1333ND25RNB190029 AMD 0001 Revise Section L Lightning Protection NIST Boulder CO.pdf
PDF 1 MB Posted
- Attached to
- Lightning Protection Repairs at CUP
- Solicitation number
- 1333ND25RNB190029
About this file
This document is an Amendment (0001) to Solicitation 1333ND25RNB190029 for Lightning Protection Repairs at the Central Utility Plant (CUP) at the National Institute of Standards and Technology (NIST) in Boulder, CO. The amendment revises Section L "Instructions for Offerors" and maintains the original offer due date of August 12, 2025, at 3:00 PM (MT). Key proposal submission requirements include a 20-page technical approach detailing work methods, quality control, safety processes, and subcontractors; a proposed performance schedule with an estimated Notice to Proceed date of August 29, 2025; key personnel resumes demonstrating Master Installer certification; and a price proposal with lump sum pricing for two Contract Line Item Numbers (CLINs).
Offerors must complete and submit Standard Form (SF) 1442 Pages 1-4, Section K Representations and Certifications, a price proposal, and Attachment 02 - Blank Bid Form with price breakdowns. A site visit list of attendees is due by 9:00 AM MDT on July 8, 2025, and any solicitation questions must be received by 3:00 PM MDT on July 17, 2025. The government reserves the right to eliminate offers from consideration at any time prior to contract award and will not be liable for any offeror costs associated with proposal preparation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1333ND25RNB190029 AMD 0002 QA.pdf | ||
| Att 02 BLANK BID FORM.xlsx | XLSX spreadsheet | |
| 1333ND25RNB190029 Lightning Protection Repairs CUP NIST Boulder CO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Attachment Page
PAGE 2 OF 6 1333ND25RNB1900290001
The purpose of this amendment (0001) is to incorporate revisions to section L “Instructions for Offerors:
A. Section L “Instruction for Offerors” is hereby superseded and replaced by the attached update “Instructions for Offerors Rev. 1”
B. The Offer Due Date remains unchanged due to this amendment at: August 12, 2025, no later than 3:00 PM (MT).
C. No other changes occur as a result of this amendment.
Table of Contents
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 Instruction to Offerors Rev. 1
PAGE 3 OF 6 1333ND25RNB1900290001
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 Instruction to Offerors Rev. 1
PAGE 4 OF 6 1333ND25RNB1900290001
Instructions, Conditions, Notices to Offerors Rev. 1
1. Proposal Submission Requirements:
Evaluation Factors are as follows:
Factor 1: Technical approach Factor 2: Schedule Factor 3: Key Personnel Factor 3 4: Price
a. Factor 1 - Technical Approach:
The offeror shall submit a Plan of Approach (use diagrams, tables, etc., when appropriate) describing the Offeror’s approach to accomplishing the requirements of the solicitation. The technical approach shall include a clear approach to completing technical aspects of work, means/methods of accomplishing tasks to be performed, material data/information specific to replacement item(s), details specific to support the offeror’s proposed schedules, quality control and safety process(es), Communications diagram, and a complete listing of anticipated subcontractors by discipline.
The Plan of Approach shall not exceed 20 single-sided pages (8.5” x 11”) in length using no smaller than 11-point font; this font size limit is applicable throughout the document to include tables, diagrams, and charts. *Please note, material data / information cut sheets do not count toward the 20-page limit.
The plan of approach shall also include the offeror’s approach to quality control and safety.
b. Factor 2 - Schedule:
The Offeror shall submit a proposed period of performance and corresponding schedule each CLIN.
(a) An estimated Notice to Proceed date of 29 August 2025 shall be used.
c. Factor 3 – Key Personnel
The offeror shall submit resumes to verify that all personnel performing the repair or installation are appropriately qualified, or that their work is subject to inspection by a qualified individual. The minimum required qualification is Master Installer certification by LPI or an equivalent credential.
d. Factor 3 4 - Price:
1. Price proposals shall include the information identified below:
PAGE 5 OF 6 1333ND25RNB1900290001
(a) Offer shall complete and submit Pages 1 through 4 of the Solicitation, Standard Form (SF) 1442. Complete Blocks 14, 15, 17, 18, 19, and 20A through 20C of the SF 1442. An official having the authority to contractually bind the Offeror's company must sign the SF 1442 in accordance with the procedures prescribed in FAR 4.102.
(b) Return a completed Section K, Representations and Certifications included in the solicitation.
(c) Complete and submit Price Proposal identifying lump sum price for both CLINs 0001 and 0002 provided on Page 4 of the Solicitation.
(d) Complete and submit Att 02 – Blank Bid Form identifying a breakdown of prices provided in c above.
2. The Government reserves the right to eliminate from consideration for award, any or all offers at any time prior to award of the contract.
3. The Government shall not be liable for any costs incurred by the offeror attending the site-visit or submitting a proposal in response to this Solicitation.
4. System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications— Commercial Products and Commercial Services. Contracting officers shall not consider or use these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
5. In the event there are any inconsistencies between the base contract requirements and the contract SOW(s), the contractor shall bring these to the attention of the contracting officer not later than the site visit
6. A list of individuals attending the site visit is due to the POC listed in Block 9 of the SF 1442 no later than 9:00 AM MDT / 08 July 2025. The list must include each attendee’s full legal name (first, middle, and last). If an individual does not have a middle name, that must be explicitly stated.
7. Any questions related to this solicitation must be received by the POC listed in Block 9 of the SF 1442 no later than 3:00 PM MDT / 17 July 2025.
PAGE 6 OF 6 1333ND25RNB1900290001
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable
| Descript: |
| Descript1: See Attachment Page. |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 6 |
| DocNo: 1333ND25RNB1900290001 |
| EffDate: JUN 25, 2025 |
| ReqNo: NB194000-25-01230 |
| ProjNo: |
| IssuedByCode: 000014 |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
325 BROADWAY
BOULDER CO 80305-3328
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolNo: 1333ND25RNB190029 |
| SolDate: JUN 23, 2025 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| 15B. CONTRACTOR/OFFEROR: |
| signature: |
| AwdChg: Off |
| SolChg: Yes |
| Header: |
| Footer1: |