0.0% | ERROR:#DIV/0! | 0.0% | 0.0% | 0.0% | ERROR:#DIV/0! |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
2-Site
| 10/7/00 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading; Ctrl+o 1pg print range; Ctrl+t 2pg print range | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 of 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 2 - Site | Proj. Code: | 2.0 | |||||||||
| Rev: | Owner: | NIST | Estimator: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | $33.45 | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of Total | |||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 2 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 4 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 5 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 6 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 8 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 9 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 10 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 11 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 12 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 13 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 15 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 16 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 17 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 18 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 19 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 20 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 21 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 22 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 23 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 24 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 25 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 26 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||||||
| 27 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 28 |
Jim Daley: Jim Daley:
This line reserved for 2nd page subtotal. DO NOT put data on this line.
Jim Daley: Jim Daley:
| X = SCMMR funds | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||
| 29 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 |
Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | ERROR:#DIV/0! | |||||||||||||||||||
| 30 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||
| 31 | Supervisor- Contractor | 0 | hr | 5.0% | 1 | 0.05 | 0 | $45.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 32 | Move-in / Out & Clean Up | 0 | hr | 5.0% | 1 | 0.05 | 0 | $33.45 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 33 | Misc. Construction Equipment & small tools | 0 | dol | 7.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 34 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||
| 35 | Freight on Materials | 0 | dol | 3.5% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 36 | Taxes on Materials | 0 | dol | 4.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 37 | Installing Contractor's O.H. & Profit | 25.0% | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 38 | Div. 2 Contingency | 0 | dol | 15.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | Total SCMMR | |||||||||
| 0.0% | 0.0% | ERROR:#DIV/0! | 0.0% | 0.0% | 0.0% | CheckTotal | ||||||||||||||
| 0 | ||||||||||||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | PAGE: | PAGE: | 2 of 2 | ||||||||||||||
| Proj: | 0.0 | DATE: | DATE: | 23-Jun-25 | ||||||||||||||||
| Pkg: | 2 - Site | PROJ CODE: | PROJ CODE: | 2.0 | ||||||||||||||||
| Rev: | 0.0 | Owner: | 0 | ESTIMATOR: | ESTIMATOR: | 0.0 | ||||||||||||||
| Type: | Budget Check Estimate | |||||||||||||||||||
| SCMMR |
Jim Daley: Jim Daley:
X = SCMMR funds Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | ||||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | ||||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | ||||||||||
| 39 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 40 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 41 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 42 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 43 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 44 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 45 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 46 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 47 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 48 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 49 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 50 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 51 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 52 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 53 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 54 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 55 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 56 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 57 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 58 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 59 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 60 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 61 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 62 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 63 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 64 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 65 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 66 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 67 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 68 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 69 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 70 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 71 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 72 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 73 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 74 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 75 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| Page Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | SCMMR Sub Total |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
3-Conc.
| 6/12/98 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading; Ctrl+o 1pg print range; Ctrl+t 2pg print range | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 of 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 3 - Concrete | Proj. Code: | 3.0 | |||||||||
| Rev: | Owner: | NIST | Estimator: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of Total | ||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 2 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 4 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 5 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 6 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 8 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 9 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 10 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 11 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 12 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 13 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 15 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 16 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 17 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 18 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 19 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 20 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 21 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 22 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 23 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 24 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 25 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 26 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 27 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 28 |
Jim Daley: Jim Daley:
This line reserved for 2nd page subtotal. DO NOT put data on this line.
Jim Daley: Jim Daley:
| X = SCMMR funds | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||
| 29 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 |
Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | ERROR:#DIV/0! | |||||||||||||||||||
| 30 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||
| 31 | Supervisor- Contractor | 0 | hr | 0 | 0 | 0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||
| 32 | Move-in / Out & Clean Up | 0 | hr | 0 | 0 | 0 | $0.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||
| 33 | Misc. Construction Equipment & small tools | 0 | dol | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 34 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||
| 35 | Freight on Materials | 0 | dol | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 36 | Taxes on Materials | 0 | dol | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 37 | Installing Contractor's O.H. & Profit | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 38 | Div. 3 Contingency | 0 | dol | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | 0 | $0 | Total SCMMR | |||||||||
| 0.0% | 0.0% | ERROR:#DIV/0! | 0.0% | 0.0% | 0.0% | CheckTotal | ||||||||||||||
| 0 | ||||||||||||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | PAGE: | PAGE: | 2 of 2 | ||||||||||||||
| Proj: | 0.0 | DATE: | DATE: | 23-Jun-25 | ||||||||||||||||
| Pkg: | 3 - Concrete | PROJ CODE: | PROJ CODE: | 3.0 | ||||||||||||||||
| Rev: | 0.0 | Owner: | 0 | ESTIMATOR: | ESTIMATOR: | 0.0 | ||||||||||||||
| Type: | Budget Check Estimate | |||||||||||||||||||
| SCMMR |
Jim Daley: Jim Daley:
X = SCMMR funds Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | ||||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | ||||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | ||||||||||
| 39 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 40 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 41 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 42 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 43 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 44 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 45 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 46 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 47 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 48 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 49 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 50 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 51 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 52 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 53 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 54 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 55 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 56 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 57 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 58 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 59 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 60 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 61 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 62 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 63 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 64 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 65 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 66 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 67 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 68 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 69 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 70 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 71 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 72 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 73 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 74 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 75 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| Page Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | SCMMR Sub Total |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
4-Masonry
| 10/7/00 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading; Ctrl+o 1pg print range; Ctrl+t 2pg print range | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 of 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 4 - Masonry | Proj. Code: | 4.0 | |||||||||
| Rev: | Owner: | NIST | Estimator: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of Total | ||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 2 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 4 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 5 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 6 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 8 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 9 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 10 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 11 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 12 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 13 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 15 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 16 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 17 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 18 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 19 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 20 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 21 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 22 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 23 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 24 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 25 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 26 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 27 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 28 |
Jim Daley: Jim Daley:
This line reserved for 2nd page subtotal. DO NOT put data on this line.
Jim Daley: Jim Daley:
| X = SCMMR funds | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||
| 29 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | |||||||||||
| 30 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||||||||
| 31 | Supervisor- Contractor | 0 | hr | 5.0% | 1 | 0.05 | 0 | $45.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 32 | Move-in / Out & Clean Up | 0 | hr | 5.0% | 1 | 0.05 | 0 | $0.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 33 | Misc. Construction Equipment & small tools | 0 | dol | 7.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||||
| 34 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 35 | Freight on Materials | 0 | dol | 3.5% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||||
| 36 | Taxes on Materials | 0 | dol | 4.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||||
| 37 | Installing Contractor's O.H. & Profit | 25.0% | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 38 | Div. 4 Contingency | 0 | dol | 15.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | 0 | $0 | Total SCMMR | ||||||||||||
| 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | CheckTotal | |||||||||||||||||
| 0 | |||||||||||||||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | PAGE: | PAGE: | 2 of 2 | |||||||||||||||||
| Proj: | 0.0 | DATE: | DATE: | 23-Jun-25 | |||||||||||||||||||
| Pkg: | 4 - Masonry | PROJ CODE: | PROJ CODE: | 4.0 | |||||||||||||||||||
| Rev: | 0.0 | Owner: | 0 | ESTIMATOR: | ESTIMATOR: | 0.0 | |||||||||||||||||
| Type: | Budget Check Estimate | ||||||||||||||||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | $0.00 | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | |||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | ||||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | ||||||||||
| 39 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 40 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 41 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 42 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 43 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 44 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 45 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 46 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 47 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 48 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 49 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 50 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 51 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 52 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 53 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 54 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 55 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 56 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 57 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 58 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 59 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 60 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 61 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 62 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 63 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 64 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 65 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 66 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 67 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 68 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 69 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 70 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 71 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 72 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 73 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 74 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 75 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| Page Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | SCMMR Sub Total |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
5-Metals
| 6/12/98 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading; Ctrl+o 1pg print range; Ctrl+t 2pg print range | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 of 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 5 - Metals | Proj. Code: | 5.0 | |||||||||
| Rev: | Owner: | NIST | Estimator: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of Total | ||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 2 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 4 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 5 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 6 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 8 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 9 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 10 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 11 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 12 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 13 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 15 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 16 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 17 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 18 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 19 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 20 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 21 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 22 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 23 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 24 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 25 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 26 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 27 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 28 |
Jim Daley: Jim Daley:
This line reserved for 2nd page subtotal. DO NOT put data on this line.
