This is Amendment 0001 to Solicitation 1305M226Q0212, issued by the Engineering and Advanced Development (EAD-SAP) office located in Norfolk, Virginia, with an effective date of July 24, 2026.

The amendment addresses vendor inquiries and provides clarifications on two technical specification discrepancies in Drawing 2210091, Revision A. First, Section 2.1.1.10 contains a typographical error in Table A regarding maximum output ripple specifications; the values should read 150mV Pk-Pk, 150mV Pk-Pk, and 500mV Pk-Pk, not 150V Pk-Pk, 150V Pk-Pk, and 500V Pk-Pk. Second, Section 2.1.1.11's reference to the UL 60950 safety standard has been superseded and vendors may demonstrate compliance with UL/IEC 62368-1 instead, as the latter is the current industry replacement. The amendment extends the solicitation acceptance period by five additional days to allow all quoters to review for compliance and revise submissions if necessary to reflect proper pricing for line items 0001 and 0002. All previous quoters are required to sign and return the executed Standard Form 30 as acknowledgment of these changes; failure to submit a signed modification will result in the quoter's submission being excluded from further consideration during final review.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

STEVEN PRADO

See continuation page

EAD-SAP

FED BLDG 200 GRANBY ST SUITE 815

NORFOLK VA 23510

EAD-SAP

1305M226Q0212

07/24/2026

07/24/2026

1 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1305M226Q0212/0001

THE PURPOSE OF THIS AMENDMENT IS TO ADDRESS

VENDOR INQUIRIES AND PROVIDE RESPONSE TO

TECHNICAL QUESTIONS PER THE PROGRAM'S DIRECT

INPUT. PLEASE SEE THE DETAILS BELOW REGARDING

VENDOR INQUIRY WITH ASSOCIATED RESPONSES FOR

REFERENCE, REVISIONS AND RESUBMISSION IF

NECESSARY.

THE SECONDARY PURPOSE OF THIS AMENDMENT IS TO

EXTEND THE SOLICITATION ACCEPTANCE PERIOD BY AN

ADDITIONAL FIVE (5) DAYS IN ORDER TO ALLOW ALL

QUOTERS TO REVIEW FOR COMPLIANCE AND/OR REVISE

AND RESUBMIT THEIR ORIGINAL SUBMISSIONS IF

NEEDED TO REFLECT THE PROPER PRICING FOR LINE

ITEMS 0001 AND 0002.

IN ADDITION, ALL PREVIOUS QUOTERS WILL BE

REQUIRED TO SIGN AND RETURN THIS AMENDMENT AS

ACKNOWLEDGEMENT OF THE REQUIRED CHANGES. ANY

SUBMISSIONS THAT DO NOT SUBMIT A SIGNED

MODIFICATION, FORM SF-30, WILL NO LONGER BE

CONSIDERED FOR FURTHER CONSIDERATION DURING THE

FINAL REVIEW PROCESS.

VENDOR INQUIRY:

Request for clarification on the following specification and schedule discrepancies:

1. Drawing Output Ripple Typo (DWG 2210091, Rev

A):

Section 2.1.1.10 specifies maximum output ripple as 1.5% of V out Pk-Pk. However, Table A in the drawing lists the values as 150V Pk-Pk, 150V Pk-Pk, and 500V Pk-Pk.

Please confirm that Table A contains a typo and the correct values are 150mV Pk-Pk, 150mV

Pk-Pk, and 500mV Pk-Pk.

PROGRAM RESPONSE: YES, this is a TYPO and should be "mV" values NOT "V"

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1305M226Q0212/0001

2. Safety Standard Reference (DWG 2210091, Rev

A):

Section 2.1.1.11 references compliance with UL

60950. As UL 60950 has been retired and replaced industry-wide by UL 62368-1.

Please confirm if compliance with UL / IEC

62368-1 is acceptable for this requirement.

PROGRAM RESPONSE: YES, "UL 62368-1" replaced

"UL 60950"