This document contains questions and answers regarding a solicitation for library cataloging services. The solicitation is seeking cataloging services for the Department of Commerce library, including tasks such as catalog record creation and correction, report generation and error checking, and interaction with library staff. The period of performance is one base year with four option years, and labor hours may not exceed 2000 hours per option period. The solicitation is set aside for women-owned small businesses. No incumbent contractor information is provided.

View the file

Other files

File Type Posted
RFQ-Library Services.docx DOCX document
Attachment C Price Schedule Template_Library Cataloging.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NoQuestionResponse
1Is this solicitation for 1 FTE or more than 1?It is up to the Offeror to propose the labor mix they deem adequate to accomplish the tasks as set forth in the SOW.
2Is the max number of hours per 12 months 2000 hours?Labor hours may not exceed 2000 hours per option period in accordance with the SOW.
3Is there an incumbent currently performing these services?This is solicitation for a new contract. Information on an incumbent contractor, if one exists, will not be released as it is not relevant.
4What is the currently contract value?See answer to question 3
5What is the current level of effort (personnel working).See answer to question 3
6At the bottom of page 3 it states that the "Quote must include a completed copy of the provision at 52.213-3, Offeror Representations and Certifications-Commercial Items, with the offer."Is that a form that is to be completed?There is not a form, but you can find the clause through the acquisition.gov site.
7If so, is there a link to it?See answer to question 6
8If there is a form to be completed, is it to be part of Section 1, Technical Quote; Section 2, Past Performance Quote; Section 3, Price Quote; or as a separate file?Please include in Section 3. Price Quote
9Page 13 has Attachment B. Is this to be filled out and returned as part of the Price quote file?Attachment B should be filled out and included in the Price Volume.
10Page 6: ' 5.0, Clauses applicable to this solicitation", regarding the provision at 52.212-1,
Am I to fill in Standard Form 1449?You are not required to fill in the SF1449, but may choose to do so.
11If I am to fill in the form, is it sent separately or as part of Section 1, Section 2, or Section 3?If you choose to do so, it would be part of the Price Volume.
12For the past performance is there a questionnaire that I should send to the contact person regarding past performance?
Is listing their name and contact information all that I need to do?The Offeror does not need to send out a survey. The government may choose to send out a survey to the points of contact for the contracts listed in the past performance volume.
13Can you please advise if there is an incumbent in place for the RFQ - Library Cataloging Services?See answer to question 3
14Is this a current position or a new position? If it is new, is it brand new or is it replacing someone who is leaving or consolidating work that is being done by multiple people currently?See answer to question 3
15The RFQ states: The Library frequently has projects, such as a much-needed digitization project to make unique Commerce documents from the DOC Archives readily available to DOC staff, regardless of location, that have the potential to increase the known minimum of labor hours per week that are funded in the base year. Does this mean the contractor may have to work overtime?no - the contractor shall not work more than 40 hours a week, maximum, but does offer flexibility within business hours (working fewer hours every day vs 3 full days a week, etc). The current requirement does not support 40 hours a week for the full 12-month contract period, however, if there is a need for additional cataloging hours to accommodate either the regular daily work or as a result of the digitization project, the library may choose to increase contract hours at that time (still not to exceed 40 hours a week).
16How many staff work at the library and in what capacities?This is not relevant to the requirement.
17What position does the COR hold at the library?This is not relevant to the requirement.
18Is this position directed solely by the COR, or will the contractor also receive direction and assignments from other DOC employees? If so, whom?The COR monitors and surveills. Direction and supervision should be done by the vendor based on the deliverables in the contract. However, it is not unusual for library staff to make requests that fall within the scope of the contract - such as when they notice a problem with a catalog record or to alert the contractor an event record needs to be created. The COR and Acting Library Director may offer minimal assistance when it comes to the preferred prioritization of tasks, but the contractor generally must be able to perform tasks outlined in the requirements with little direction from library staff.
19Will the contractor be responsible for doing a complete evaluation of the collection to determine items that need preservation or is this a peripheral duty accomplished during the course of other work?the majority of the collection was assessed during an inventory project prior to migrating to a new catalog (2016-2017), and since then staff have worked to deaccession and update most of the collections - identifying items for preservation during the course of other work is fine for the Business, Legal, Travel, Tech, and Professional Development Collections. The DOC Archives collection holds the most titles that would possibly require preservation or digitization - a formal evaluation is not expected, but this collection will require more care than simply assessing through the course of other work.
20The Description of Tasks and Deliverables covers a diverse range of duties, including several that require performing duties for and interacting with library staff. Is there an estimate of how the contractor’s time shall be divided among these duties?The contractor is expected to manage their own time, although the Acting Library Director and COR may offer guidance on how to prioritize tasks. For example, when new books arrive, updating the catalog records and making them available for checkout takes precedence over other work being done related to preservation or updating local or union records. However, new books only arrive a few times a month (one or two curated orders along with one-off patron requests). Part of the contractor's job will be to determine how to best split their time to ensure every task gets some attention as their time allows.
21Who determines priorities and how the contractor’s time shall be spent?The contractor is expected to manage their own time, although the Acting Library Director and COR may offer guidance on how to prioritize tasks. For example, when new books arrive, updating the catalog records and making them available for checkout takes precedence over other work being done related to preservation or updating local or union records. However, new books only arrive a few times a month (one or two curated orders along with one-off patron requests). Part of the contractor's job will be to determine how to best split their time to ensure every task gets some attention as their time allows.
22The RFQ states that the contractor shall maintain the LSP records by creating, generating, and checking weekly LSP reports and then correcting typographical errors, cataloging errors, errors in International Standard Bibliographic Description (ISBD) rules, and any other errors noted. Does this mean the contractor will be checking work done by other catalogers at the library or is this to catch their own errors?In 2016 an Inventory Project was done prior to migrating over to a new LSP. 75% of the collection was checked by contracted library technicians for errors in the local and union catalog. However, there is always a need to contiously monitor records and correct the inevitable errors that can occur through copy cataloging or original cataloging, so it is to catch errors made by either the current or past catalogers.
23The Notice for this project on Sam.gov (ID 1331L520Q13OS0027) states, “Original Set Aside: Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)”, but there is no mention of this in the RFP itself. Is this work specifically earmarked for WOSB?This is a Women-Owned Small Business Set aside
24Could you please tell me if the Combined Synopsis/Solicitation posted as solicitation number 1331L520Q13OS0027 on FBO contains requirements similar to any work performed currently or in the past, or will this be a new requirement?This is solicitation for a new contract. Information on an incumbent contractor, if one exists, will not be released as it is not relevant.
25If possible, can you please provide the most recent contract or task order number?See the answer to question 3.
26Is this contract covered by a Wage Determination?Yes
27Is there an Incumbent? If so, what is the previous contract number?See the answer to question 3.
28Are resumes required? If so, will the pages be counted in the Technical Quotation submission? Also, if so, how many pages can the resume be?Resumes are not required.
29Is there a minimum or maximum number of Past Performance references required?Please provide at minimum 3 references.