This document is an amendment to a solicitation for a firm-fixed price contract to provide a charter vessel for marine ecology research surveys. The key details are:
The National Oceanic and Atmospheric Administration's National Marine Fisheries Service is seeking a charter vessel to support small boat operations, including launching and recovering one or two work boats, as well as conducting oceanographic sampling, for turtle ecology and marine mammal ecology research cruises. The base period of performance is expected to start on or about August 19, 2024 for 12-40 days, departing from and returning to Woods Hole, MA. The solicitation was amended to address questions from vendors, revise the Statement of Work and instructions to offerors, and extend the due date for quotations to 5:00 PM Eastern Time on July 9, 2024. The vessel requirements include accommodating 9-12 scientific crew, having a crane capable of launching and recovering a 6,750 lb. 20-foot work boat, and providing various oceanographic sampling equipment and capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1305M324Q0291.pdf | ||
| 1305M324Q0291_SOW.pdf | ||
| Attachments_1-8.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1305M324Q0291 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WAD-NMFS-S
SEATTLE WA 98115
7600 SAND POINT WAY NE BLDG 1
WAD-NMFS-Seattle
07/08/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/24/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Period of Performance: 08/01/2024 to 07/31/2025
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
AMANDA ROSSITER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0001 to Solicitation 1305M324Q0291 is issued to:
1. Address questions received from vendors below in RFQ Questions & Answers.
2. Provide revisions to the Statement of Work (SOW) contained in the solicitation issued on June 24, 2024, reference Section 3 - Line Items and Attachments. Revisions are attached and are indicated in black strikeout.
3. Provide revisions to 52.212-1 ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS –
COMMERCIAL ITEMS contained in the solicitation issued on June 24, 2024, reference Section 6 - Instructions to Offerors. Revisions are attached and are indicated in red and black strikeout.
4. The due date for receipt of quotations has changed from 2:00 PM Eastern Time on July 8, 2024 to 5:00 PM Eastern Time on July 9, 2024.
RFQ
Questions & Answers
1. If after practice launching and recovering the 26’+ work boat it is deemed not safe to launch at sea, is the contract void or is there an option to complete the mission using smaller boat(s)?
For the turtle ecology portion of the Requirements, we will need a ship that can launch and recover the small boat specified in the Statement of Work.
For the cetacean ecology portion, if it were determined that the ship could not launch the boat safely, we might still be willing to move forward if the ship really excelled in its capacity for all the other aspects; the visual data collection, oceanography, PAM array capability, etc. But if those other components were borderline, then losing the small boat component would likely be too much of a detriment to move forward.
2. Please describe the 23’ vessel that the contract vessel will serve as a Mothership to in regards to transfer of personnel (i.e is it a foam collar or inflatable collar, or fiberglass, aluminum, etc., how tall a superstructure)?
The small boat described in the Statement of Work is an aluminum hulled boat with a foam collar. It is a customized Silver Ships Ambar. It's official LOA is 20'6" and beam is 8'10", but there is additional structure involved, which is why we specified a longer length. A technical drawing is provided below.
3. If a vessel needs to transit from their home port to Woods Hole, please confirm those days are considered additional mobilization days rather than transit or sea days?
Please see updates in the attached ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS –
COMMERCIAL ITEMS.
Section 3 - Line Items and Attachments
STATEMENT OF WORK
CHARTER VESSEL FOR MARINE ECOLOGY RESEARCH
1.0 GENERAL
The NOAA Fisheries Northeast Fisheries Science Center’s Protected Species Division (PSD) is seeking a charter vessel to survey for protected species and support small boat operations, including launching and recovering one or two small work boats. When protected species are located, the work boat(s) will be deployed with science personnel, if weather permits. Oceanographic sampling is expected to be done from the charter vessel. This cruise requirement may be divided into two objectives: Turtle Ecology and Marine Mammal Ecology.
The leatherback sea turtle is listed as endangered under the United States Endangered Species Act (ESA).
NOAA Fisheries and the US Fish and Wildlife Service share jurisdiction of all sea turtles listed under the ESA.
NOAA Fisheries leads the conservation and recovery efforts for sea turtles in the marine environment by conducting various research activities on the biology, behavior, and ecology of leatherback sea turtles. Research results are used to evaluate population trends, inform conservation management strategies, and to assess progress toward recovery for this imperiled species. NOAA’s work includes studying behavior through various types of tagging, satellite tracking, chemical analysis, and vessel and aerial surveys.
