This is Amendment 0001 to Solicitation 1305M226Q0212, issued by the Engineering and Advanced Development (EAD-SAP) office located in Norfolk, Virginia, with an effective date of July 24, 2026.
The amendment addresses vendor inquiries and provides clarifications on two technical specification discrepancies in Drawing 2210091, Revision A. First, Section 2.1.1.10 contains a typographical error in Table A regarding maximum output ripple specifications; the values should read 150mV Pk-Pk, 150mV Pk-Pk, and 500mV Pk-Pk, not 150V Pk-Pk, 150V Pk-Pk, and 500V Pk-Pk. Second, Section 2.1.1.11's reference to the UL 60950 safety standard has been superseded and vendors may demonstrate compliance with UL/IEC 62368-1 instead, as the latter is the current industry replacement. The amendment extends the solicitation acceptance period by five additional days to allow all quoters to review for compliance and revise submissions if necessary to reflect proper pricing for line items 0001 and 0002. All previous quoters are required to sign and return the executed Standard Form 30 as acknowledgment of these changes; failure to submit a signed modification will result in the quoter's submission being excluded from further consideration during final review.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
STEVEN PRADO
See continuation page
EAD-SAP
FED BLDG 200 GRANBY ST SUITE 815
NORFOLK VA 23510
EAD-SAP
1305M226Q0212
07/24/2026
07/24/2026
1 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M226Q0212/0001
THE PURPOSE OF THIS AMENDMENT IS TO ADDRESS
VENDOR INQUIRIES AND PROVIDE RESPONSE TO
TECHNICAL QUESTIONS PER THE PROGRAM'S DIRECT
INPUT. PLEASE SEE THE DETAILS BELOW REGARDING
VENDOR INQUIRY WITH ASSOCIATED RESPONSES FOR
REFERENCE, REVISIONS AND RESUBMISSION IF
NECESSARY.
THE SECONDARY PURPOSE OF THIS AMENDMENT IS TO
EXTEND THE SOLICITATION ACCEPTANCE PERIOD BY AN
ADDITIONAL FIVE (5) DAYS IN ORDER TO ALLOW ALL
QUOTERS TO REVIEW FOR COMPLIANCE AND/OR REVISE
AND RESUBMIT THEIR ORIGINAL SUBMISSIONS IF
NEEDED TO REFLECT THE PROPER PRICING FOR LINE
ITEMS 0001 AND 0002.
IN ADDITION, ALL PREVIOUS QUOTERS WILL BE
REQUIRED TO SIGN AND RETURN THIS AMENDMENT AS
ACKNOWLEDGEMENT OF THE REQUIRED CHANGES. ANY
SUBMISSIONS THAT DO NOT SUBMIT A SIGNED
MODIFICATION, FORM SF-30, WILL NO LONGER BE
CONSIDERED FOR FURTHER CONSIDERATION DURING THE
FINAL REVIEW PROCESS.
VENDOR INQUIRY:
Request for clarification on the following specification and schedule discrepancies:
1. Drawing Output Ripple Typo (DWG 2210091, Rev
A):
Section 2.1.1.10 specifies maximum output ripple as 1.5% of V out Pk-Pk. However, Table A in the drawing lists the values as 150V Pk-Pk, 150V Pk-Pk, and 500V Pk-Pk.
Please confirm that Table A contains a typo and the correct values are 150mV Pk-Pk, 150mV
Pk-Pk, and 500mV Pk-Pk.
PROGRAM RESPONSE: YES, this is a TYPO and should be "mV" values NOT "V"
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M226Q0212/0001
2. Safety Standard Reference (DWG 2210091, Rev
A):
Section 2.1.1.11 references compliance with UL
60950. As UL 60950 has been retired and replaced industry-wide by UL 62368-1.
Please confirm if compliance with UL / IEC
62368-1 is acceptable for this requirement.
PROGRAM RESPONSE: YES, "UL 62368-1" replaced
"UL 60950"