Jim Daley: Jim Daley:
| X = SCMMR funds | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||
| 29 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 |
Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | ERROR:#DIV/0! | |||||||||||||||||||
| 30 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||
| 31 | Supervisor- Contractor | 0 | hr | 5.0% | 1 | 0.05 | 0 | $45.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 32 | Move-in / Out & Clean Up | 0 | hr | 5.0% | 1 | 0.05 | 0 | $0.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 33 | Misc. Construction Equipment & small tools | 0 | dol | 7.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 34 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||
| 35 | Freight on Materials | 0 | dol | 3.5% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 36 | Taxes on Materials | 0 | dol | 4.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 37 | Installing Contractor's O.H. & Profit | 25.0% | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 38 | Div. 5 Contingency | 0 | dol | 15.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | 0 | $0 | Total SCMMR | |||||||||
| 0.0% | 0.0% | ERROR:#DIV/0! | 0.0% | 0.0% | 0.0% | CheckTotal | ||||||||||||||
| 0 | ||||||||||||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | PAGE: | PAGE: | 2 of 2 | ||||||||||||||
| Proj: | 0.0 | DATE: | DATE: | 23-Jun-25 | ||||||||||||||||
| Pkg: | 5 - Metals | PROJ CODE: | PROJ CODE: | 5.0 | ||||||||||||||||
| Rev: | 0.0 | Owner: | 0 | ESTIMATOR: | ESTIMATOR: | 0.0 | ||||||||||||||
| Type: | Budget Check Estimate | |||||||||||||||||||
| SCMMR |
Jim Daley: Jim Daley:
X = SCMMR funds Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | LABOR | $0.00 | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | ||||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | |||||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||||
| 39 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 40 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 41 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 42 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 43 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 44 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 45 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 46 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 47 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 48 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 49 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 50 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 51 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 52 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 53 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 54 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 55 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 56 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 57 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 58 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 59 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 60 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 61 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 62 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 63 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 64 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 65 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 66 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 67 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 68 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 69 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 70 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 71 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 72 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 73 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 74 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 75 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| Page Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | SCMMR Sub Total |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
6-Wood & Plastic
| 6/12/98 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading; Ctrl+o 1pg print range; Ctrl+t 2pg print range | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 of 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 6 - Woods & Plastics | Proj. Code: | 6.0 | |||||||||
| Rev: | Owner: | NIST | Estimator: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of Total | ||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 2 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 4 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 5 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 6 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 8 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 9 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 10 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 11 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 12 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 13 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 15 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 16 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 17 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 18 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 19 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 20 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 21 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 22 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 23 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 24 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 25 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 26 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 27 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 28 |
Jim Daley: Jim Daley:
This line reserved for 2nd page subtotal. DO NOT put data on this line.
Jim Daley: Jim Daley:
| X = SCMMR funds | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||
| 29 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 |
Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | ERROR:#DIV/0! | |||||||||||||||||||
| 30 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||
| 31 | Supervisor- Contractor | 0 | hr | 5.0% | 1 | 0.05 | 0 | $45.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 32 | Move-in / Out & Clean Up | 0 | hr | 5.0% | 1 | 0.05 | 0 | $0.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 33 | Misc. Construction Equipment & small tools | 0 | dol | 7.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 34 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||
| 35 | Freight on Materials | 0 | dol | 3.5% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 36 | Taxes on Materials | 0 | dol | 4.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 37 | Installing Contractor's O.H. & Profit | 25.0% | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 38 | Div. 6 Contingency | 0 | dol | 15.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | 0 | $0 | Total SCMMR | |||||||||
| 0.0% | 0.0% | ERROR:#DIV/0! | 0.0% | 0.0% | 0.0% | CheckTotal | ||||||||||||||
| 0 | ||||||||||||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | PAGE: | PAGE: | 2 of 2 | ||||||||||||||
| Proj: | 0.0 | DATE: | DATE: | 23-Jun-25 | ||||||||||||||||
| Pkg: | 6 - Woods & Plastics | PROJ CODE: | PROJ CODE: | 6.0 | ||||||||||||||||
| Rev: | 0.0 | Owner: | 0 | ESTIMATOR: | ESTIMATOR: | 0.0 | ||||||||||||||
| Type: | Budget Check Estimate | |||||||||||||||||||
| SCMMR |
Jim Daley: Jim Daley:
X = SCMMR funds Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | LABOR | $0.00 | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | ||||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | |||||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||||
| 39 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 40 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 41 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 42 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 43 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 44 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 45 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 46 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 47 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 48 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 49 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 50 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 51 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 52 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 53 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 54 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 55 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 56 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 57 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 58 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 59 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 60 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 61 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 62 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 63 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 64 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 65 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 66 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 67 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 68 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 69 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 70 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 71 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 72 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 73 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 74 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 75 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| Page Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | SCMMR Sub Total |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
7-Moist. Therm Cntrl
| 6/12/98 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading; Ctrl+o 1pg print range; Ctrl+t 2pg print range | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 of 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 7 - Moisture/Thermal Control | Proj. Code: | 7.0 | |||||||||
| Rev: | Owner: | NIST | Estimator: | |||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of Total | ||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 2 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 4 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 5 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 6 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 7 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 8 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 9 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 10 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 11 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | ||||||||||
| 12 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 13 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 14 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 15 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 16 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 17 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 18 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 19 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 20 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 21 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 22 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 23 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 24 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 25 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 26 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 27 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 28 |
Jim Daley: Jim Daley:
This line reserved for 2nd page subtotal. DO NOT put data on this line.
