1333ND24QNB190518 A002 FormSF30.pdf
PDF 1 MB Posted
- Attached to
- BR193-45 Window Requirement Federal contract opportunity
- Solicitation number
- 1333ND24QNB190518
About this file
This document is an Amendment to Solicitation 1333ND24QNB190518, also known as the BR193-45 Window Requirement. It provides clarifications and updates to the solicitation, including:
The solicitation is for window resealing services at several NIST facilities, including Buildings 220, 221, 224, 225, and 226. The amendment clarifies which specific buildings and rooms require the work, as well as the number of window stacks to be resealed under Task 1. It also removes certain requirements related to renewable energy certificates that do not apply to this solicitation. The amendment addresses questions from offerors regarding the scope of work, pricing, and the need for an additional site visit. It provides the wage scale for Glaziers and specifies the information required for the Past Performance evaluation factor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1333ND24QNB190518A003 A003 FormSF30.pdf | ||
| 1333ND24QNB190518 BR193-45 Window Requirement FormSF1449.pdf | ||
| 1333ND24QNB190518 A0001 Page 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Continuation Page
Continued from Block 14...
Please see attached Instructions to Quoters.docx (originally on RFP on page 73 remove context language reference question #5), Occupational Employment and Wage Statistics for wage scale for Glaziers and RFP-PD- 1333ND24QNB190518 Q&A RFP.pdf on page 73
5. Response: Yes, (see attached) those items do not apply to this requirement and will be removed, along with the last sentence in paragraph 1. Experience.
The following has been removed "
1. The quoter shall identify list the details of the renewable energy certificate, including:
a. RECs 11,000 megawatt-hours (MWh) are provided.
b. Date the RECs were produced were between April 1, 2023, to Jan 1, 2024
c. Date the REC facility that produced the electricity became operational was AFTER October 1, 2021
d. REC type of resources that generated electricity. "
PAGE 2 OF 9 1333ND24QNB190518A002
Table of Contents
Instructions to Quoters revised
Occupational Employment and Wage Statistics Glazi
RFP# 1333ND24QNB190518 Q&A RFP
PAGE 3 OF 9 1333ND24QNB190518A002
CLAUSES
Instructions to Quoters revised
PAGE 4 OF 9 1333ND24QNB190518A002
Instructions to Quoters
Quotes shall be prepared on standard 8-1/2” by 11” paper, single-spaced at 1 with spacing before and after paragraphs set at –0– and left aligned paragraphs. Pages shall have a one-inch margin. The font shall be Times New Roman with a font size of 12 throughout the document. The Technical Quotation shall not contain any reference to price. Quotes should be written so that government personnel evaluating the quote can arrive at a sound determination as to whether the quote meets the requirements of this solicitation. The Quoter’s company name, the solicitation number and the date of the quote shall appear at the top of each page.
Quotes shall be submitted electronically to the contract specialist via email within the response date established.
Technical Quotation
(A) General
(1) The technical quotation must clearly indicate your company's capabilities and the means that will be used to satisfy the requirements of the Statement of Work. The technical quotation must be written in plain language, be straightforward and concise, yet sufficiently detailed to address all areas below, necessary to evaluate the quotation in accordance with the evaluation criteria.
(2) In order that the technical quotation may be evaluated strictly on the merit of the material submitted, no price information shall be included in the technical quotation.
(3) Repeating the scope/statement of work and/or listing capabilities without sufficient elaboration will not be acceptable.
(4) The quotation must not exceed 20 pages, single spaced, exclusive of submissions for experience and past performance evaluation factors.
The quoter’s technical quotation shall include the following:
1. Experience: Quoter shall provide sufficient information that demonstrates the quoter's knowledge and experience in successfully performing similar projects in scope. Submit a listing of up to five (5) references of similar scope, magnitude, and complexity of the requirement.
2. Past Performance: The past performance evaluation factor assesses the degree of confidence the Government has in a Quoter’s ability to supply products and services that meet users’ needs, based on a demonstrated record of performance.
The quote shall list up to five (5) relevant contracts performed within the last 3 years, including Federal, State and Local Government and private sector contracts.
For evaluation of Past Performance, the Government may use information from any sources available to it including, but not limited to, CPARS and FAPIIS. The Government may review relevant past performance information from other
PAGE 5 OF 9 1333ND24QNB190518A002
sources or through the use of questionnaires. Quoters should provide relevant past performance information for similar or related work that has taken place during the last three years. Each Quoter has the opportunity to provide in its quote any information regarding its past performance of contracts similar to the Government's requirement that it would like the Government to consider. This includes information that the Quoter considers essential to the Government's evaluation or explanatory information of poor performance.
Quoters should provide the following information:
1. Contract Number
2. Customer/Agency
3. Contracting Officer /Technical Point of Contact/POC (names and telephone numbers)
4. Brief description of the scope of work
5. Award Price
6. Period of Performance
To obtain information, the Government may contact the points of contact listed, however, the Government is not required to do so. The Government may contact references other than those provided by the Quoter to evaluate past performance.
Quoter’s shall ensure that all references and their contact information is current and correct prior to quoting the references in the quote.
If the quoter has no relevant past performance, it should include a statement to that effect in its quote. The government reserves the right to consider data obtained from sources other than those described by the quoter in its quote.
PRICE QUOTATION
The quoter shall provide a total firm, fixed price for all line items for the completion of the services described herein. The quoter shall provide documentation to support the quoted price to include a price breakdown.
The Government anticipates competition under this solicitation. However, in order to determine the prices are fair and reasonable, the Government reserves the right to request the quoter provide further breakdown to support quoted prices.