Beaked whales and other deep-diving cetaceans are protected under the US Marine Mammal Protection Act (MMPA), with some species (i.e. sperm whales) also listed as endangered under the ESA. NOAA Fisheries leads the conservation and management efforts for these species by conducting various research activities to understand the factors influencing their distribution, biology and ecology. Research results are used to evaluate population trends, inform conservation management strategies, and to assess progress toward recovery.
NOAA’s work includes studying behavior through various types of tagging, satellite tracking, chemical analysis, and vessel surveys.
Right whales are protected under both the ESA and MMPA with NOAA Fisheries leading the conservation and management efforts. The North Atlantic Right Whale is one of the world’s most endangered large whale species and is approaching extinction. To support NOAA’s research objectives, right whale research that is similar to the research described for Turtle Ecology and Mammal Ecology objectives may be incorporated into any of the marine ecology cruises described in this solicitation.
Figure 1. The Primary Survey Operation Area is shown in this figure. Survey Area A is the area within the red circle. Survey Area B are all areas depicted in the chart but outside of the red circle (i.e., outside of Survey Area A).
Survey Operation areas are shown in Figure 1. We hope to spend the majority of the Turtle Ecology survey in the area directly south of Nantucket, but we may extend further, depending on conditions at the time of the cruise. The Marine Mammal Ecology survey would focus primarily on the slope and offshore waters of Georges Bank and out to the Bear Seamount and surrounding areas.
Contracted vessel days may include Mobilization/demobilization Days, Sea Days, or Dock days, (all defined below), with the vendor supplying fixed price quotes for the different individual rates for Mobilization /Demobilization Days, Sea Days and Dock days.
2.0 SPECIFIC TASKS AND RESPONSIBILITIES
2.1 VESSEL AVAILABILITY REQUIREMENTS
The base period of performance for this is expected to start on or about August 19, 2024 and encompass 12-40 days, departing from and returning to Woods Hole, MA. The contractor is required to be available for at least 12 contracted days with the remaining days being decided by mutual agreement between the contracted vendor and the Government.
The timing of the cruise in the base period would ideally be coordinated with an aircraft which is currently scheduled to fly for this project starting on August 19, 2024. Coordination will be conducted by the COR.
The vessel shall be available at the port of Woods Hole, MA at least one day prior to the start of a research cruise prepared with the necessary fuel, food and crew to conduct and support the mission objectives.
On the day prior to the cruise, the vessel and crew will be made available to NEFSC scientific staff, for the purpose of loading cruise supplies and reviewing (and practicing) procedures for small boat launch and recovery.
If the contract vessel has not launched and recovered a small boat of the same size and complexity as the work boat (total length is 36’) used by the scientists, then the contract vessel shall be available for launch and recovery practice for at least three days prior to the start of the cruise at the vendor’s own expense.
A vessel shall be placed off-hire in the event of loss of time due to any contractor and vessel-related operational deficiencies, including crew changes. If the entire duration of the cruise is expected to be 10 days or less (of combined sea days and dock days), then there shall not be any crew changes in the course of the cruise except for emergencies. .
2.2 CRUISE OPERATIONS (CLINS 0001, 1001, 2001, 3001, AND 4001)
2.2.1 DEFINITIONS RELATED TO CRUISE OPERATIONS
A Sea Day is defined as the vessel being at sea (in Survey Area A or B), transiting to or from planned areas of operation, conducting scientific operations, or laying to, due to inclement weather or scientific equipment failures.
A Mobilization/demobilization Day is defined as the contract vessel traveling to or from Woods Hole port, including any staging and de-staging, and practice retrieving and deploying the small boat.
A Dock Day is defined as staying at the dock for at least 18 continuous hours of the 24-hour calendar day. Dock days include being at the dock for weather related reasons as well as for any staging/destaging and small boat launch and recovery practice beyond what was accomplished during the 2 mobilization/demobilization days.
2.2.2 GENERAL CRUISE OPERATIONS
The vendor shall be available for a post-award conference so that the Captain, Lead Scientist, and others can discuss charter operations, on a mutually agreeable date. Similarly, the vendor shall be available for post-charter meetings on a mutually agreeable date following the completion of each cruise.
Prior to the commencement of the cruise, the vessel will be made available to NEFSC scientific staff, on mutually-agreed upon date(s), to inspect the vessel, potentially train the crew for the deployments & retrievals, and to meet with the Master and/or owners. Any software, gear, and/or equipment installed on the vessel by the PSB for the purpose of conducting the research cruise will be removed at the end of the cruise.
The contract vessel must have a minimum of four crew, covering the role of Master, mate, engineer and chief steward, to operate the vessel and to support scientific operations. The Master and mate must be fluent in English to ensure clear and effective communication with the scientist.
While at sea, the Master is responsible for the operation of the contracted vessel to insure the safety of the scientific staff and all crew members. The contract vessel’s crew is responsible for the safe operation of any crane, davit, or winch.
The contract vessel must be able to accommodate scientific crew of 9-12, and preference will be given to vessels that can accommodate at the higher end of this range. Scientific staff may include federal or contracted employees, volunteers, as well as academic, conservation, or industry partners.
The contract vessel will have an open flybridge which is safely accessible to science crew. At least three science crew may be on the flybridge at any time during the day. (Note: if there is an option other than a flybridge, that gives observers 180-degree view forward, that can be considered). It is preferred that the fly bridge be outfitted with a windshield to protect observers using hand held binoculars from wind.
Prior to the commencement of the cruise, the vessel crew may be requested to install the ‘big eye’ binocular stands on the fly bridge. See images in ATTACHMENT 1. The chief scientist shall be consulted regarding placement prior to installation.
Contract vessel shall be outfitted with a crane which is capable of lifting, launching, and recovering a 6,750 lb.
20-foot aluminum hulled work boat with foam collar and bow and stern extensions which bring the overall length to ~36’. Scientists must be able to board the work boat after the crane brings the work boat outboard of the contract vessel and snugs it up at the deck level of the contract vessel. The crane will be man-rated unless the freeboard of the ship allows one step down to launch the work boat. Government will provide one or two work boats and cradle(s) for work boats to sit on the aft deck. Contract vessel will provide and carry at least 200 gallons of gasoline, preferably in USCG approved mobile fuel caddies, which will be made available for work boat operations. When the work boat is aboard the contract vessel, the contract vessel crew is responsible for making it secure during all seas. Government will provide a man-rated lifting harness for work boat launch and recovery. Contract vessel shall provide a crane operator and at least one deck hand for deployment. Ideally, the contract vessel crew shall be capable of independently launching and recovering the work boat(s), but if this is not the case Government can bring science staff to aid in handling lines during launch and recovery.
The contract vessel should be able to deploy oceanographic equipment (Conductivity, Temperature, Depth (CTD) and plankton nets) using an a-frame, j-frame, or boom with a wire winch. The winch should have at least 200 feet of wire or be able to spool on 200 feet of ¼” wire. Alternatively, the contract vessel could mount a 0.322 conducting wire winch for deploying and retrieving oceanographic sampling equipment. Winch requires 460-volt 3 phase power to be wired by the vessel. The a-frame, j-frame or boom would be used to deploy the plankton nets and CTD. Ideally, this frame/boom would have a minimum clearance height of 9 feet beneath a hanging block throughout its entire range of motion, be capable of extending that block 8 feet over the side and four feet inboard, and be capable of towing a 1,000 lb. load while underway at speeds up to 2 knots. At a minimum, this frame/boom should have a minimum clearance height of 4 feet beneath a hanging block, hold 200 lbs of weight, and raise and lower a static (non-towed) piece of gear. A standard garden hose with seawater supply shall be provided to the sampling deck area to permit washing down of the nets to obtain the plankton samples. Contract vessel shall provide at least two crew members for deployment of plankton and water sampling equipment.
One crew member would operate the frame/boom and one deck hand would operate the 0.322 conducting wire winch during deployments. One or two science staff would handle the plankton/water sampling gear.
If the vessel is conducting the Marine Mammal Ecology portion of the survey in Area B, a passive acoustic hydrophone array will be deployed to collect real-time acoustic data throughout the survey. The array consists of a 400 m cable with 8 hydrophone elements. The diameter of the cable is 0.5”, and it has a minimum bend radius of 16”. Typically, 300m of cable is deployed for passive acoustic operations. The tow cable must be mounted onto a winch or empty net reel provided by the vessel, to facilitate ease of deployment and recovery from the back deck of the ship. A removable deck cable connects the hydrophone tow cable to the computers in a dry lab space, where an acoustic team will be located.
Recordings of acoustic detections will be made into several desktop computers. The acoustic team would require 2-3 GPS feeds from the ship. When deploying and recovering the array, the ship will be requested to slow to 2-3 kts. While the array is in the water, the ship will be requested not to make turns greater than 60°, so as to minimize strain on the electrical wires inside the array.
In addition, if the vessel is conducting the Marine Mammal Ecology portion of the survey in Areas B, a deep-water acoustic mooring in the area of Bear Seamount may be recovered and redeployed as part of the survey operations during option years. To conduct this work, a winch or A-frame will be required to safely deploy and recover the recording unit, float, and cable. The components of the mooring in air weigh approximately 550 and 900 lbs. lifted separately.
The captain must maneuver the ship in position so that the deckhand must be able safely reach over the side/gunnel of the vessel, and with a boat hook, grab, secure and transport the unit back on to the deck during recoveries. Details are below.
2.2.3 DAILY CRUISE OPERATIONS
The starting location for each day will be discussed the previous evening.
A major responsibility of the contract vessel will be to support work boat operations in support of the science mission. The contract vessel will launch and later recover 1 or 2 research work boat(s), as weather permits. The contract vessel must have experience launching and recovering small boats. Detailed protocols (of how small boats with scientists were successfully launched and recovered in the past) must be provided and will be used to evaluate launch and recovering capabilities. It is preferred but not mandatory for the contract vessel to supply a deployable small boat which would be available to be operated by the science party as a second or spare work boat. At times, the contract vessel may also serve as the mothership for a 23’ research vessel, which may tie up to the contract vessel. Personnel from the 23’ research vessel may come aboard the contract vessel as members of the science party, but the 23’ research vessel would not be brought aboard (retrieved or deployed from) the contract vessel.
The contract vessel will stand by during small boat operations, possibly doing oceanographic sampling or collecting towed hydrophone array data, often within 1 nm of the small boat.
Science crew may deploy sUAS (drone) from the contract vessel, and may collect water samples for eDNA analysis or do other oceanographic sampling. These decisions will be made case by case.
The science party will work most daylight hours unless the weather is limiting. If weather does not allow work from the flybridge, observers may stand watch from the wheelhouse. Research operations may include nighttime data collection with the towed hydrophone array. There is the potential for brief operations shortly after sunset (to assess diel vertical migration of plankton). There is also the potential to run transects at night to collect echo sounding data or water samples for eDNA analysis, but this would not require significant deck work.
If the Marine Mammal Ecology portion of the cruise is conducted, during daylight hours, when the visual sighting team is on-effort, the acoustic detection team will work in coordination with them, but will be monitoring the towed hydrophone array. The acoustic team will maintain contact with the visual team to be notified of each cetacean sighting; this information may be transmitted via the visual team’s data stream using the ship’s intranet system and also via handheld walkie-talkie. When the ship is going to break track to investigate a group of animals, the acoustic team must be notified so that the recording equipment settings can be adjusted to compensate for the increase in noise experienced during maneuvering. Once the visual team is satisfied with species identification and collection of photographs, etc., the ship may be asked to maintain a straight-line transit to facilitate the collection of high-quality acoustic recordings. However, the array may be deployed even in poor weather conditions when the visual team is not on-effort, with the exception of high seas and lightning.
An Endangered Species Act (ESA) permit, as well as MMPA permit (if necessary), issued by the Office of Protected Resources will be maintained onboard the vessel for the duration of the survey. The Government will provide the permit. The vessel will be considered a NOAA research vessel under this contract.
The contract vessel shall utilize and maintain nautical charts, deck log and/or computer software(s) that provide a record of the vessel’s location, operations, operating conditions and any vessel-related significant events. These charts, logs and software output(s) shall be made available upon request of the Chief Scientist. The contract vessel Master shall provide scientific personnel access to GPS location data, and other available operations data as needed. Sea surface temperature is of interest to the science party.
Nothing herein contained shall be construed as creating demise of the contract vessel to the Government. The Contractor under this contract shall retain complete and exclusive possession and operation of the contract vessel and its navigation.
2.2.4 ACOUSTIC MOORING RECOVERY/REDEPLOYMENT FOR MARINE MAMMAL ECOLOGY
SURVEY
The offshore mooring is located at 39º 54.660’, -67º 01.720’, at a bottom depth of approximately 3200m. For the recovery/redeployment of this unit. 2600m of cable will have to be recovered and spooled properly for redeployment at a subsequent site. Recovery requirements are as follows: The first stage of recovery is to bring the float aboard. A line of suitable strength to lift 5510 lbs. (2500kg) (order of magnitude safety margin - the heaviest piece of the mooring during recovery is the float at 550 lbs., or 250 kg) will be required.
The line should be passed through a block capable of accepting a 5/8” shackle or larger attached to the a-frame.
The float at the top of the mooring (1m syntactic foam sphere) has a 10m floating line spliced into a loop attached to the top of the float. The loop is used to attach a lifting line to, either by maneuvering the ship close enough to throw a grappling hook, or by using a small boat to take a lifting line out to the float and manually attach it. The float should be lifted to the A-frame and the A-frame brought inboard. The float can then be lowered and secured on deck. The lifting line should be transferred to the 40m ¾” nylon line attached to the bottom of the float and the 40m piece should be recovered directly onto the empty spool. The spool should be positioned to receive the mooring line after it has gone around the capstan and is no longer under tension. The hydrophone is located at the bottom of the 40m line. When the phone is recovered, it can be secured to the deck. The lifting line should then be transferred from the top of the ¾” nylon line to the paralink on the bottom of the hydrophone. Recover the 2500 to 3300m long, 3/8” diameter yalex, mooring line directly onto the empty spools provided for this purpose. 1 to 2 empty spools will be required per mooring. At the bottom of the final section of yalex line is the acoustic release.
Once that is brought aboard, it can be disconnected and all recovered mooring equipment secured.
Recovery is expected to take several hours, and this unit will be prepared for redeployment at the site. The redeployment of the NRS buoy may take an additional 90 -120 minutes. Because of the length of line, many positional calculations must be taken into consideration. Scientists on board will work with the captain to determine appropriate deployment strategy. The mooring will be redeployed in the reverse order from which it was recovered.
2.3 PROVISIONS
Three meals per day (breakfast, lunch, and dinner) shall be prepared by the contract vessel chief steward for the scientists. Protein shall be included at each meal. Lunch and dinner should also have two vegetables and fruit.
Milk (dairy and plant-based), coffee, tea, water, cold juice, and snacks shall be available at all times.
We anticipate the scientific staff will have diet restrictions or preferences (such as allergies; gluten free and dairy free; and perhaps vegetarian or vegan), so enough food options shall be offered so that all staff are sufficiently fortified. Meals shall be prepared during each day of vessel operation under this contract.
3.0 VESSEL REQUIREMENTS
3.1 MINIMUM VESSEL SPECIFICATIONS
1. Capable of safe operation throughout the “primary area of operation” and “possible extended area”, though we acknowledge that within our primary area of operation there are shallow areas within which we do not expect the contract vessel to be able to navigate.
2. The vessel shall have been actively used for collecting scientific data within the past 12 months and/or a track record of prior work with protected species, including marine mammals or sea turtles.
3. Sufficient deck space for one at least one research work boat (20’ LOA, with cradle) and additional sampling gear, including a 12’ inflatable raft, and bow pulpit, bringing the total length to ~36’. If the contract vessel is not providing a work boat for optional science use, then it would be preferred that there be sufficient deck space for 2 research work boats (plus the additional gear).
4. Crane or davit with minimum over-the-side SWL = 6,750lbs, for launching and recovering the work boats.
5. Clean, sanitary, and sufficiently ventilated berths with mattresses for 9-12 scientists. Bunk areas shall contain at least one drawer or closet per occupant for storage of clothing and personal gear.
6. A minimum of two heads, one shower and sink with hot water that is available to the scientific crew.
7. Sufficient potable water for all crew and scientists for the duration of the cruise.
8. Galley facilities for concurrent seating of at least 7 people.
9. Indoor storage space and table for scientific equipment and supplies, or provide one or two containers on deck to meet scientific needs.
Freezer space will be available to the scientists for storing at least 15 one-liter bottles, each measuring 10” inches tall with a diameter of 3.5”.
10. Any other equipment necessary to complete activities described in section 2.2.2
3.2 ELECTRONIC AND COMMUNICATION EQUIPMENT REQUIREMENTS
1. Radios:
a. VHF (minimum 2)
b. Single side-band
2. Radar (2 units with minimum range 40 nm)
3. GPS (minimum 2 units)
4. Plotters with capability of plotting input from GPS desirable
5. Depth sounder
6. Internet connectivity for weather forecasting, reporting, tracking satellite tags, and daily access to the internet for the chief scientist is required. If the contract vessel is not already equipped with a satellite internet system, the vessel’s company will be responsible for acquiring a system and monitoring it for the duration of the cruise so that the chief scientist has daily internet access.
3.3 CREW REQUIREMENTS
1. The Captain shall have a minimum of three years of experience as Master of a comparable- sized vessel in north Atlantic waters.
2. The Captain shall be competent in the use of modern navigational equipment.
3. At least two other members of the crew shall have a minimum of three years of sea-going experience.
4. The designated cook should have adequate experience in the planning and preparation of three daily meals at sea for appropriately sized groups of people.
5. Bidders shall include documentation indicating pertinent employment experience for each crew member indicating the requisite experience. Similar documentation will be submitted to the Contracting Officer’s Representative for approval of all replacement personnel proposed for hire during the charter.
3.4 MATERIAL CONDITION, STRUCTURAL AND WATERTIGHT INTEGRITY
The Contractor shall provide one or more of the following, reflecting the vessel’s current configuration, as evidence of the vessel being maintained in a seaworthy condition: evidence of a dry- docking survey, or underwater survey in lieu of dry-docking, and an internal structural examination within the two years prior to the initiation of the cruise; or proof of satisfactorily passing an inspection completed by the Contractors marine insurance carrier within one year of initiation of the cruise.
The Government reserves the right to inspect the vessel’s material condition with respect to maintenance of vital systems, vessel configuration, and watertight integrity prior to award and commencement of the cruises.
3.5 GOVERNMENT FURNISHED PROPERTY
Depending on the goals of the cruise, the Government will provide all or some of the following item(s) of Government property to the Contractor. The Contractor shall be accountable for, and have stewardship of, the property in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with provisions of the “Government Property” clause included in this contract.
Item No. Description Delivery Date
1 Scientific Sampling and Recording Equipment
Prior to Cruise
2 Work boat(s) with man-rated lifting harness(es)
Prior to Cruise
3 Cradle(s) for work boats Prior to Cruise
4 Capture Nets and 12’ inflatable raft for holding captured turtles.
Prior to Cruise
5 For Mammal Ecology Cruise: 400m towed hydrophone array on a wooden spool; will require transfer to an appropriate winch provided by the vessel for deployment off back deck
Prior to cruise
6 For Mammal Ecology Cruise: one pallet with sonobuoys for remote passive acoustic monitoring
Prior to cruise
7 Two 25-150 “big eye” binoculars, yokes and stands for mounting to flying bridge deck
Prior to cruise
8 CTD capable of collecting data to 1500m
Prior to cruise
9 HydroElectric Winch with 0.322 conducting cable
Prior to cruise
10 SBE Seabird CTD and Plankton nets Prior to cruise
11 Desk and chairs for sighting platform, to mount on deck for data collection area on flying bridge
Prior to cruise
4.0 ATTACHMENTS
Attachment No. 1 – Windscreen and big eye binoculars Attachment No. 2 – Vessel Characteristics Attachment No. 3 – Master/Crew Work Experience Attachment No. 4 – Vessel's Commercial Fishing History (if applicable) Attachment No. 5 – Subcontracting Plan/No Subcontracting Statement Attachment No. 6 – Code of Conduct Attachment No. 7 – Past Performance Questionnaire Attachment No. 8 – Referenced US Government electronic Code of Federal Regulations
---End Statement of Work---
Section 6 - Instructions to Offerors
ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
The following provisions are incorporated into 52.212-1 as an addendum to this solicitation:
ADDITIONAL QUOTE PREPARATION INSTRUCTIONS:
(a) General Instructions
NOTICE TO OFFERORS: Instructions for submitting offers under this solicitation must be followed. Failure to provide all information may result in the offer being considered non-responsive. Offers that are non-responsive may be excluded from further evaluation and rejected without further notification to the offeror.
(1) The offer must be prepared in two parts: A technical quote and a business/price quote. Each of the parts shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. The technical quote must not contain reference to price; however, adequate information must be contained in the technical quote so that the offeror’s technical approach is sufficiently detailed to provide a clear and concise presentation that addresses all contract requirements and demonstrates a clear understanding of the requirements.
(2) The technical quote should be typed, double-spaced, with one-inch margins, using Times New Roman size 11-font or equivalent. The technical quote shall be no more than 20 pages, including all tables and graphics but excluding resumes, index/appendices and past performance references. Picture submissions shall not exceed 20 pages and video submissions should be no more than 10 minutes in duration. There is no size limitation for business/price quotes.
(3) The offeror shall submit:
a. Technical Quote: One (1) copy, electronic required.
b. Price Quote: One (1) copy, electronic required. Each part shall be clearly marked by title.
Each part shall be clearly marked by title. There is no page limitation for the price quote.
(4) The Government will evaluate quotes in accordance with the provisions set forth in this section and with the evaluation criteria stated below.
(5) The Offerors shall identify and explain any exceptions or deviations taken to any part of the solicitation or conditional assumptions made with respect to the technical requirements of the solicitation. Offerors should note that taking exceptions to the Government’s requirements may indicate an unwillingness or inability to perform the contract, and the quote may be evaluated as such.
(b) Technical Quote Vendors shall submit the following in their technical quote:
(1) Vendor shall specify its availability preferably within August 19th timeframe for a minimum of 12 consecutive days. (e.g. Available August 19-September 5 but unavailable after that or available for any 12-date range within the survey date range).
(2) Technical capability of the item offered to meet the Government requirement: The quote shall demonstrate the offeror´s organization and plan for successfully executing the Statement of Work including demonstration of:
Evaluation Factor A—Vessel Characteristics: preparation and submission of the following attachments as well as any additional information needed to determine the vessel’s ability to meet the requirements of the Statement of Work efficiently and safely is required:
• Attachment No. 2 –Vessel Characteristics Form;
In the technical quote, narrative offers are encouraged but not required if questionnaires and other submissions cover all mandatory specification. The information should be provided as shown on the attached forms, including manufacturer’s names and model numbers where applicable. A complete explanation shall be provided where information is unavailable or not applicable. If an offeror proposes to supply equipment for the contract that they do not currently have, they must provide the specifics of the equipment such as the make, model and expected delivery time of the item, in order for the equipment to be considered in the evaluation of their proposal. Images or video showing deck and house layouts are also requested and encouraged, but not required.
Evaluation Factor B—Experience of the Vessel, Captain and Crew: The preparation and submission of the following forms, specify whether the contract vessel’s crew will be capable of independently launching and recovering the work boat(s) or whether scientists will be needed to handle lines as well as any additional information necessary to determine the required experience of the vessel crew and contractor, are required:
• Attachment No. 3 –Master/Crew Work Experience Form
• Attachment No. 4 – Vessel’s Commercial Fishing History (if applicable)
Evaluation Factor C— Subcontracting Plan: any subcontracting plan or explanation as to no subcontracting opportunities, are required
• Attachment No. 5 – Subcontracting Plan/No Subcontracting Statement
Forms shall document experience of captain, crew and vendor in the operating area stated in the Statement of Work.
Offerors shall complete the attached forms indicating pertinent employment experience for captain and proposed crew members for the previous three (3) years.
Offerors shall provide sufficient detailed information which demonstrates their technical capability, proposed technical approach, and how they plan to meet the specified requirements and supplement this data by filling out all Attachments with the option to add a narrative technical proposal.
Offerors proposing more than one vessel must submit a separate proposal for each vessel.
Pictures or videotapes will also be considered in the evaluation as well as any additional supplements to the attachments listed above.
Reference Section E below for details regarding how the Government will evaluate this factor.
(2) Evaluation Factor D: Past Performance
• Attachment No. 7 – Past Performance
The offer must include specific contract references and clearly address recently completed and related, relevant contracts (both Government and non-Government), subcontracts, and grants. The offeror should include the name of the customer, including contracting agency, address, and phone number; contract number, type of contract, and dollar value; date of contract, period of performance, and place of performance; and a brief description of contract work scope and responsibilities. Attachment No. 7, Past Performance Questionnaire, is included for your use. Provide questionnaires to all customers under similar or related contracts performed or currently being performed for at least the last 3 years or a short statement explaining the lack thereof. Include any letters or reports of work performance completed provided by a contracting agency on quality of work performed prior to submitting Attachment No. 7 to customer references. Offerors should note that the Government may make use of past performance data from any available list of customers. It is the offerors responsibility to ensure that past performance questionnaires are completed and timely returned by the offerors’ customers.
Offerors shall provide a listing of customers to which Past Performance Questionnaire forms were distributed. The list must contain the firms’ names, the representative to whom the form was provided, a telephone number of the contact and an email address. Your customers are requested to complete the Past Performance form and submit the form by fax or email directly to the Contracting Officer noted below.
If an offeror does not have a history of similar or relevant past performance, or if it is not available, it should be noted as such in the quote.
