Sol_1305M326Q0442_Amd_0002.pdf
PDF 228 KB Posted
- Attached to
- Replacing Wall & Roof Insulation at NEXRAD sites
- Solicitation number
- 1305M326Q0442
About this file
This is Amendment 0002 to a federal solicitation (1305M326Q0442) issued by the National Oceanic and Atmospheric Administration (NOAA), National Weather Service, through the Administering Office at WAD-OAR in Boulder, Colorado, effective August 14, 2026. The amendment is not extended and requires offerors to acknowledge receipt prior to the specified deadline.
Amendment 0002 adds a Questions and Answers section addressing six clarifications related to insulation installation and removal work at four NEXRAD (weather radar) sites. Key responses include: GPS coordinates for the Reno, Flagstaff, Elko, and Cedar City radar locations; confirmation that R-19 insulation is required for both walls and ceilings; roof square footage of 2,200 and wall area of 7,800 square feet per site (with contractor responsibility for verifying measurements); Government personnel will remove movable equipment and supplies prior to contractor work; dumpsters are permitted in the vicinity of buildings without blocking road or door access; and no additional interior photographs beyond Amendment 0001 are available for protection planning during insulation removal and installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Insulation_Photos_1305M326Q0442_0001.pdf | ||
| Sol_1305M326Q0442_Amd_0001.pdf | ||
| Washoe_NV20260093.txt | TXT text file | |
| Sol_1305M326Q0442.pdf | ||
| Drawing_Snow_Shelter_As_Built_1305M326Q0442.pdf | ||
| Coconino_GD_AZ20260043.txt | TXT text file | |
| Asbestos-Containing_Materials_Certification_1305M326Q0442.pdf | ||
| Iron_UT20260073.txt | TXT text file | |
| Elko_NV20260061.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
JAMIE R. ROSALES
See continuation page
WAD-OAR
325 BROADWAY, SOU6
BOULDER CO 80305
WAD-OAR
1305M326Q0442
08/14/2026
08/14/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M326Q0442/0002
AMENDMENT 0002 (08/20/2026):
ADD QUESTIONS AND ANSWERS
1. Can you provide the physical address or GPS coordinates for each of the four NEXRAD sites?
It helps with understanding potential road conditions and how we navigate the rigs.
The project is to be completed on the below premises of the NWS.
Reno Radar - 39°45'15.33"N 119°27'43.37"W
Flagstaff Radar - 34°34'27.96"N 111°11'54.11"W
Elko Radar - 40°44'22.96"N 116°48'10.23"W
Cedar City Radar - 37°35'27.09"N
112°51'43.46"W
2. Can you confirm the required R-value for the walls and roof/ceiling separately? Is R-19 required for both? Yes. Same on walls and ceilings.
3. Can NOAA provide the approximate square footage broken out between wall area and roof/ceiling area for each site, rather than the combined approximate 10,000 SF per site?
The roof square footage is 2,200 and the walls are 7,800. This measurement was estimated using
Google Maps. Per 3.1 on the SOW the contractor is responsible for verifying measurements.
4. For preparation prior to installation, will
Government personnel remove movable equipment, supplies, furniture, and other items that are not permanently attached, or should the contractor include moving/protecting those items in its scope? Yes
5. Are dumpsters permitted at each site for temporary collection of removed insulation? If so, is there a designated area where a dumpster can be placed? Yes. In the vicinity of the building where it won't block road or door access.
6. Are there any additional interior photographs available beyond those included with Amendment 0001, particularly photographs showing all walls, ceilings, equipment, and
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M326Q0442/0002 other items that would require protection during insulation removal and installation?
No.
END OF AMENDMENT 0002
1305M326Q0442 0002
Section II - Supplies or Services and Price/Costs
CLIN List
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .