1333ND24QNB190518 BR193-45 Window Requirement FormSF1449.pdf
PDF 960 KB Posted
- Attached to
- BR193-45 Window Requirement Federal contract opportunity
- Solicitation number
- 1333ND24QNB190518
About this file
This document is a Scope of Work (SOW) for a contract to provide repair, maintenance, and replacement services for existing window systems at the National Institute of Standards and Technology (NIST) Gaithersburg, Maryland campus.
The contract will be a single award to a vendor with the ability to perform a variety of window system work such as repairs or replacements of glass windows, storefronts, exterior and interior sealant, glazing beads, window trim, window gaskets, and other related items. The work is divided into four main tasks covering repairs to window systems in multiple NIST buildings, including removing and replacing exterior sealant, glazing compound, and metal flashing. Task 4 is a not-to-exceed contract line item for additional repairs, maintenance, and replacements as needed. The contract will have a 365-day period of performance. Offerors must submit a detailed scope of work, construction schedule, management plan, and pricing breakdown. NIST requires badging and security access for all contractor personnel.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1333ND24QNB190518A003 A003 FormSF30.pdf | ||
| 1333ND24QNB190518 A002 FormSF30.pdf | ||
| 1333ND24QNB190518 A0001 Page 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ IFB RFP
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
EDWOSB
SMALL BUSINESS PROGRAM
X
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Tasks 1 - 3
0001 Contractor shall provide all materials and labor necessary to complete repairs to existing window systems as defined in Tasks 1 - 3, in the statement of work.
PR NUMBER: NB193000-24-02116
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 10/01/2024 to 09/30/2025
1.00 JB
Task 4
NTE NTE
0002 Contractor shall provide all materials and labor necessary to complete repairs, maintenance, and replacements to existing window systems, as defined in Task 4, in the statement of work.
PR NUMBER: NB193000-24-02116
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 10/01/2024 to 09/30/2025
-8 Extension Tasks 1 - 3
OPT
1001 -8 Extension Contractor shall provide all materials and labor necessary to complete repairs to existing window systems as defined in Tasks 1 - 3, in the statement of work.
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 10/01/2025 to 04/30/2026
Task 4
NTE NTE/OPT
1002 -8 Extension Contractor shall provide all materials and labor necessary to complete repairs, maintenance, and replacements to existing window systems, as defined in Task 4, in the statement of work.
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination Period of Performance: 10/01/2025 to 04/30/2026
PAGE 3 OF 75 1333ND24QNB190518
Table of Contents
Scope Of Work
Wage Determination No 2015-4269
52.202-1DEFINITIONS (JUN 2020)
52.203-7ANTI-KICKBACK PROCEDURES (JUN 2020)
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)
52.204-6 UNIQUE ENTITY IDENTIFIER (OCT 2016)
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
52.204-12 UNIQUE ENTITY IDENTIFIER MAINTENANCE (OCT 2016)
52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-16COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
52.204-17OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020)
52.204-18COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
52.204-23PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY
KASPERSKY LAB COVERED ENTITIES (DEC 2023)
52.204-29FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS--REPRESENTATION AND DISCLOSURES (DEC
2023)
52.204-30FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS--PROHIBITION (DEC 2023)
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV 2015)... 33
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER
ANY FEDERAL LAW (FEB 2016)
52.212-1INSTRUCTIONS TO OFFERORS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)
52.212-3OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY
2024)
52.212-4CONTRACT TERMS AND CONDITIONS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
52.212-5CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (MAY 2024)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (JUN 1988)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.219-1SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)
52.219-18NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(A) PARTICIPANTS (OCT 2022)
52.219-28POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (FEB 2024)
52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)
52.222-48 EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO CONTRACTS FOR MAINTENANCE, CALIBRATION, OR REPAIR OF CERTAIN EQUIPMENT--CERTIFICATION (MAY 2014)
52.222-51 EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO CONTRACTS FOR MAINTENANCE, CALIBRATION, OR REPAIR OF CERTAIN EQUIPMENT--REQUIREMENTS (MAY 2014)
52.222-55MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022)
52.223-6{52.223-6} [RESERVED]
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)
52.237-1 SITE VISIT (APR 1984)
52.237-3 CONTINUITY OF SERVICES (JAN 1991)
52.244-6SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
PAGE 4 OF 75 1333ND24QNB190518
Table of Contents
1352.219-70 SECTION 8(a) DIRECT AWARD (DEVIATION) (APR 2010)
1352.219-72 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(a) CONCERNS, ALTERNATE III (DEVIATION)
(APR 2010)
NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
NIST LOCAL-54ELECTRONIC BILLING INSTRUCTIONS
Evaluation-Basis of Award
Instructions to Quoters
PAGE 5 OF 75 1333ND24QNB190518
CLAUSES
Scope Of Work
PAGE 6 OF 75 1333ND24QNB190518
Window Repair/Replacement Requirements Contract SOW
Window Repair/Replacement Requirements Contract SCOPE OF WORK (SOW)
Background:
The National Institute of Standards and Technology (NIST) is a Bureau within the U.S. Department of Commerce. The NIST Gaithersburg, Maryland Campus encompasses 579 acres and includes over 60 Buildings. There are thousands of window systems on site, and when issues arise, they need to be addressed promptly to prevent further damage.
