HARVEST1_GPS_2025_Redacted_0001.pdf

PDF 210 KB Posted

Attached to
Vessel Charter - Buoy Recovery and Deployment
Solicitation number
1333MJ27Q0001
Issued by

About this file

This is a technical schematic diagram for an oceanographic mooring system deployed at a depth of 300 meters off the coast of Harvest, California. The mooring is designated HARVEST1 GPS 2025 and was drawn by NOAA-PMEL-EDD on March 24, 2025.

The system consists of a surface buoy equipped with GPS antenna, GPS backup beacon, and amber flashing light, anchored by a 1-meter sea anchor that must be removed after deployment. The buoy is connected via a 20-meter 9/16" copolymer line (doubled for floats) to a non-rotating load cell. Below the load cell, the system employs a 3-meter 1" chain, followed by multiple sections of stainless steel cable (SAS) and chain of varying sizes, connected through 5-ton and 3-ton swivels and nylotron thimbles and boots to reduce tangling. The main vertical line consists of 285 meters of D3/ED jacketed line with sharkbite connectors. At the bottom, the system terminates with a 3400# anchor at dry weight and 1900# anchor at wet weight. The entire configuration includes an 8242 acoustic release mechanism to enable recovery. All shackles throughout the system require wrench tightening, and the schematic indicates a 1.30:1 scope ratio for the mooring.

View the file

Other files

File Type Posted
Sol_1333MJ27Q0001_Amd_0001.pdf PDF
Sol_1333MJ27Q0001.pdf PDF
Statement_of_Work.pdf PDF
Wage_Determination_No_2015-5647.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .