HB_SOW_-_SSDG_Exh_Lagging_Repair.pdf

PDF 126 KB Posted

Attached to
The NOAA Ship Henry Bigelow requires replacement o
Solicitation number
1333MK25Q0015
Issued by

About this file

This document is a Statement of Work for repairs to the exhaust insulation lagging on the four Slow Speed Diesel Generators (SSDGs) onboard the NOAA Ship Henry Bigelow. The work is required to be performed while the ship is docked at Naval Station Newport, Pier 2 in Newport, RI from November 18, 2024 to January 17, 2025. The contractor will be responsible for furnishing, delivering, and installing replacement insulation lagging using 2-inch thick blankets with two layers of 1-inch thick 10-pound Texo HTM Mat insulation with a Teflon coated fiberglass cloth outer jacket and 0.008-inch stainless steel mesh inner. The Chief Engineer will inspect the work upon completion prior to acceptance. The federal contract opportunity associated with this Statement of Work has the Solicitation Number 1333MK25Q0015, and is being procured by the National Oceanic and Atmospheric Administration, a civilian agency within the Department of Commerce.

View the file

Other files

File Type Posted
Sol_1333MK25Q0015_Amd_0001.pdf PDF
015_Combined_Synopsis_Solicitation_(1).pdf PDF
Sol_1333MK25Q0015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

SSDG Exhaust Insulation Repairs NOAA Ship Henry Bigelow – NOV 2024

Page | 1

1. Scope

1.1. The NOAA Ship Henry Bigelow requires repairs to

sections of the SSDG exhaust insulation for the (4) SSDGs as the lagging is deteriorating and needs to be replaced.

2. References

2.1. SSDG TC Exhaust Lagging Pictures

3. Government Furnished Material

3.1. None

4. Requirements

4.1. Provide all materials, labor, tools, coordination, and

transportation to complete the following while alongside Pier 2:

4.1.1. Contractor to furnish, deliver, and install

replacement insulation lagging for deteriorated insulation lagging on (4) SSDGs exhaust turbochargers and associated exhaust inlet and outlet pipes (approximately 6 to 8 ft per SSDG) using 2” thick blankets with 2 layers of 1” thick 10# Texo HTM Mat insulation with Teflon coated fiberglass cloth outer jacket and 0.008 SS mesh inner using SS staples, SS lacing hooks, and SS wire to assembly and install. See reference 2.1 for currently installed lagging.

4.2. Chief Engineer to inspect after installation of new

lagging prior to acceptance of work completion.

5. Key Performance Milestone Dates (no later than these dates):

5.1. 18 NOV 2024 to 17 JAN 2025

6. Quality assurance

6.1. Chief Engineer inspection

7. Notes

7.1. The ship is scheduled to be located at the following

address while inport Newport, RI and for the Dockside Repair Period starting 18 NOV 2024:

NOAA Ship Henry B. Bigelow

STATEMENT OF WORK

SSDG Exhaust Insulation Repairs NOAA Ship Henry Bigelow – NOV 2024

Page | 2

Naval Station Newport – Pier 2 47 Chandler Street Newport, RI 02841

Attn: Chief Engineer

END OF STATEMENT OF WORK