Occupational Employment and Wage Statistics Glazi
PAGE 6 OF 9 1333ND24QNB190518A002
Occupational Employment and Wage Statistics Query System OEWS
Back to Inputs
Occupational Employment and Wage Statistics
One occupation for multiple geographical areas
Occupation: Glaziers(SOC code 472121) Period: May 2023
Area name Employment(1)
Employment percent relative standard error(3)
Hourly mean wage
Annual mean wage(2)
Wage percent relative standard error(3)
Hourly 10th percentile wage
Hourly 25th percentile wage
Hourly median wage
Hourly 75th percentile wage
Hourly 90th percentile wage
Annual 10th percentile wage(2)
Annual 25th percentile wage(2)
Annual median wage(2)
Annual 75th percentile wage(2)
Annual 90th percentile wage(2)
Employment per 1,000 jobs Location Quotient
Maryland(2400000) 1030 16.1 29.43 61210 4.0 21.53 24.45 28.86 30.84 37.15 44780 50860 60030 64140 77270 0.383 1.09
Footnotes:
(1) Estimates for detailed occupations do not sum to the totals because the totals include occupations not shown separately. Estimates do not include self-employed workers.
(2) Annual wages have been calculated by multiplying the corresponding hourly wage by 2,080 hours.
(3) The relative standard error (RSE) is a measure of the reliability of a survey statistic. The smaller the relative standard error, the more precise the estimate.
SOC code: Standard Occupational Classification code -- see http://www.bls.gov/soc/home.htm
Data extracted on September 02, 2024
U.S. BUREAU OF LABOR STATISTICS
(For more information or help)
U.S. BUREAU OF LABOR STATISTICS Division of Occupational Employment and Wage Statistics PSB Suite 2135 2 Massachusetts Avenue NE Washington, DC 20212-
Telephone:1-202-691-6569 www.bls.gov/OES Contact OEWS
RFP# 1333ND24QNB190518 Q&A RFP
PAGE 7 OF 9 1333ND24QNB190518A002
RFP#: 1333ND24QNB190518
BR193-45 Window Requirements Contract Date: 8/29/2024
Subject: RFI Responses to Perfect Glassworks
1. Task 1, Building 221. Please specify which windows and which rooms the reseal has to be done. Based on the site visit there were some windows already resealed by NIST workers. Response: The NIST Construction Shop resealed numerous windows prior to this site visit. Please see revised Statement of Work for correct rooms.
2. At building 221. Please confirm the windows stack quantity is 12. Response: Correct, there are twelve (12) window stacks to reseal as part of Task 1.
3. Task 1 listed buildings 220,221,224,225 and 226. Based on the site visit we only reviewed buildings 225,227,221 and 101. Please clarify the buildings numbers.
Response: The NIST Construction Shop resealed numerous windows prior to this site visit. Please see revised Statement of Work for correct buildings and room numbers.
4. Instruction to Quoters paragraph (3) comment regarding repeating the scope statement.
All the work for 4 task is similar at all 4 buildings and the proposal will repeat exact same wording. Could you please remove that requirement? (page 73 in RFP) Response: This statement means that copying the scope from the Statement of Work and only submitting that as your technical proposal will not be acceptable. This statement will not be removed, but please note it doesn’t mean your proposal can’t contain the same scope statement for any of the tasks, including Task 4.
5. Response: Yes, (see attached) those items do not apply to this requirement and will be removed, along with the last sentence in paragraph 1. Experience.
The following has been removed "
1. The quoter shall identify list the details of the renewable energy certificate, including:
a. RECs 11,000 megawatt-hours (MWh) are provided.
b. Date the RECs were produced were between April 1, 2023, to Jan 1, 2024
c. Date the REC facility that produced the electricity became operational was AFTER October 1, 2021
d. REC type of resources that generated electricity. "
6. Please confirm that the unit price required only for task 4 for the future work. Response:
Confirmed. Task 4 is unit pricing only required for future work.
7. Unit price won’t be accurate due to equipment involved for this type of work. Would you like to get a price without the equipment or with equipment? Response: The unit price shall include equipment.
8. The United Rentals representative has requested a site visit to determine the appropriate equipment. Is it possible to schedule another site visit for the equipment rental person?
Response: Yes, please set up for 8/30 or 9/3.
9. Please provide wage scale for Glaziers. See attached
10. Please provide the contract number (per proposal requirements) page 74 RFP Response:
This paragraph, on page 74, that asks for the contract number applies to any Government projects you submit for Past Performance. You will need to include the Contract Number for Government projects that you worked on.
PAGE 8 OF 9 1333ND24QNB190518A002
11. Please provide all POCs which should be listed in the proposal (per proposal requirements) page 74 RFP. Contracting office name /Technical Point of Contact Response: This paragraph, on page 74, that asks for the Contracting officer’s name /Technical Point of Contact, applies to any Government projects you submit for Past Performance. You will need to include these items for those projects you worked on.
12. Please provide customer agency name (per proposal requirements) page 74 RFP Response: This paragraph, on page 74, that asks for the Customer/Agency name, applies to any Government projects you submit for Past Performance. You will need to include this information for those projects you worked on.
PAGE 9 OF 9 1333ND24QNB190518A002
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable Descript: 1333ND24QNB190518A002| BR193-45 Window Requirement/Q&A and Updates
The following documents have been here-by Amended or added.
...See Continuation Page
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 9 |
| DocNo: 1333ND24QNB190518A002 |
| EffDate: SEP 02, 2024 |
| ReqNo: NB193000-24-02116 |
| ProjNo: Q&A and updates |
| IssuedByCode: 000SB |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolNo: 1333ND24QNB190518 |
| SolDate: AUG 20, 2024 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| 15B. CONTRACTOR/OFFEROR: |
| signature: |
| AwdChg: Off |
| SolChg: Yes |
| Header: |
| Footer1: |
File details come from the government source that posted it. Updated .