Questions and Answers 1 1333MF26Q0105 _26-488.pdf
PDF 252 KB Posted
- Solicitation number
- 1333MF26Q0105
About this file
This is a Questions and Answers document for federal contract opportunity 1333MF26Q0105 (23-488) for fire control monitoring and inspection services issued by NOAA.
The contract scope encompasses fire alarm system monitoring and inspection services across multiple NOAA buildings (301, 302, 303, 305, 306, 307, and MA), along with new fire alarm installations for the Boat Barn, Turtle Barn, Wet Lab, and Turtle Hospital. Existing infrastructure includes seven fire alarm control panels using Honeywell SK-5208 and MS-9050UD models with varying quantities of smoke detectors (2-11 per building), pull stations (2-8 per building), and notification appliances. The contract requires inspection and servicing of 35 portable ABC fire extinguishers (models A411 and B456) across multiple locations, maintenance of backflow prevention devices with detailed inventory provided, and replacement of all sealed lead acid batteries (14 total units across buildings) upon contract award. The contractor must also install new fire alarm systems in four additional facilities with specified preliminary device quantities. A mandatory site visit is scheduled for Tuesday, September 8, 2026, at 10:00 AM CST at Building 307, requiring advance confirmation with Michael.Cordova@noaa.gov. Prospective attendees may not pose questions during the visit but must submit inquiries to Contracting Officer Suzanne.Johnston@noaa.gov by 10:00 AM CST on September 9, 2026. The document clarifies that technicians performing on-site work must possess required certifications and qualifications regardless of employment status (prime contractor or subcontractor), though prime contractors not physically present do not require such certifications if qualified subcontractors perform the work. Corrective repairs and replacement parts identified during inspections are included in the firm-fixed-price CLINs and must be bid accordingly.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers 1333MF26Q0105 (23-488)
Fire control monitoring and inspection services Here is the SOW
2. Site Visit: Please provide date, time, meeting location and any additional instructions for attendees
A single site visit is scheduled for Tuesday September 8, 2026 at 10am CST.
Prospective site visit attendees need to contact Michael.Cordova@noaa.gov to confirm attendance prior to arrival. This will be the only site visit planned.
Meet in building 307. The site tour will begin promptly at 10:00am CST and should be less than 60 minutes long. Late arrivals will be turned away.
Prospective attendees shall not ask any questions during the site visit, but should capture all questions and email them to the Contracting Officer, Suzanne.Johnston@noaa.gov, by 10am CST 9/9/2026. Questions received after this time can not be answered. Q&A will be posted as an Amendment to the solicitation.
Vendors should monitor SAM.gov for any updates.
3. Subcontractor Qualifications: May the prime contractor rely upon the experience, NICET certifications, manufacturer authorizations, licenses, and past performance of a proposed qualified subcontractor or teaming partner to satisfy the technical qualification requirements of the solicitation?
- Technicians present on site (whether employed by the prime contractor or a subcontractor) who perform repair, removal, or replacement work must possess all relevant technical qualifications and certifications. Prime contractors who are not physically on site do not need to hold these certifications, provided that the subcontractors or technicians performing the work on site are fully certified.
https://docs.google.com/document/d/1J-7lChl9a4k6mNRQ6URtkypl7-HpZ-17III56QCfKoQ/edit?tab=t.0 mailto:Suzanne.Johnston@noaa.gov http://sam.gov
4. Existing Fire Alarm System Inventory: Can NOAA provide the manufacturer and model of the existing fire alarm control panels, along with an inventory or approximate device quantities for each applicable building, including smoke detectors, heat detectors, pull stations, notification appliances, modules, and other associated devices?
302 303 305 306 MA 301 307
Model: Honeywell
SK-5208
MS-9050U
D
MS-9050U
D
Series
MS-9050U
D
MS-9050U
D
MS-9050U
D
Panel
QTY:
1 1 1 1 1 1 1
Smoke Detectors
4 6 2 2 11 5 3
Pull Stations
3 3 2 8 5 2 2
Notificati on Applianc es (Horns/ Speakers
4 11 2 horns 5 strobes
9 horns and strobes
9 horns and strobes
2 horns 6 strobes
2 horns 9 strobes
5. Fire Extinguisher Inventory: Can NOAA provide the current quantity, type, size, location, and available service or hydrostatic testing information for the portable fire extinguishers covered under the contract?
- Quantity: 35 total
- Type: ABC
- Size/Model: A411 and B456
- Locations:
301 302 303 305 306 MA Boat Barn
Turtle Barn
WetL ab
Turtle Hosp.
Main 1st & Main Main 1st & By all By all Main By all By all
Entr. 2nd Floor
Entr. Entr. 2nd Floor
Door areas
Door areas
Entra nce door areas door areas
6. Backflow Prevention Devices: Please provide the number, size, type, and location of the backflow prevention assemblies included within the scope of work.
7. New Fire Alarm Installations: Are floor plans, existing fire alarm drawings, square footage information, or preliminary device quantities available for the Boat Barn, Turtle Barn, Wet Lab, and Turtle Hospital to assist contractors in pricing the required new installations?
- Boat Barn: Pull Handle=3, Strobe/Horn=3, Control Panel=1
- Turtle Barn: Pull Handle=2, Strobe/Horn=3, Control Panel=1
- WetLab: Pull Handle=5, Strobe/Horn=8, Control Panel=1
- Turtle Barn: Pull Handle=3, Strobe/Horn=3, Control Panel=1
8. Manufacturer Authorization: Please identify the specific manufacturer authorization documentation required with the quotation and confirm whether authorization held by the prime contractor’s qualified subcontractor will satisfy this requirement.
- Technicians present on site (whether employed by the prime contractor or a subcontractor) who perform repair, removal, or replacement work must possess all relevant technical qualifications and certifications. Prime contractors who are not physically on site do not need to hold these certifications, provided that the subcontractors or technicians performing the work on site are fully certified.
9. Corrective Repairs and Replacement Parts: Are corrective repairs, replacement parts, and equipment replacements identified during inspections intended to be included within the firm-fixed-price CLINs, or will such repairs be separately quoted and authorized by NOAA after deficiencies are identified?
Yes included in the bid.
10. Fire Alarm Batteries: The Statement of Work requires replacement of all batteries upon contract award. Can NOAA provide the quantity, type, voltage, amp-hour rating, and location of the batteries currently installed?
301 302 303 305 306 307 MA
Quantity: 2 2 2 2 2 2 2
Type: Sealed Lead Acid battery
Sealed Lead Acid battery
Sealed Lead Acid battery
Sealed Lead Acid battery
Sealed Lead Acid battery
Sealed Lead Acid battery
Sealed Lead Acid battery
Voltage 12 12 12 12 12 12 12 amp-hour 8.0 AH 8.0 AH 7.0 AH 7.0 AH 8.0 AH 7.0 AH 7.0 AH
Location: By Front Door of bldg
1st Floor in Elevator Control Room center of East Wing
By Rear Door of bldg
By Front Door of bldg
1st Floor Center in mechanical Room East Wing
Rear Door of Bldg
By Front Door of bldg
11. Site Visit: Has the date and time for the single site visit been established? If so, please provide the scheduled date, time, and any attendance or access requirements
A single site visit is scheduled for Tuesday September 8, 2026 at 10 am CST.
Prospective site visit attendees need to contact Michael.Cordova@noaa.gov to confirm attendance prior to arrival. This will be the only site visit planned.
Meet in building 307.
The site tour will begin promptly at 10:00am CST and should be less than 60 minutes long. Late arrivals will be turned away.
Prospective attendees shall not ask any questions during the site visit, but should capture all questions and email them to the Contracting Officer, Suzanne.Johnston@noaa.gov, by 10am CST 9/9/2026. Questions received after this time can not be answered. Q&A will be posted as an Amendment to the solicitation.
Vendors should monitor SAM.gov for any updates.