Objectives:
The NIST intends to award a contract to a single vendor to provide support services such as repairs, maintenance, and/or glass replacements to existing window systems located at the NIST Gaithersburg, Maryland campus. The Contractor shall have the ability to provide a variety of window system work such as repairs or replacements of glass windows, storefronts, exterior and interior sealant, glazing beads, window trim, window gaskets, shims, and any other window system-related items.
Scope:
The Contractor shall be responsible for providing all required management, training, licensed personnel, labor, materials, equipment, tools, protective equipment, and other items needed to accomplish the work described in this solicitation. All work shall be in conformance with the requirements of the contract and manufacturer recommendations. All work shall be in compliance with Federal, State, and Local requirements, as well as OSHA 1926 Safety and Health Regulations for Construction.
Task 1
The following is a list of tasks necessary to remove and replace existing exterior window sealant at window stacks of the General Purpose Laboratory buildings 220, 221, 224, 225, and 226. The window stacks are 3 stories tall and run from the 1st floor up to the Attic Louvers. The specific stacks are associated to the following Building/Room numbers: B220/RmB328, B221/RmB366, B221/RmA323, B221/RmA327, B221/RmA363, B224/RmB324, B224/RmB350, B224/RmB338, B225/Rooms A303 – A325, B226/RmB364, B226/RmB366, B226/RmB368, and B226/Rm370. This list is not an all-inclusive list of every sub-task necessary but is intended to document the more major tasks necessary for this project for bidding purposes.
1. Submit Activity Hazard Analysis (AHA) for each task of the work to COR for approval.
2. Completely remove all existing metal to masonry sealant and install new sealant and backer rod along the entire perimeter of the window stack. The total length to be removed and replaced per window stack is 80 linear feet.
3. Remove existing metal flashing joint caps at the top of window stacks, just below attic louvers.
Completely remove all existing sealant in joints under metal cap and install new sealant between all metal joints. Reinstall metal flashing cap and seal with silicone sealant. Total length to be removed and replaced is 2 linear feet.
4. Completely remove all existing metal to metal sealant and install new sealant between all joints of all insulated metal panels of the window stack. Total length to be removed and replaced per window stack is 70 linear feet.
5. Clear and ensure existing weeps at bottom of lower insulated panel of the window stack are open for drainage. Total number of weeps per window stack is two (2).
6. Completely remove all existing window glazing compound/putty (cap bead) between the glass windowpane and the metal frame and install new window glazing around the perimeter of each windowpane of the window stack. Total length to be removed and replaced per window stack is 80 linear feet.
PAGE 7 OF 75 1333ND24QNB190518
Window Repair/Replacement Requirements Contract SOW
7. Clean and prepare all joints to receive new sealant, per new sealant manufacturer’s recommendations.
Install foam backer rod as necessary to maintain a minimum ½” depth of sealant in the joint. Prime surfaces as required by new sealant manufacturer.
8. Install new ½” deep DOWSIL™ 795 Silicone Building Sealant, or approved equal, at all metal to brick joints per manufacturer’s recommendations. Use grey color.
9. Install new DOWSIL™ 795 Silicone Building Sealant, or approved equal, at metal to metal and metal to glass joints such as cap beads. Use grey color for metal-to-metal joints and black color for metal-to-glass joints.
10.Dispose of all removed materials offsite.
11.Final clean-up of work site and repair any damage done to the grounds or building due to construction.
Task 2
The following is a list of tasks necessary to remove and replace existing exterior window sealant at windows in the E-Wing of building 101. There are eight (8) windows on the north and eight (8) windows on the south side of the E-wing and are in rooms E104, E106, E107, E108, and E115. This list is not an all-inclusive list of every sub-task necessary but is intended to document the more major tasks necessary for this project for bidding purposes.
1. Submit Activity Hazard Analysis (AHA) for each task of the work to COR for approval.
2. Completely remove all existing masonry to masonry sealant at north, inside corner wall joint and install new sealant and backer rod. Total length to be removed and replaced is 20 linear feet.
3. Install new sealant at all step cracks and lintel cracks in masonry on north wall, between Library and Covered Walkway. Total length to be installed is 50 linear feet.
4. Completely remove all existing metal to masonry sealant and install new sealant and backer rod along the entire perimeter of each window. Total length to be removed and replaced per window is 30 linear feet.
5. Completely remove all existing window glazing compound/putty (cap bead) between the glass windowpane and the metal frame and install new window glazing around the perimeter of each windowpane of the window stack. Total length to be removed and replaced per window stack is 30 linear feet.