Jim Daley: Jim Daley:
| X = SCMMR funds | 0 | 0 | 0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||
| 29 | Sub Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 |
Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | ERROR:#DIV/0! | |||||||||||||||||||
| 30 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||||
| 31 | Supervisor- Contractor | 0 | hr | 5.0% | 1 | 0.05 | 0 | $45.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 32 | Move-in / Out & Clean Up | 0 | hr | 5.0% | 1 | 0.05 | 0 | $0.00 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 33 | Misc. Construction Equipment & small tools | 0 | dol | 7.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 34 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||
| 35 | Freight on Materials | 0 | dol | 3.5% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 36 | Taxes on Materials | 0 | dol | 4.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| 37 | Installing Contractor's O.H. & Profit | 25.0% | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 38 | Div. 7 Contingency | 0 | dol | 10.0% | $0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||
| Package Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | 0 | $0 | Total SCMMR | |||||||||
| 0.0% | 0.0% | ERROR:#DIV/0! | 0.0% | 0.0% | 0.0% | CheckTotal | ||||||||||||||
| 0 | ||||||||||||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | PAGE: | PAGE: | 2 of 2 | ||||||||||||||
| Proj: | 0.0 | DATE: | DATE: | 23-Jun-25 | ||||||||||||||||
| Pkg: | 7 - Moisture/Thermal Control | PROJ CODE: | PROJ CODE: | 7.0 | ||||||||||||||||
| Rev: | 0.0 | Owner: | 0 | ESTIMATOR: | ESTIMATOR: | 0.0 | ||||||||||||||
| Type: | Budget Check Estimate | |||||||||||||||||||
| SCMMR |
Jim Daley: Jim Daley:
X = SCMMR funds Jim Daley: Jim Daley:
| This is to calculate the % of SCMMR cost allocation for below the subtotal items. | LABOR | $0.00 | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | ||||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | |||||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||||
| 39 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 40 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 41 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 42 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 43 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 44 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 45 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 46 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 47 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 48 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 49 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 50 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 51 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 52 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 53 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 54 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 55 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 56 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 57 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 58 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 59 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 60 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 61 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 62 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 63 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 64 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 65 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 66 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 67 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 68 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 69 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 70 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 71 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 72 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 73 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 74 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| 75 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||||
| Page Total | 0 | $0 | $0 | $0 | 0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | SCMMR Sub Total |
&"Arial,Italic"&14Page &P of &N &"Arial,Bold Italic"&14&A
8-Doors
| 6/12/98 | Total= | $0 | DIFF= | 1 | Cols. P&Q are hidden, unhide for Engineering | |||||||
| 0 | Check= | $0 | ||||||||||
| Macros: | Ctrl+L locks heading; Ctrl+U unlocks heading; Ctrl+o 1pg print range; Ctrl+t 2pg print range | |||||||||||
| National Institute of Standards & Technology, Boulder, CO | Proj. Engineer: | 0 | REMARKS: | Page: | 1 of 1 | |||||||
| Proj: | 0.0 | Date: | 23-Jun-25 | |||||||||
| Pkg: | 8 - Doors | Proj. Code: | 8.0 | |||||||||
| Rev: | Owner: | NIST | Estimator: | 0.0 | ||||||||
| Type: | Budget Check Estimate | SCCMR = | $0 | 0.0% | ||||||||
| SCMMR |
Jim Daley: Jim Daley:
| X = SCMMR funds | LABOR | MATERIAL | EQUIPMENT | ENGINEERING | OVERALL | % of Total | ||||||||||||||
| # | DESCRIPTION | QTY | UOM | BASE | DIFF | PROJ | MAN | LABOR | $65.00 | OTHER | TOTAL | SCMMR | ||||||||
| UMH | FCTR | UMH | HRS | RATE | COST | UNIT | COST | UNIT | COST | HRS | COST | |||||||||
| 1 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 2 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 | |||||||||
| 3 | 0 | 0 | 0 | $0.00 | $0 | $0 | $0 | $0 | $0 | ERROR:#DIV/0! | $0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .