This document is a Requests for Information (RFI) log for RFQ 1305M327Q0034, the Milford Lab Sea Water Pump House Renovation project issued by NOAA. Nineteen RFIs were submitted and responded to between November 10 and November 26, 2026. Key clarifications include: the correct Davis-Bacon wage determination is Connecticut CT20260023 (not MA20260001); limitations on subcontracting and nonmanufacturer rules do not apply; quotations are due December 7, 2026 at 12:00 PM EST via email to grace.lapierre@noaa.gov and charles.kendall@noaa.gov; the period of performance extends from award date through February 17, 2027; and RFO Clause 52.236-6 was added regarding site superintendent requirements. Questions deadline was confirmed as November 19, 2026 at NOON EST.
Technical specifications clarified include: Kynar/PVDF only materials for Vanton pump wetted parts (polypropylene not acceptable); all four pumps require 15 HP motors; Building 1 VFDs must be rated for 15 HP; and Kobold pressure sensors and current transducers must be model SEN-96010P065G0, Serial 2-85270, 100 PSI, 20 mA, 30V. The government confirmed existing electrical configurations accommodate single-pump-at-a-time work and permit required equipment spacing. For NEMA 4X enclosure delivery conflicts with the four-week material delivery requirement, contractors are instructed to quote the earliest available delivery timeframe and estimated completion date with an estimated award date of December 11, 2026. Past performance questionnaires may be submitted for the prime and/or subcontractors (up to three per entity), with assessors being any government personnel with relevant contract experience.
View the file
Other files
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests For Information (RFIs) / Inquiries Project Title: Milford Lab Sea Water Pump House Renovation RFQ Number: 1305M327Q0034
RFI # Date Recv'd RFI Date Sent to
Client Client/SME Response Response Date Date sent to Ktrs
1 10-Nov-26
The solicitation and SOW cite Davis-Bacon WD # MA20260001, but the place of performance is Milford, CT (New Haven County). Please confirm whether MA20260001 is correct for this work or amend to the applicable Connecticut wage determination.
12-Nov-26 CT20260023 is the correct WD. 12-Nov-26 12-Nov-26
2 10-Nov-26
FAR 52.219-14: Does the Limitations on Subcontracting clause/statutory limitation apply to this requirement, and if so, what percentage limitation applies (general construction)? Please confirm that amounts paid to similarly situated small subcontractors under NAICS 236220 do not count toward the limitation.
12-Nov-26 The limitations on subcontracting clause does not apply. 12-Nov-26 12-Nov-26
3 10-Nov-26 FAR 52.219-33 / Nonmanufacturer Rule: Does the Nonmanufacturer Rule apply to the pumps/equipment furnished under this construction requirement?
12-Nov-26 The nonmanufacturer rule does not apply to this requirement.
12-Nov-26 12-Nov-26
4 10-Nov-26
Submission: Please confirm quotations are due 12:00 PM EST on Dec 7, 2026, submitted by email to the Contracting Officer and Contract Specialist, and that the email route governs over the sealed-paper language in SF-1442 Block 13a. Please also confirm "local time" means Eastern time.
12-Nov-26 That is correct. Quotes are dude at noon on Dec 07, 2026 and should be submitted via email to grace.lapierre@noaa.gov and charles.kendall@noaa.gov.
12-Nov-26 12-Nov-26
5 10-Nov-26
Site Superintendent (SOW §4.7): The SOW requires a dedicated Site Superintendent who "must be a direct employee of the General Contractor." Where the prime contractor manages the contract and a subcontractor performs the field work, may the superintendent be a direct employee of the subcontractor performing the work?
12-Nov-26
RFO Clause 52.236-6 added. The Superintendent must have authority to act on behalf of the Prime Contractor. If your subcontractor has the authority to make and approve changes, and negotiate resolution to potential issues, the answer is yes.
12-Nov-26 12-Nov-26
6 10-Nov-26
Period of performance: The solicitation states award date to Feb 17, 2027, while the SOW states work between Oct 1 and Dec 1, 2026 or 60 days from NTP. Please confirm the Feb 17, 2027 end date governs.
12-Nov-26 The period of performance will be from date of award through February 17, 2027.
12-Nov-26 12-Nov-26
7 10-Nov-26 Insurance (52.228-5): Please state the required types and minimum amounts of insurance for work on the Government installation.
12-Nov-26 Clause RFO 52.228-5 has been removed. 12-Nov-26 12-Nov-26
RFQ Number: 1305M327Q0034
RFI # Date Recv'd RFI Date Sent to
Client Client/SME Response Response Date Date sent to Ktrs
8 10-Nov-26 Questions deadline: Please confirm questions are due Noon EST Nov 19, 2026 (p. 3 says "Noon EDT"; CAR 1352.215-72 says "NOON EST").
12-Nov-26 All questions are due NOON EST on Nov 19, 2026. Solicitation updated for consistency.
12-Nov-26 12-Nov-26
9 10-Nov-26
Past performance: Must past-performance questionnaires come from the prime only, or may the prime submit questionnaires / cite past performance for a subcontractor that will perform the work?
12-Nov-26 Questionnaires may be submitted for the prime and/or subcontractor. Please submit no more than three questionnaires per the prime and per each subcontractor.
12-Nov-26 12-Nov-26
10 12-Nov-26
Section 2.3.2 of the SOW states in one place "Materials of Construction: Kynar (cannot be Polypropylene)" and in another "Materials of Construction: Polypropylene (Kynar)."
Could you please confirm which material governs for the wetted parts of the Vanton pumps — Kynar/PVDF only, or is polypropylene acceptable?
19-Nov-26 Kynar/PVDF only. Polypropylene is not acceptable. 20-Nov-26 24-Nov-26
11 16-Nov-26 Will there be a final conformed set of bid documents issued that needs to be submitted as there are discrepancies in the page numbers within the current sets of documents?
19-Nov-26
The Base Standard Form 1442 (SF1442) for 1305M327Q0034, Amendment 0001, and any future amendments will all apply.
Amendments only state changes to the base solicitation (the base SF1442), all other terms and conditions outlined in the base remain unchanged.
20-Nov-26 24-Nov-26
12 16-Nov-26 Is a Technical Approach document required with the bid documents?
19-Nov-26 Read provision 52.212-1 & 52.212-2. 20-Nov-26 24-Nov-26
13 11/16/2026 Please clarify which government personnel would be considered an acceptable accessor for the Past Performance Questionnaire.
19-Nov-26 The assessor may be any government personnel who has experience working with the contractor on a relevant contract.
20-Nov-26 24-Nov-26
14 11/16/2026 Please advise to the model/spec required for the Kobold pressure sensors.
19-Nov-26
Kobold SEN-96010P065G0 S# 2-85270
100 PSI
20 mA 30V
20-Nov-26 24-Nov-26
15 16-Nov-26 Please advise to the model/spec required for the Current Transducers.
19-Nov-26
Kobold SEN-96010P065G0 S# 2-85270
100 PSI
20 mA 30V
20-Nov-26 24-Nov-26
RFQ Number: 1305M327Q0034
RFI # Date Recv'd RFI Date Sent to
Client Client/SME Response Response Date Date sent to Ktrs
16 16-Nov-26
The original intent was to complete the electrical demolition under the shutdown of all 4 pumps concurrently to be able to clean up the existing wire trough and prepare for the new equipment installation. With the requirement being updated to working on 1 pump at a time has it been verified that the existing electrical configuration allows for these conditions and allows for the spacing required for the new equipment?
19-Nov-26 Yes, That is correct. The existing conditions allows for that electrical configuration and spacing requirements.
20-Nov-26 24-Nov-26
17 19-Nov-26
Based on the specified flow rate requirements, please confirm that all four (4) pumps are required to have a 15 HP (Vanton Chem-Gard® ANSI horizontal centrifugal pump, Model CGA-KY4X3X10-OP (A-70) brand name or equivalent.
19-Nov-26 Yes, all 4 pumps are required to have 15 HP motors. 20-Nov-26 24-Nov-26
18 19-Nov-26 Do the VFDs for Building 1 need to be rated at 10 HP or 15
HP?
19-Nov-26 Building # 1 VFDs need to be rated for 15 HP. 20-Nov-26 24-Nov-26
19 19-Nov-26
The Statement of Work requires NEMA 4X enclosures and delivery of materials within four weeks of Notice to Proceed.
However, NEMA 4X enclosures have longer lead times because they are custom-ordered and may not be available within the required timeframe. How does the Government intend to address this conflict between the specified equipment requirements and the material delivery schedule?
19-Nov-26 Please quote the earliest delivery timeframe available and your earliest estimated completion date with an estimated award date of 12/11/2026.
20-Nov-26 24-Nov-26