1305M327Q0037_Questions_and_Answers_0001.docx
DOCX document 22 KB Posted
- Attached to
- Snow Removal Services Green Bay, WI
- Solicitation number
- 1305M327Q0037
About this file
This is a Questions and Answers document for NOAA snow removal services solicitation 1305M327Q0037 in Green Bay, Wisconsin, providing clarifications on billing, wage requirements, contract terms, and operational procedures for prospective contractors.
The contract is a total small business set-aside for snow removal services with a performance period beginning December 1, 2026, and includes a base year plus four option years. Billing is monthly in arrears based on actual services performed with no guaranteed minimums or standby payments. Plowing is billed per push according to snow depth brackets (up to 10–12 inches maximum per line item on the SF-18), with storms exceeding 12 inches requiring multiple passes billed across lower depth tiers to comply with the 4-inch accumulation maintenance requirement. Parking lot de-icing applications are separately billable per application, including reapplications during the same storm or icing event; contractor personnel must check in with the Meteorologist-in-Charge or on-duty forecaster upon arrival before commencing work. Drifting and touch-up services are billed separately per truck hour when spot clearing or return trips occur after full facility cleanup. Contractors must comply with prevailing wage requirements under Wage Determination 2015-4893, Revision 32, with health and welfare fringe of $5.42 per hour (up to 40 hours per week) applicable to employees only; sole business owners and 1099 contractors are exempt. 24/7 availability is required only during snow season (November through April), with October and May services performed as-needed. The contract is subject to the Service Contract Act and Davis-Bacon Act prevailing wage requirements. Quoters must submit unit rates strictly adhering to established SF-18 line-item brackets without modification, and insurance limits and personnel access requirements are not specified in the solicitation. Proposed subcontractors' relevant experience may be cited by new primes if clearly identified, and Certificates of Insurance and licenses are submitted within seven days after award, not as bid-stage attachments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1305M327Q0037 Questions and Answers
1. Should each plow visit be billed separately based on the accumulation at that visit, or does one charge cover all passes and final cleanup during a storm? See questions 18/19
2. If plowing is billed by storm, how does NOAA distinguish separate storms or handle return trips after final cleanup for drifting or refreezing? See questions 18/19
3. How should we quote and invoice plowing for a storm that exceeds 12 inches? No additional rates need to be quoted except for what’s listed.
4. Is each authorized parking lot de-icing application separately billable, including reapplications during the same storm? Who authorizes those treatments?
5. Are monthly invoices based on actual services performed, or is there a fixed monthly payment or minimum for standby coverage? If no services are performed in a month, is any payment due? Invoices are to be billed monthly in arrears for the services actually performed. There are no guaranteed minimums or payments for standby coverage as we cannot pay for services not rendered.
6. Which wage classifications under Wage Determination 2015-4893, Revision 32, should we use for sidewalk snow clearing and pickup-truck plowing? Can you confirm which health and welfare fringe rate applies? HEALTH & WELFARE EO 13706: $5.42 per hour, up to 40 hours per week, or $216.80 per week, or $939.46 per month*
7. If NOAA has a publicly releasable annual estimate or budget range for the base year, could you share it? We do not provide budget or annual estimates publicly.
8. The solicitation and SF18 state a total small-business set-aside, but the SAM notice's set-aside field is blank. Please confirm the applicable set-aside and whether FAR 52.219-14 or other subcontracting limits apply; that clause was not found in the posted clause list. This is a total small business set aside. 52.219-14 does not apply.
9. Section 6 requests the quoter's similar contracts within two years, and Section 7 treats experience as pass/fail. May a new prime rely on its proposed performing subcontractor's relevant contracts and personnel? Yes as long as it's clear it is your subs experience.
10. Please also clarify the “No more then 2/3 pages” limit for each narrative. No more than 2 or 3 pages will be accepted.
11. Please confirm whether payment is based on actual service quantities at the SF18 unit rates or a fixed monthly/annual amount. Invoices will be billed monthly in arrears for the number of snow events worked, using the rates provided.
12. How should quotes price snowfall over 12 inches, repeated pushes during one event, and approved snow relocation/hauling?
13. The schedule requests unit rates, while the cover also requests monthly and annual pricing. The PO will have a not-to-exceed yearly amount, calculated by totaling the hourly rates multiplied by the quantity of services listed.
14. The SOW lists a December 1, 2026 start, while CLIN 0001 says date of award. Please confirm the start date and whether the estimated quantities apply to the shortened first season. The POP is 12/01/2026, the quote should have the amount for the year using the rates and the quantities, same as the options.
15. May a proposed subcontractor attend the optional site visit on IFS's behalf? Yes
16. Please confirm whether required insurance limits and any personnel-access requirements are specified elsewhere. There are none.
17. Attachment 1 places COI/licenses within seven days after award; we have not treated them as bid-stage attachments. Correct.
18. Parking lot de-icing (per application, estimated quantity 15): Is each application separately billable, including reapplications made during the same storm or icing event? And are applications performed at the contractor's discretion when conditions require them, or must each application be authorized in advance by the MIC or designee? Each parking lot de-icing application is separately billable under the unit price line item, including authorized reapplications during extended icing events or following distinct plowing passes. Per Section 10 of the Statement of Work (SOW), the contractor is required to respond to freezing rain or icing events as they occur. Advance written authorization is not required prior to mobilizing for an active icing event; however, per SOW Section 5, contractor personnel must check in with the Meteorologist-in-Charge (MIC) or on-duty forecaster (serving as the 24/7 designee) upon arrival before commencing work. Every application must be recorded on the Service Report log and submitted with the monthly invoice.
19. Storms exceeding 12 inches: The pricing schedule's highest plowing band is 10–12 inches per push. How should a single storm event with total accumulation over 12 inches be priced and billed — at the 10–12-inch rate, or by another method? Quoters must submit unit rates strictly adhering to the line-item brackets established on the SF-18 (up to 10–12 inches per push) without adding or modifying line items. Under SOW Section 10, the contractor is required to maintain drives and primary walkways continuously during heavy snowfall and not allow accumulation to exceed four (4) inches. Consequently, a storm yielding over 12 inches of total snowfall requires multiple passes throughout the event and will be billed across multiple individual pushes in the lower depth tiers (e.g., 2–3.9 in. or 4–5.9 in.) based on the actual depth cleared at each visit, rather than as a single push.
Scenario 1: Steady Major Snowstorm (14 Total Inches over 16 Hours) Event Profile: Snow falls continuously at roughly 1 inch per hour.
Operational Execution: Section 10 of the SOW dictates that after plowing begins, the contractor cannot allow snow to accumulate over 4 inches, and primary areas must be maintained continuously. To meet this requirement, the contractor visits the site four times:
Pass 1 (Mid-storm): 3.5 inches cleared.
Pass 2 (Mid-storm): 3.5 inches cleared.
Pass 3 (Mid-storm): 3.5 inches cleared.
Pass 4 (Final cleanup after storm tapers): 3.5 inches cleared.
Billing / Invoicing:
Each visit is logged on the Service Report with arrival/departure times and measured depth.
The invoice reflects four separate pushes billed under Plowing per push: 2–3.9 in. (4 × the agreed unit rate).
Scenario 2: Intense Blizzard with Variable Snowfall Rates (18 Total Inches) Event Profile: Heavy snow starts overnight, peaks at 2 inches per hour, and winds down the next afternoon.
Operational Execution: The contractor clears the lot before 6:00 a.m. as required by SOW Section 10, then returns as snowfall intensifies to keep accumulation within the 4-inch limit:
Pass 1 (5:00 a.m. morning clearance): 4.5 inches cleared.
Pass 2 (9:30 a.m. peak snowfall clearance): 3.5 inches cleared.
Pass 3 (2:00 p.m. peak snowfall clearance): 4.5 inches cleared.
Pass 4 (5:30 p.m. peak snowfall clearance): 3.5 inches cleared.
Pass 5 (9:00 p.m. storm ends, final cleanup): 2.0 inches cleared.
Billing / Invoicing:
Two pushes billed under Plowing per push: 4–5.9 in..
Three pushes billed under Plowing per push: 2–3.9 in..
Total storm accumulation is 18 inches, but no single push exceeds 4.5 inches, fully complying with both SOW performance thresholds and the SF-18 rate schedule.
Scenario 3: Fast Overnight Accumulation Followed by Additional Daytime Snow (15 Total Inches) Event Profile: An unexpected rapid snow burst drops 10.5 inches overnight before the contractor’s first pre-6:00 a.m. arrival, with another 4.5 inches accumulating during the following morning.
Operational Execution:
Pass 1 (5:30 a.m.): The contractor plows the 10.5 inches that accumulated overnight to open the facility prior to 6:00 a.m..
Pass 2 (11:00 a.m.): The contractor returns to clear the remaining 4.5 inches once the system moves out.
Billing / Invoicing:
Pass 1 is billed under Plowing per push: 10–12 in. (1 push).
Pass 2 is billed under Plowing per push: 4–5.9 in. (1 push).
Even though total storm depth was 15 inches, the push depths are billed strictly against their corresponding SF-18 unit brackets.
Scenario 4: Exceptional / Unforeseen Single Accumulation Exceeding 12 Inches (e.g., 13+ Inches at One Time) Event Profile: Road closures or restricted access prevent the contractor from reaching the site during the event, resulting in a single clearing where depth on arrival actually exceeds 12 inches.
Contractual Treatment:
Quoters cannot add custom CLINs (such as "Plowing: 12+ inches") to their quote submission, as submitting an unrequested line item risks technical non-compliance under FAR 52.212-1 / 52.212-2.
The work is invoiced at the highest bracket available on the contract schedule (Plowing per push: 10–12 in.).
If extraordinary equipment or heavy pushing beyond the scope of a standard 10–12 inch push is necessitated by Government delay or emergency site shutdown, any equitable adjustment must be coordinated with the Contracting Officer under standard commercial terms rather than by altering the bid schedule.
20. Drifting / touch-up service (per truck hour, estimated quantity 6): Under what conditions is this line billed separately rather than as part of a plowing push — for example, wind-driven drifting after a storm has ended and the site was fully cleared, or touch-up work requested by the MIC between events? The "Drifting / touch-up service (per truck hour)" line item is billed when spot clearing or return trips are required after full-facility plowing and final cleanup have already been completed. Common conditions include wind-driven snow accumulating across previously cleared drives, clearing isolated drifts around building entrances or gates, or localized touch-up work specifically requested by the MIC or designee between storm cycles. Full facility clearings following new snow accumulation of 1 inch or more are billed under the standard "Plowing per push" depth brackets.
21. Which wage classification and minimum hourly rate should I use for a worker who drives a pickup with a plow to clear the parking lot and access roads? If that same worker also clears sidewalks or applies ice melt by hand, does a different rate apply, and should I track those hours separately? Plow truck driver would be under the 31000 series for truckdriver. Yes, that would be covered under the grounds maintenance category and those hours should be tracked separately.
22. If pickup-truck plowing doesn’t clearly fit a classification on the wage sheet, what rate should I use for my quote, and how do I get the correct classification confirmed? You would have to contact the DOL as this is their requirement.
23. I currently pay my helper as a 1099 contractor. If he works on this contract, do the minimum wage, health and welfare fringe, and paid sick leave requirements apply to his work? If he’s covered and I pay the $5.42 fringe in cash on top of his base wage, what records should I keep, and which, if any, should I submit to NOAA? No, those are strictly for employees, not 1099 contractors.
24. I’m the sole owner and managing member of my company and I may do some of the plowing myself. Do the wage, fringe, or paid sick leave requirements apply to the hours I personally work? No, you don't have to pay yourself those benefits. Under federal contracting laws like the Service Contract Act (SCA) and the Davis-Bacon Act (DBA), a bona fide business owner is considered an exempt executive rather than a covered worker. Therefore, they do not have to pay themselves the contract's mandatory prevailing wages, health and welfare fringe benefits, or paid sick leave.
25. Is 24-hour, 7-day availability required for the whole 12/01-11/30 term, or only for November through April with as-needed coverage in October and May, since the solicitation states both a 24/7 schedule and that services are anticipated November through April with October and May performed only if snow or ice occurs or when requested? This is only needed during the snow season.
File details come from the government source that posted it. Updated .