This is a Statement of Work for sump drainage and exterior waterproofing services at the National Weather Service Weather Forecast Office in St. Charles, Missouri. The contractor must excavate the exterior wall approximately 36 linear feet down to the footing, clean and detail any cracks, install a footing drain with geotextile fabric, install an exterior sump basin with a 1/2-HP pump, backfill with clean gravel, discharge the pump to daylight approximately 16 feet from the building, haul all spoils, set electrical for the pump, mark buried utilities, and replace landscaping as needed. All work must be completed within 60 days from the notice to proceed, with a one-year warranty on all work and supplied materials.

The contractor is responsible for scheduling coordination with the Meteorologist in Charge, maintaining daily site cleanliness, establishing safety measures with cones and caution tape, and conducting work Monday through Friday between 7:00 am and 5:00 pm unless otherwise approved. The contractor must designate a local supervisor representative for site communications and is accountable for removal and disposal of all unused materials and equipment in compliance with Federal, State, and local environmental regulations. Work may be halted immediately if severe weather occurs within the warning area. The government reserves the right to inspect for quality control at any point during the process, and the contractor must notify the Contracting Officer Representative upon completion before invoicing and release of claims.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Drainage and Sump Pump Installation LSX Weather Forecast Office St Louis, MO 142030-26-0064

Scope: The Contractor shall provide all personnel, materials, labor, equipment and supervision to complete the sump drainage and exterior water proofing at the National Weather Service (NWS) Weather Forecast Office (WFO) located in St. Louis, MO (LSX). This objective is to provide proper drainage away from the building during heavy rains.

Location:

National Weather Service Weather Forecast Office 12 Missouri Research Park Drive St. Charles, MO 63304-5685

Government Point of Contact (GCP):

Local point of contact (POC)

PROVIDED UPON AWARD

Technical Representative

PROVIDED UPON AWARD

Description of Work:

· Excavate exterior wall down to footing (approx. 36 linear feet).

· Clean wall/footing. Hand detail any cracks.

· Install footing drain.

· Install geotextile fabric to overdig.

· Install exterior sump basin and 1/2-HP pump.

· Backfill to surface with clean gravel for drainage.

· Discharge exterior sump pump to daylight at back of building (approx. 16 feet).

· Haul all spoils.

· Set electric for sump pump.

· Mark any extraneous buried utilities at back of building.

· Replace landscaping as needed.

Completion Date: This project shall be complete within sixty (60) days from the date of notice to proceed.

If any delays are expected, the Government Contracting representative shall be notified as soon as possible to coordinate the modification.

Inspections and Acceptance: Upon completion, before invoicing and Release of Claims, contractor will notify the COR (Contracting Officer Representative) on site for approval and/or acceptance.

Terms of the SOW: The Contractor shall designate a local supervisor representative for the contract site, with contact numbers, for the COR to communicate with about the quality or work, progress, and technical details of the project. Neither the local representative nor the COR has the authority to modify the contract in any manner which might affect the cost thereof.

1. The contractor will be responsible for the scheduling and coordination of work on the site with the Meteorologists in Charge (MIC) or MIC’s representative. This will include any required outages. In the event severe weather occurs within the warning area of the work site, all work being performed by the contractor may be halted by the local Meteorologist in Charge (MIC). Work stoppage due to severe weather in the warning area is not negotiable and all work will stop immediately.

1. All areas will need to be kept clean on a daily basis

1. Cones, caution tape and safety devices will be required to be set by contractor in all areas where work is to take place.

1. Unless otherwise approved, the Contractor shall schedule all work Monday through Friday with work hours between the hours of 7:00 am and 5:00 pm. Longer work days may be approved; The Contracting Officer and the COR shall be notified when changes in the project schedule are requested along with the reason.

1. The Contractor shall be responsible for removal and disposal of all unused materials and placed equipment. All disposals shall conform to Federal, State and local environmental regulations.

1. The Government reserves the right to inspect for quality control at any point during the maintenance process.

1. Warranty on all work & supplied materials is 1 year.