6. Clean and prepare all joints to receive new sealant, per new sealant manufacturer’s recommendations.
Install foam backer rod as necessary to maintain a minimum ½” depth of sealant in the joint. Prime surfaces as required by new sealant manufacturer.
7. Install new ½” deep DOWSIL™ 795 Silicone Building Sealant, or approved equal, at all metal to brick joints per manufacturer’s recommendations. Use grey color.
8. Install new ½” deep DOWSIL™ 795 Silicone Building Sealant, or approved equal, at all brick repair joints per manufacturer’s recommendations. Use tan color to match existing brick as close as possible.
9. Install new DOWSIL™ 795 Silicone Building Sealant, or approved equal, at metal to glass joints such as cap beads. Use black color for metal-to-glass joints.
10.Dispose of all removed materials offsite.
11.Final clean-up of work site and repair any damage done to the grounds or building due to construction.
PAGE 8 OF 75 1333ND24QNB190518
Task 3
The following is a list of tasks necessary to restore exterior window sealant at building 227. There are a total of four (4) window stacks affected and are associated with rooms A215, A355, B220, and B258. This list is not an all-inclusive list of every sub-task necessary but is intended to document the more major tasks necessary for this project for bidding purposes.
1. Submit Activity Hazard Analysis (AHA) for each task of the work to COR for approval.
2. Remove six (6) existing metal joint caps at each window stack. Completely remove all existing sealant in joints under the metal cap and install new sealant between all metal joints. Reinstall the metal flashing cap and seal with silicone sealant. The total number of joint caps to be addressed is twenty-four (24).
3. Install new sealant between joints of the metal framing on the side of the window stacks, where existing sealant/gasket material has deteriorated or missing. The total length to be installed is 100 linear feet.
4. Clean and prepare all joints to receive new sealant, per new sealant manufacturer’s recommendations.
Install foam backer rod as necessary to maintain a minimum ½” depth of sealant in the joint. Prime surfaces as required by the new sealant manufacturer.
5. Install new DOWSIL™ 795 Silicone Building Sealant, or approved equal, at metal-to-metal and metal-to-glass joints such as cap beads. Use brown color for metal-to-metal joints and black color for metal-to-glass joints.
6. Dispose of all removed materials offsite.
7. Final clean-up of the work site and repair of any damage done to the grounds or building due to construction.
Task 4
The Contractor shall provide services to complete repairs, maintenance, renovations, and alterations to deficient window systems located at the NIST Gaithersburg, Maryland campus, on an as needed basis. This will be a Not To Exceed (NTE) contract line item and funds will be drawn down as services are needed, and requested by the COR or CO or CS. The services requested on this task will be for the following:
1. Submit Activity Hazard Analysis (AHA) for each request of work to COR for approval.
2. Restoring an entire 3-story GPL window stack, with quantities and work as defined in Task 1.
3. Replacing broken windowpanes. This may be single, insulated, laminated, and/or tempered glass.
Requirements
1. All work shall be performed in accordance with OSHA 1926 requirements. A safety plan, with an Activity Hazard Analysis (AHA) detailing how each task of the work will be performed in compliance with OSHA 1926 regulations, is required to be submitted and approved prior to performing any work.
2. The Competent Person in Fall Protection shall be specifically identified in the Safety Plan.
Documentation of completing Fall Protection training shall be provided in the Safety Plan for each member of the work crew.
3. The Contractor shall have a Job Foreman, with decision making authority, to be always on site while work is being performed. Acceptable documentation of meeting this requirement is to:
a. Provide resume of employment.
PAGE 9 OF 75 1333ND24QNB190518
4. The Contractor must issue a guarantee against defective workmanship and materials for a period of one
(1) year. The period of performance must begin upon project completion and Owner acceptance and is effective upon complete payment.
Proposals
The Offeror must submit a proposal with the following items:
1. A detailed scope of work for the project as identified above. The detailed scope of work must identify all the proposed products, including the manufacturer, and must describe the construction sequence for this project.
2. A proposed construction schedule, with task durations, must be provided starting with demolition through punch list and closeout procedures. Assume a Notice to Proceed date of September 30th, 2024.
3. A construction management plan. This must include plans for material deliveries, staging/storage areas, if necessary, how work area is to be secured, and debris cleanup.
4. Offeror must submit information on how they propose to meet the items listed in the “Requirements” section of this document.
5. Offeror must provide a detailed breakdown of their proposed price for each Task number. For Task 4, provide a unit price for each item, and any discounts for multiple items.
Deliverables
Once the contract is awarded, the Contractor must submit their Safety Plan, and all Material Data and Product Submittals to:
Adam V. Yuhas, Contracting Officer Representative Email to: Adam.Yuhas@NIST.gov
The Health and Safety Plan shall include an Activity Hazard Analysis (AHA) for each task required to complete the Project detailed above. This plan is due 10 calendar days after award is made.
