This document is Standard Form 30 Amendment No. 0002 to solicitation 1305M326Q0190, issued by the National Oceanic and Atmospheric Administration (NOAA) through the WAD-SAP office in Boulder, Colorado. The amendment is effective May 11, 2026, and the estimated project magnitude is between $100,000.00 and $250,000.00. The solicitation involves roofing work and requires a payment bond or irrevocable letter of credit unless the quote is under $35,000.00. Key personnel positions, including Project Manager and Onsite Manager, may be filled by subcontractor personnel. The contractor is responsible for certifying that no asbestos-containing materials will be delivered or installed on-site and must cover removal costs if any are inadvertently introduced; however, the government believes the building was constructed in the mid-1990s with no existing asbestos in the current roofing structure.
Amendment 0002 addresses five vendor questions regarding bonding requirements, personnel staffing flexibility, asbestos certification scope, framing elevation specifications, and lightning protection system inspection responsibilities. The contractor bears responsibility for obtaining third-party UL inspector certification of the reinstalled lightning protection system to current NFPA standards. Amendment 0001, issued May 18, 2026, provided the project magnitude estimate and required vendors to use the revised Statement of Work (Attachment 1 STATEMENT_OF_WORK_REVISED_051826) rather than the original version, with non-responsive quotes subject to exclusion without vendor notification. Attachment 5 Framing Elevations was added to the solicitation package.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
KERRI COFFEY
See continuation page
WAD-SAP
325 BROADWAY, SOU6
BOULDER CO 80305
WAD-SAP-B
1305M326Q0190
05/11/2026
05/11/2026
1 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M326Q0190/0002
AMENDMENT NUMBER 0002 (05/20/2026):
1) VENDOR QUESTION: Is there a bond needed for this project?
RESPONSE: In the Sol_1305M326Q0190 document, Section 2 – Combined Synopsis/Solicitation states: A PAYMENT BOND OR IRREVOCABLE LETTER
OF CREDIT WILL BE REQUIRED UNLESS YOUR QUOTE IS
UNDER $35,000.00.
2) VENDOR QUESTION: Statement of Work, Section
2 Requirements, sub-section R. Key Personnel:
is it acceptable for the Project Manager and the Onsite Manager to be filled by subcontractor personnel?
RESPONSE: Yes, it is acceptable for the
Project Manager and the Onsite Manager to be filled by subcontractor personnel.
3) VENDOR QUESTION: Attachment 4 Construction
Order Certifications: Could you please clarify the requirement? Specifically, are we confirming that no asbestos-containing material will be brought or installed on-site, or has the existing assembly tested positive for asbestos-containing material, requiring its removal?
RESPONSE: Signing and providing Attachment 4
Construction Order Certifications is as the document states: The Quoter is certifying that no asbestos-containing materials, products or supplies will be delivered to the work site or utilized or installed during the performance of the proposed contract. Also, the Quoter is certifying that if awarded the contract they will be responsible for the cost of removal of all asbestos-containing materials, products or supplies delivered to the work site or utilized or installed during the performance of the contract, and the cost for remediation of any hazard created. However, the Government believes the building was constructed in the mid-1990s and believes there are no asbestos-containing materials in the current roofing structure.
4) VENDOR QUESTION: Is there a specification sheet available for this portion of the
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M326Q0190/0002 project?
RESPONSE: Attachment 5 Framing Elevations has been added to this solicitation. Please review this attachment.
5) VENDOR QUESTION: Statement of Work, Item I, Lightning Protection System Requirements:
Advise if the contractor is responsible for the inspection and certification of the lightning protection system after reinstallation, or will the Government coordinate the inspection separately?
RESPONSE: It is the responsibility of the
Contractor. The Statement of Work, General
Requirements section, item I, #2 states:
Certification documentation from an
Underwriters Laboratories Inc. third party inspector should be submitted to the Government
Point of Contact verifying that the reinstalled
Lightning Protection System has been reinstalled to current NFPA Standards.
NO OTHER CHANGES.
AMENDMENT NUMBER 0001 (05/18/2026):
1) VENDOR QUESTION: WILL YOU PLEASE PROVIDE
THE MAGNITUDE FOR THE PROJECT?
RESPONSE: THE ESTIMATED MAGNITUDE IS BETWEEN
$100,000.00 and $250,000.00.
2) THE STATEMENT OF WORK HAS BEEN REVISED.
VENDORS SHOULD DISREGARD ATTACHMENT 1 STATEMENT
OF WORK AND UTILIZE ATTACHMENT 1 STATEMENT OF
WORK_REVISED_051826. QUOTES RECEIVED THAT ARE
NOT RESPONSIVE TO ATTACHMENT 1 STATEMENT OF
WORK_REVISED_051826 MAY BE EXCLUDED FROM
EVALUATION WITHOUT NOTIFICATION TO THE QUOTER.
NO OTHER CHANGES.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .