Requirements.docx
DOCX document 28 KB Posted
- Attached to
- UHV Chambers Federal contract opportunity
- Solicitation number
- 1333ND24QNB680331
About this file
This document is a requirements document for a federal contract opportunity. The National Institute of Standards and Technology (NIST) requires nine vacuum chambers/components to be interconnected and form a vacuum space for a new scanning probe system (SPM) laboratory. The required components include a FIM chamber, FIM source flange, and a load lock. All items must be new and delivered within 18 weeks after award. Inspection and acceptance will occur within 7 business days after receipt at NIST, and the contractor shall provide a 1-year warranty. The contract will be awarded under Solicitation Number 1333ND24QNB680331, with a total of $XXX available for the vacuum chamber/component requirements. The government has the right to perform testing and evaluations to verify system performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| UHV_chamber_STEP_files.zip | ZIP file | |
| NIST_SPM_Lab_Chambers.pdf | ||
| 1333ND24QNB680331.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications Background:
The National Institute of Standards and Technology (NIST) requires extreme high vacuum (XHV) chambers for a new scanning probe system (SPM) at NIST. To fulfill this requirement, NIST requires nine vacuum chambers/components that will be interconnected to form a vacuum space for the SPM laboratory to perform sample and probe preparation, and SPM measurements.
LIST OF ATTACHMENTS:
The following documents are hereby provided as attachments. The purpose of these attachments is for reference and to provide specification requirements to the Contractor for quotation purposes only.
1. NIST_SPM_Lab_Chambers.pdf
2. UHV_chamber_STEP_files.zip
Minimum Requirements The system shall meet the minimum requirements identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered. The use of “gray market” components not authorized for sale in the U.S. by the Contractor is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
The Contractor shall provide the following vacuum chambers/components as detailed in 2D drawings in NIST_SPM_Lab_Chambers.pdf, and 3D CAD STEP files in UHV_chamber_STEP_files.zip:
CLIN 0001: FIM_Chamber CLIN 0002: FIM_source_flange CLIN 0003: Load_lock Delivery Delivery shall be FOB DESTINATION and shall occur not later than (NLT) 18 weeks ARO.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. The contractor shall deliver all Line Items to:
The National Institute of Standards and Technology 100 Bureau Drive, Building 301, Shipping and Receiving, Gaithersburg, MD 20899 Inspection and Acceptance In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
Inspection and acceptance shall occur within seven (7) business days after receipt of the equipment at NIST.
Inspection tests shall be performed at NIST by a government official. These tests shall include:
A visual inspection of the pumps will be performed by the NIST TPOC to identify surface defects or any form of indication that the equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the Ion Pumps due to defects and/or nonconformance.
Warranty The contractor shall provide a one year warranty for the equipment in accordance with the vendor’s standard warranty after receipt of the equipment and shall be in accordance with terms in FAR 52.212-4 Payment Schedule The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:
1. 100% after receipt and acceptance by the TPOC of fully delivered system.
File details come from the government source that posted it. Updated .