Hard copies of payment and performance bonds are due 10 days after award is made.
Badging
Due to security requirements, NIST requires each individual working on this contract to have a background check and receive a NIST green badge, which allows them unescorted access on the NIST campus. The contractor shall submit badging application forms within 10 business days after award of the contract. Once the badge application is accepted, each individual will be required to get fingerprinted either at NIST or an approved location, and also complete an online questionnaire for a background investigation called eAPP. Once everything is approved, each individual will be required to go back to the badge office and pick-up their badge and sign paperwork. This process should take about 60 days to get officially badged if individuals are timely in getting fingerprinted and filling out the eAPP.
Additional documents will be needed if the applicant is not a US Citizen. If the applicant is a Permanent Resident, they will need to submit a copy of their Permanent Resident Card (a.k.a. Green Card). If the applicant is in the U.S. on a work visa, they will need to submit a completed NIST-1260 form and a copy of their passport.
All badge applications, attachments, and additional documents must be emailed securely to the COR via the NIST Secure File Transfer system. Contact the COR when you are ready for this service.
PAGE 10 OF 75 1333ND24QNB190518
Security
NIST is a Federal facility and access is controlled at all entrances to the campus. Only Government employees may grant access to non-Government employees. All non-Government employees must be registered with security prior to site access. Contractor must notify COR a minimum of 48 hours prior to site access. Contractor must provide COR with first and last names, country of citizenship, and whether the individual has a permanent resident card, (a.k.a. Green Card), of all personnel requiring site access. If any individuals are here on a work visa, they will need to complete a NIST 1260 form and return to the COR. Please refer to the following web site for additional Visitor Information http://www.nist.gov/public_affairs/visitor/
Automobile & Personnel Access:
Contractor personnel arriving in cars on their first day must check in at the visitor center to receive a temporary paper badge prior to proceeding to the project site. Hours of operation of the visitor center are 0600-1700.
Once in possession of a valid NIST badge, workers may enter via the Main Gate or Gate “C” and proceed to the project site. Note that all automobiles are subject to a random inspection.
Trucks: All Trucks are to enter NIST via “C” Gate along Quince Orchard Rd. between 6:00 am and 3:30 pm daily, and at the main gate off of W. Diamond Ave. between 3:30 pm and 4:30 pm. No deliveries will be allowed after 4:30 pm. “Trucks” include such vehicles as pick-ups with storage compartments, delivery trucks, delivery vans, and tractor center. Trucks arriving through Gate C will be directed to the Building 301 Truck Inspection Station. At Building 301, trucks will be registered, inspected, and the drivers will be granted access. Any truck which exits the installation will have to be re-inspected upon re-entry at Building 301. A vehicle dashboard placard will be placed within the truck. Placards change daily.
NIST Truck Inspection Stations hours are:
6:00am -3:30pm at Building 301 3:30 pm – 4:30pm at “A” Gate – (Main gate)
Other Unique Requirements
Prospective contractors must be registered in the System for Award Management (SAM).
Place of Performance
The National Institute of Standards and Technology at its main campus located at 100 Bureau Drive, Gaithersburg, Maryland.
Period of Performance
The Period of Performance shall be 365 days from the date of notice to proceed OR until funds are exhausted.
Invoicing
All invoices submitted must include a copy of the certified payroll being invoiced for. Any invoice submitted without certified payroll will automatically be rejected.
Upon submitting the final invoice, the contractor must include a release of claims with the final invoice. A final invoice received without a release of claims statement will be rejected.
Duty Hours
Normal duty hours are 6:00 a.m. to 7:00 p.m. Monday through Friday, excluding Federal holidays. Work outside of the normal duty hours shall be approved by the Contracting Officer and Contracting Officer Representative.
Clean-up
The Contractor shall at all times keep the work area free from accumulations of waste material or rubbish and shall (1) ensure that all waste material and rubbish is removed from the premises for recycle and/or disposed of properly; (2) ensure all equipment, scaffolding, and tools are removed to a designated storage area; and (3)
PAGE 11 OF 75 1333ND24QNB190518
ensure that upon completion of the contract, the work area and premises are left in a clean, organized, and in workmanlike condition, satisfactory to the Government.
Waste Management
In order to reduce disposal volumes of clean scrap wood-based building materials taken to the landfill dump, segregate such materials and dispose of the materials and dispose of the materials using one or a combination of the following methods:
Arrange for recycling of materials or provide to companies that receive wood for disposal in biomass to energy facilities.
It is NIST Policy to recycle construction demolition materials and debris to the greatest extent practicable. NIST’s goal is to recycle at least 50% of construction demolition materials and debris.
Contractor shall store recyclable waste in separate clearly marked containers. Recyclable items include wood, glass, aluminum, steel, gypsum, paper, cardboard, and plastics.
Hazardous Waste
If any chemicals, equipment, or hazardous materials are found in any contract space, the contractor shall notify the COR so arrangements can be made to have the items removed. Work shall not continue until the items have been cleared by others; Contractors are not to move any hazardous chemicals, materials, or equipment.
Key Personnel
Contractor shall identify their Key Personnel on this contract. This shall include the Project Manager, Job Foreman, and Competent Safety Manager.
Quality Assurance and Work Acceptance and Performance
1. Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
2. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
3. Government inspections and tests are for the sole benefit of the Government and do not --
(a) Relieve the Contractor of responsibility for providing adequate quality control measures.
(b) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance; (c) Constitute or imply acceptance; or (d) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
4. The presence or absence of a government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
5. The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in
PAGE 12 OF 75 1333ND24QNB190518
a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
6. If the Contractor does not promptly replace or correct rejected work, the Government may --
(a) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(b) Terminate for default the Contractor’s right to proceed.
7. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
8. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
PAGE 13 OF 75 1333ND24QNB190518
Wage Determination No 2015-4269
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-4269 Daniel W. Simms Division of | Revision No.: 24 Director Wage Determinations| Date Of Last Revision: 12/26/2023
Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
|If the contract is entered into on or |Executive Order 14026 generally applies to | |after January 30, 2022, or the |the contract. | |contract is renewed or extended (e.g., |The contractor must pay all covered workers | |an option is exercised) on or after |at least $17.20 per hour (or the applicable | |January 30, 2022: |wage rate listed on this wage determination,| | |if it is higher) for all hours spent | | |performing on the contract in 2024. | |If the contract was awarded on or |Executive Order 13658 generally applies to | |between January 1, 2015 and January 29,|the contract. | |2022, and the contract is not renewed |The contractor must pay all covered workers | |or extended on or after January 30, |at least $12.90 per hour (or the applicable | |2022: |wage rate listed on this wage determination,| | |if it is higher) for all hours spent | | |performing on the contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
State: Maryland
Area: Maryland Counties of Frederick, Montgomery
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 19.72 01012 - Accounting Clerk II 22.15 01013 - Accounting Clerk III 24.77 01020 - Administrative Assistant 38.21 01035 - Court Reporter 28.71 01041 - Customer Service Representative I 16.73*** 01042 - Customer Service Representative II 18.25 01043 - Customer Service Representative III 20.48 01051 - Data Entry Operator I 17.09*** 01052 - Data Entry Operator II 18.65 01060 - Dispatcher, Motor Vehicle 23.66 01070 - Document Preparation Clerk 19.93 01090 - Duplicating Machine Operator 19.93 01111 - General Clerk I 17.51 01112 - General Clerk II 19.12 01113 - General Clerk III 21.47 01120 - Housing Referral Assistant 26.03 01141 - Messenger Courier 19.79
PAGE 14 OF 75 1333ND24QNB190518
01191 - Order Clerk I 17.71 01192 - Order Clerk II 19.32 01261 - Personnel Assistant (Employment) I 20.17 01262 - Personnel Assistant (Employment) II 22.56 01263 - Personnel Assistant (Employment) III 25.15 01270 - Production Control Clerk 26.81 01290 - Rental Clerk 19.99 01300 - Scheduler, Maintenance 20.87 01311 - Secretary I 20.87 01312 - Secretary II 23.35 01313 - Secretary III 26.03 01320 - Service Order Dispatcher 21.16 01410 - Supply Technician 38.21 01420 - Survey Worker 21.66 01460 - Switchboard Operator/Receptionist 17.45 01531 - Travel Clerk I 20.59 01532 - Travel Clerk II 22.45 01533 - Travel Clerk III 24.24 01611 - Word Processor I 18.62 01612 - Word Processor II 20.92 01613 - Word Processor III 23.39 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 29.42 05010 - Automotive Electrician 26.35 05040 - Automotive Glass Installer 24.82 05070 - Automotive Worker 24.82 05110 - Mobile Equipment Servicer 21.35 05130 - Motor Equipment Metal Mechanic 27.74 05160 - Motor Equipment Metal Worker 24.82 05190 - Motor Vehicle Mechanic 27.74 05220 - Motor Vehicle Mechanic Helper 19.53 05250 - Motor Vehicle Upholstery Worker 23.17 05280 - Motor Vehicle Wrecker 24.82 05310 - Painter, Automotive 26.35 05340 - Radiator Repair Specialist 24.82 05370 - Tire Repairer 17.47 05400 - Transmission Repair Specialist 27.74 07000 - Food Preparation And Service Occupations 07010 - Baker 17.68 07041 - Cook I 18.44 07042 - Cook II 21.44 07070 - Dishwasher 16.05*** 07130 - Food Service Worker 16.20*** 07210 - Meat Cutter 21.58 07260 - Waiter/Waitress 15.53*** 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 25.01 09040 - Furniture Handler 14.06*** 09080 - Furniture Refinisher 22.55 09090 - Furniture Refinisher Helper 16.71*** 09110 - Furniture Repairer, Minor 19.82 09130 - Upholsterer 19.86 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 15.75*** 11060 - Elevator Operator 15.87*** 11090 - Gardener 24.11 11122 - Housekeeping Aide 16.87*** 11150 - Janitor 16.87*** 11210 - Laborer, Grounds Maintenance 18.22 11240 - Maid or Houseman 16.04*** 11260 - Pruner 17.39 11270 - Tractor Operator 22.05 11330 - Trail Maintenance Worker 18.22 11360 - Window Cleaner 17.67 12000 - Health Occupations 12010 - Ambulance Driver 24.09 12011 - Breath Alcohol Technician 26.39
PAGE 15 OF 75 1333ND24QNB190518
12012 - Certified Occupational Therapist Assistant 35.59 12015 - Certified Physical Therapist Assistant 33.33 12020 - Dental Assistant 23.78 12025 - Dental Hygienist 49.34 12030 - EKG Technician 39.45 12035 - Electroneurodiagnostic Technologist 39.45 12040 - Emergency Medical Technician 24.09 12071 - Licensed Practical Nurse I 23.60 12072 - Licensed Practical Nurse II 26.39 12073 - Licensed Practical Nurse III 29.42 12100 - Medical Assistant 20.85 12130 - Medical Laboratory Technician 30.04 12160 - Medical Record Clerk 24.20 12190 - Medical Record Technician 27.06 12195 - Medical Transcriptionist 20.72 12210 - Nuclear Medicine Technologist 43.80 12221 - Nursing Assistant I 14.54*** 12222 - Nursing Assistant II 16.35*** 12223 - Nursing Assistant III 17.84 12224 - Nursing Assistant IV 20.04 12235 - Optical Dispenser 24.41 12236 - Optical Technician 23.99 12250 - Pharmacy Technician 20.24 12280 - Phlebotomist 22.95 12305 - Radiologic Technologist 39.19 12311 - Registered Nurse I 30.40 12312 - Registered Nurse II 36.78 12313 - Registered Nurse II, Specialist 36.78 12314 - Registered Nurse III 44.14 12315 - Registered Nurse III, Anesthetist 44.14 12316 - Registered Nurse IV 52.91 12317 - Scheduler (Drug and Alcohol Testing) 32.71 12320 - Substance Abuse Treatment Counselor 28.96 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 24.30 13012 - Exhibits Specialist II 30.10 13013 - Exhibits Specialist III 36.82 13041 - Illustrator I 24.49 13042 - Illustrator II 30.33 13043 - Illustrator III 37.10 13047 - Librarian 42.46 13050 - Library Aide/Clerk 18.44 13054 - Library Information Technology Systems 38.33 Administrator 13058 - Library Technician 24.07 13061 - Media Specialist I 27.66 13062 - Media Specialist II 30.94 13063 - Media Specialist III 34.50 13071 - Photographer I 20.30 13072 - Photographer II 22.87 13073 - Photographer III 28.64 13074 - Photographer IV 34.67 13075 - Photographer V 41.62 13090 - Technical Order Library Clerk 23.13 13110 - Video Teleconference Technician 30.57 14000 - Information Technology Occupations 14041 - Computer Operator I 25.18 14042 - Computer Operator II 28.19 14043 - Computer Operator III 31.42 14044 - Computer Operator IV 34.89 14045 - Computer Operator V 38.68 14071 - Computer Programmer I (see 1) 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1)
PAGE 16 OF 75 1333ND24QNB190518
14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 25.18 14160 - Personal Computer Support Technician 34.89 14170 - System Support Specialist 40.07 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 38.18 15020 - Aircrew Training Devices Instructor (Rated) 46.20 15030 - Air Crew Training Devices Instructor (Pilot) 55.38 15050 - Computer Based Training Specialist / Instructor 38.18 15060 - Educational Technologist 46.20 15070 - Flight Instructor (Pilot) 55.38 15080 - Graphic Artist 38.26 15085 - Maintenance Test Pilot, Fixed, Jet/Prop 55.38 15086 - Maintenance Test Pilot, Rotary Wing 55.38 15088 - Non-Maintenance Test/Co-Pilot 55.38 15090 - Technical Instructor 32.11 15095 - Technical Instructor/Course Developer 39.27 15110 - Test Proctor 25.91 15120 - Tutor 25.91 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 18.47 16030 - Counter Attendant 18.47 16040 - Dry Cleaner 21.11 16070 - Finisher, Flatwork, Machine 18.47 16090 - Presser, Hand 18.47 16110 - Presser, Machine, Drycleaning 18.47 16130 - Presser, Machine, Shirts 18.47 16160 - Presser, Machine, Wearing Apparel, Laundry 18.47 16190 - Sewing Machine Operator 21.99 16220 - Tailor 22.87 16250 - Washer, Machine 19.35 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 29.55 19040 - Tool And Die Maker 35.89 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 22.38 21030 - Material Coordinator 26.81 21040 - Material Expediter 26.81 21050 - Material Handling Laborer 17.58 21071 - Order Filler 16.95*** 21080 - Production Line Worker (Food Processing) 22.38 21110 - Shipping Packer 18.17 21130 - Shipping/Receiving Clerk 18.17 21140 - Store Worker I 17.59 21150 - Stock Clerk 21.28 21210 - Tools And Parts Attendant 22.38 21410 - Warehouse Specialist 22.38 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 41.02 23019 - Aircraft Logs and Records Technician 32.52 23021 - Aircraft Mechanic I 38.95 23022 - Aircraft Mechanic II 41.02 23023 - Aircraft Mechanic III 43.02 23040 - Aircraft Mechanic Helper 27.42 23050 - Aircraft, Painter 36.99 23060 - Aircraft Servicer 32.52 23070 - Aircraft Survival Flight Equipment Technician 36.99 23080 - Aircraft Worker 34.84 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 34.84 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 38.95
II
23110 - Appliance Mechanic 23.90 23120 - Bicycle Repairer 19.21 23125 - Cable Splicer 37.49 23130 - Carpenter, Maintenance 27.50 23140 - Carpet Layer 22.54
PAGE 17 OF 75 1333ND24QNB190518
23160 - Electrician, Maintenance 30.37 23181 - Electronics Technician Maintenance I 34.31 23182 - Electronics Technician Maintenance II 36.43 23183 - Electronics Technician Maintenance III 38.36 23260 - Fabric Worker 26.61 23290 - Fire Alarm System Mechanic 29.84 23310 - Fire Extinguisher Repairer 24.53 23311 - Fuel Distribution System Mechanic 37.07 23312 - Fuel Distribution System Operator 28.53 23370 - General Maintenance Worker 23.61 23380 - Ground Support Equipment Mechanic 38.95 23381 - Ground Support Equipment Servicer 32.52 23382 - Ground Support Equipment Worker 34.84 23391 - Gunsmith I 24.53 23392 - Gunsmith II 28.51 23393 - Gunsmith III 31.87 23410 - Heating, Ventilation And Air-Conditioning 30.17 Mechanic 23411 - Heating, Ventilation And Air Contidioning 31.78 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 29.69 23440 - Heavy Equipment Operator 27.40 23460 - Instrument Mechanic 31.82 23465 - Laboratory/Shelter Mechanic 30.27 23470 - Laborer 17.83 23510 - Locksmith 29.15 23530 - Machinery Maintenance Mechanic 30.29 23550 - Machinist, Maintenance 31.20 23580 - Maintenance Trades Helper 18.27 23591 - Metrology Technician I 31.82 23592 - Metrology Technician II 33.51 23593 - Metrology Technician III 35.15 23640 - Millwright 29.89 23710 - Office Appliance Repairer 22.96 23760 - Painter, Maintenance 22.76 23790 - Pipefitter, Maintenance 31.30 23810 - Plumber, Maintenance 29.73 23820 - Pneudraulic Systems Mechanic 31.87 23850 - Rigger 30.45 23870 - Scale Mechanic 28.51 23890 - Sheet-Metal Worker, Maintenance 29.06 23910 - Small Engine Mechanic 24.79 23931 - Telecommunications Mechanic I 37.06 23932 - Telecommunications Mechanic II 39.03 23950 - Telephone Lineman 39.78 23960 - Welder, Combination, Maintenance 27.58 23965 - Well Driller 28.79 23970 - Woodcraft Worker 31.87 23980 - Woodworker 24.53 24000 - Personal Needs Occupations 24550 - Case Manager 20.75 24570 - Child Care Attendant 16.47*** 24580 - Child Care Center Clerk 20.53 24610 - Chore Aide 15.60*** 24620 - Family Readiness And Support Services 20.75 Coordinator 24630 - Homemaker 20.75 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 38.36 25040 - Sewage Plant Operator 28.60 25070 - Stationary Engineer 38.36 25190 - Ventilation Equipment Tender 27.00 25210 - Water Treatment Plant Operator 28.60 27000 - Protective Service Occupations 27004 - Alarm Monitor 24.90 27007 - Baggage Inspector 19.39 27008 - Corrections Officer 29.35
PAGE 18 OF 75 1333ND24QNB190518
27010 - Court Security Officer 30.33 27030 - Detection Dog Handler 21.69 27040 - Detention Officer 29.35 27070 - Firefighter 31.96 27101 - Guard I 19.39 27102 - Guard II 21.69 27131 - Police Officer I 33.25 27132 - Police Officer II 36.96 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 18.60 28042 - Carnival Equipment Repairer 20.33 28043 - Carnival Worker 14.23*** 28210 - Gate Attendant/Gate Tender 18.52 28310 - Lifeguard 13.98*** 28350 - Park Attendant (Aide) 20.72 28510 - Recreation Aide/Health Facility Attendant 15.14*** 28515 - Recreation Specialist 25.67 28630 - Sports Official 16.50*** 28690 - Swimming Pool Operator 23.63 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 35.06 29020 - Hatch Tender 35.06 29030 - Line Handler 35.06 29041 - Stevedore I 32.73 29042 - Stevedore II 37.23 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 48.97 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 33.77 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 37.19 30021 - Archeological Technician I 20.86 30022 - Archeological Technician II 23.34 30023 - Archeological Technician III 28.90 30030 - Cartographic Technician 28.90 30040 - Civil Engineering Technician 34.36 30051 - Cryogenic Technician I 32.01 30052 - Cryogenic Technician II 35.36 30061 - Drafter/CAD Operator I 20.86 30062 - Drafter/CAD Operator II 23.34 30063 - Drafter/CAD Operator III 26.01 30064 - Drafter/CAD Operator IV 32.01 30081 - Engineering Technician I 22.92 30082 - Engineering Technician II 25.72 30083 - Engineering Technician III 28.79 30084 - Engineering Technician IV 35.64 30085 - Engineering Technician V 43.61 30086 - Engineering Technician VI 52.76 30090 - Environmental Technician 28.90 30095 - Evidence Control Specialist 28.90 30210 - Laboratory Technician 28.21 30221 - Latent Fingerprint Technician I 37.63 30222 - Latent Fingerprint Technician II 41.56 30240 - Mathematical Technician 35.01 30361 - Paralegal/Legal Assistant I 24.57 30362 - Paralegal/Legal Assistant II 30.45 30363 - Paralegal/Legal Assistant III 37.23 30364 - Paralegal/Legal Assistant IV 45.04 30375 - Petroleum Supply Specialist 35.36 30390 - Photo-Optics Technician 28.90 30395 - Radiation Control Technician 35.36 30461 - Technical Writer I 31.20 30462 - Technical Writer II 38.15 30463 - Technical Writer III 46.16 30491 - Unexploded Ordnance (UXO) Technician I 31.12 30492 - Unexploded Ordnance (UXO) Technician II 37.66 30493 - Unexploded Ordnance (UXO) Technician III 45.14 30494 - Unexploded (UXO) Safety Escort 31.12 30495 - Unexploded (UXO) Sweep Personnel 31.12
PAGE 19 OF 75 1333ND24QNB190518
30501 - Weather Forecaster I 32.01 30502 - Weather Forecaster II 38.93 30620 - Weather Observer, Combined Upper Air Or (see 2) 26.01 Surface Programs 30621 - Weather Observer, Senior (see 2) 28.90 31000 - Transportation/Mobile Equipment Operation Occupations 31010 - Airplane Pilot 37.66 31020 - Bus Aide 16.66*** 31030 - Bus Driver 23.92 31043 - Driver Courier 20.34 31260 - Parking and Lot Attendant 16.01*** 31290 - Shuttle Bus Driver 19.93 31310 - Taxi Driver 17.71 31361 - Truckdriver, Light 22.24 31362 - Truckdriver, Medium 24.14 31363 - Truckdriver, Heavy 26.16 31364 - Truckdriver, Tractor-Trailer 26.16 99000 - Miscellaneous Occupations 99020 - Cabin Safety Specialist 18.36 99030 - Cashier 14.39*** 99050 - Desk Clerk 15.36*** 99095 - Embalmer 31.73 99130 - Flight Follower 31.12 99251 - Laboratory Animal Caretaker I 17.93 99252 - Laboratory Animal Caretaker II 19.60 99260 - Marketing Analyst 37.98 99310 - Mortician 31.73 99410 - Pest Controller 21.91 99510 - Photofinishing Worker 20.52 99710 - Recycling Laborer 22.98 99711 - Recycling Specialist 28.16 99730 - Refuse Collector 20.95 99810 - Sales Clerk 15.66*** 99820 - School Crossing Guard 17.81 99830 - Survey Party Chief 30.97 99831 - Surveying Aide 19.25 99832 - Surveying Technician 29.45 99840 - Vending Machine Attendant 15.87*** 99841 - Vending Machine Repairer 20.60 99842 - Vending Machine Repairer Helper 15.87***
***Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20 per hour) or 13658 ($12.90 per hour). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 and 13658 are not currently being enforced as to contracts or contract-like instruments entered into with the federal government in connection with seasonal recreational services or seasonal recreational equipment rental for the general public on federal lands. The minimum wage requirements of Executive Order 14026 also are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors, applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is the victim of, domestic violence, sexual assault, or
PAGE 20 OF 75 1333ND24QNB190518
stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.98 per hour, up to 40 hours per week, or $199.20 per week or $863.20 per month
HEALTH & WELFARE EO 13706: $4.57 per hour, up to 40 hours per week, or $182.80 per week, or $792.13 per month*
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706, Establishing Paid Sick Leave for Federal Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor, 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of eleven paid holidays per year: New Year's Day, Martin Luther King Jr.'s Birthday, Washington's Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .