RFI Tracker-1305M325Q0238-B130 Phys Lab Wall Removal-21 Aug 25.pdf
PDF 236 KB Posted
- Solicitation number
- 1305M325Q0238
About this file
This document is a Requests for Information (RFIs) for a B130 Phys Lab Wall Removal project with RFQ/RFP Number 1305M325Q0238. The RFIs cover multiple technical and logistical details for a wall removal project at a NOAA facility, with 10 specific questions addressed between 08/11/25 and 08/15/25. Key details include confirmation that NOAA will move non-attached items near the wall, clarification on fire alarm system modifications (integrator is Johnson Controls Inc.), verification of equipment access limitations, and confirmation of project specifics such as painting requirements and Davis-Bacon wage rates. The project involves removing a wall between Rooms 2108A and 2108B, with careful consideration of fire alarm system integrity, equipment staging, and potential equipment access constraints. Responses were consistently provided on 08/20/25 and transmitted to contractors on 08/21/25, indicating a quick turnaround for contractor inquiries.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1305M325Q0238_Amd_0001.pdf | ||
| RFI-Figure1.jpg | JPG image | |
| SOW - B130 Phys Lab Wall Removal - 31 Jul 25.pdf | ||
| DBA Wage Rate HI20250001.pdf | ||
| RFQ -1305M325Q0238 - B130 Phys Lab Wall Removal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI # Date Recv'd RFI Date Sent to
Client Client/SME Response Response Date
Date sent to Ktrs
1 08/11/25
Will the contractor be responsible to move/relocate any items located along both sides of and adjacent to the wall other than the granite top? (i.e. appliances, tv screen, empty tanks, etc.)
08/20/25
With the exception of the granite table top, NOAA will move items that are not attached away from the immediate vicinity of the wall. If the contractor determines that the wall-mounted TV screen needs to be removed during construction, they are authorized to remove the TV. It should be replaced upon completion of construction.
08/20/25 08/21/25
2 08/11/25 Does the fire alarm flasher (figure 1) need to be relocated/reinstalled in another area or just disconnected and removed?
08/20/25 Proper functioning of the fire alarm system must be maintained per the requirements of NFPA 72. See response to #3.
08/20/25 08/21/25
3 08/15/25
Please confirm who NOAA’s designated fire alarm maintenance provider is for Building 130. Any modifications to the system will need to be coordinated and priced through that provider to ensure system integrity and approval by the AHJ.
08/20/25 The fire alarm system integrator was Johnson Controls Inc. 08/20/25 08/21/25
4 08/15/25
The scope of work calls for removal of a wall between Rooms 2108A and 2108B. An existing fire alarm indicator is located on an adjacent wall. Once the subject wall is demolished, the remaining indicator will be visible from all areas within the new combined space. Per NFPA 72, relocation of notification appliances is not explicitly required unless coverage in the occupied area is compromised, with final determination left to the
Authority Having Jurisdiction (AHJ). Could NOAA please confirm with the AHJ/fire inspector whether the existing indicator will suffice, or if relocation will be required?
08/20/25 See response to #3 08/20/25 08/21/25
5 08/15/25 Is there a staging area for trucks and equipment at the site?
08/20/25
There is a limited amount of space to stage vehicles and equipment in the vicinity.
08/20/25 08/21/25
6 08/15/25 Is the wall accessible for equipment (small forklift or hand forklift, etc.)
08/20/25
The contractor should be cognizant of any overhead clearance required to bring equipment through doorways and into the room.
08/20/25 08/21/25
7 08/15/25 Can you provide pictures of the access areas? 08/20/25
See attached <RFI-Figure1.jpg> showing the area immediately outside the Rooms. Note vertical clearance of 8 FT. The double doors into the room have vertical clearance of 7 FT and horizontal clearance of about 5 FT 6 INCHES.
08/20/25 08/21/25
Requests For Information (RFIs)
RFQ/RFP Number: 1305M325Q0238 Project Title: B130 Phys Lab Wall Removal
RFI # Date Recv'd RFI Date Sent to
Client Client/SME Response Response Date
Date sent to Ktrs
Requests For Information (RFIs)
RFQ/RFP Number: 1305M325Q0238 Project Title: B130 Phys Lab Wall Removal
8 08/15/25 Is this a Davis-Bacon rate project? 08/20/25 Yes, please review the RFQ. Attachment 2 details the applicable Wage Rate.
08/20/25 08/21/25
9 08/15/25
After the demolition of the wall, that section will need to paint. (Approx 10" x 10') There is a slight possibility that the paint will not match exactly. Would this be okay or would you like us to paint the entire wall corner to corner?
08/20/25 A close color match is sufficient. No need to repaint wall corner to corner.
08/20/25 08/21/25
10 08/15/25 Are we relocating the fire alarm strobe or deleting it?
There is an existing strobe on the adjacent wall. Also who is your contract with for the fire alarm system?
08/20/25 See response to #3 08/20/25 08/21/25