NOTE: Upon completion of the form, the customer shall return it to:
DOC, NOAA, Western Acquisition Division by email to:
Contract Officer – Amanda Rossiter, amanda.rossiter@noaa.gov
Please Note: Any Exceptional, Marginal or Unsatisfactory rating assessed by the customer on individual elements or overall rating assigned on the past performance questionnaire, shall include an explanatory narrative to be provided in the remarks block. These narratives need not be lengthy, just adequately detailed to support evidence of the specific ratings noted above. Failure to provide information supporting the assigned rating may result in a lower rating being designated than that assigned by the customer.
Offerors shall make every effort to ensure that forms are received no later than the submission date stated in the solicitation for the quote in order to be considered for evaluation of this factor. Questionnaires submitted directly by the offeror rather than by the customer may not be considered.
If an offeror does not have a history of relevant past performance, or if past performance information is not available, the offeror will receive a neutral past performance rating.
(c) Business/Price Quote Instructions
Business/Price quotes must adhere to the pricing structure established in the Price Schedule.
The quote must include a price for all Contract Line Item Numbers (CLINs).
The quote must specify the follow estimated fuel usage rates:
Estimated fuel usage per hour at maximum speed: _______speed _________ gallons Estimated fuel usage per hour at typical cruising speed: _______speed _________ gallons Estimated fuel usage per hour while on station (drifting, maneuvering, or slow transit up to 2 knots): _______ gallons
***Note: The offeror’s estimate will be used to calculate the estimated average daily cost of fuel. The current Defense Logistics Agency fuel price will be used by NOAA when calculating the estimated cost of fuel. This amount will be added to the charter price to arrive at the dollar value that will be used in evaluating offers for contract award. The overall intent of the required estimated fuel usage is for evaluation purposes. ***
Any acceptance period entered on the quote form by the offeror shall not be less than forty-five days, which shall apply if no other period is offered.
The person signing the offer must have the authority to commit the offeror to all of the provisions of the quote, fully recognizing that the Government has the right, by terms of the Solicitation, to make an award without discussion if it so elects.
The Government expects that a contract will be awarded based upon adequate price competition. However, in order to determine that offered prices are fair and reasonable, the Government reserves the right to request that the offeror to provide price breakdowns to support proposed prices. Information to support unit prices should include, but not be limited to, the following:
(A) Salary/wage information with associated payroll expenses, for personnel to be used in performance of the contract;
(B) Cost for equipment, supplies, and consumable materials;
(C) A breakout of related support costs, such as equipment maintenance, rental, transportation, etc.;
(D) Overhead costs;
(E) General Administrative expenses; and
(F) Profit
NOTICE TO OFFERORS: Instructions for submitting quotations under this request for quote must be followed. Failure to provide all information to aid in the evaluation may be considered incomplete and we may remove incomplete offers from consideration.
1. Quotes shall be fully executed and returned on the Standard Form (SF) 18 and any acknowledgements of solicitation amendments on the SF 30.
2. Submit quotations to the office specified in this solicitation at or before the time specified in the solicitation. Email quotes are required and should be sent to Amanda Rossiter, amanda.rossiter@noaa.gov.
Electronic/email quotes should be compatible with Microsoft Suite or Adobe. Due to size limitations placed on the NOAA email system, volumes of quotations may have to be sent in separate emails.
3. At a minimum the contractor shall provide the following information:
a) Point of contact name, telephone, facsimile and E-mail address.
b) Unique Entity Identifier (UEI) if vendors do not submit Offeror Representations and Certifications in accordance with FAR 52.212-3, their current SAM registration will be used.
c) Acknowledgement of registration in the System for Award Management (SAM) database
d) Identification of Authorized Negotiators, including name, telephone, facsimile and E-mail address
e) Certification that Representations and Certifications have been executed by an individual authorized to legally bind the offering firm.
Offerors are responsible for submitting quotations, and any revisions, so as to reach the office identified in Block 10 of the SF-18 by the time specified in the solicitation. The Government will not be responsible for any failure attributable to the transmission or receipt of the electronic information, including the missing of any deadlines that may be established by the process. It is the offeror’s responsibility to confirm receipt of any transmitted information.
PLEASE NOTE: Offeror(s) MUST submit pricing for each blank line item in the. Failure to offer in this manner may result in the quotation’s rejection. Pricing must reflect costs associated with the offer of one (1) vessel, per quotation submission. Offerors wishing to propose more than one vessel must submit separate offer packages for each vessel. Daily charter pricing shall be inclusive of all costs (including transit to starting port and from ending port) associated with the charter. Offerors must provide the estimated mobilization/demobilization days including transit.
(End of Provision)