About this file

This is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract issued by the Engineering and Acquisition Directorate (EAD-SAP) located at Federal Building 200, Granby Street, Suite 815, Norfolk, VA 23510. The amendment is numbered 0001 with an effective date of July 22, 2026, and applies to solicitation 1305M226Q0203, originally dated July 22, 2026.

The amendment addresses two primary purposes: first, to respond to vendor inquiries and provide technical clarification regarding referenced documentation, specifically ROC Drawing 2200737, Revision B, which vendors indicated was missing from the solicitation package; and second, to extend the solicitation acceptance period by an additional five (5) business days to allow all quoters to review the amendments for compliance and revise their submissions if necessary to reflect proper pricing for all required units. All previous quoters are required to sign and return the amendment as acknowledgment of the changes. Any previous submissions without a signed modification on Form SF-30 will no longer be considered in the final review process. The amendment notes that responses to vendor inquiries are provided in an associated attachment for reference. Contracting Officer Steven Prado is identified as the authorized signatory for this amendment.

View the file

Other files

File Type Posted
1 SF-30_Amendment 0002_V.1.pdf PDF
3 Drawing and Specs 2200737-B.pdf PDF
6 SOL 1305M226Q0203_V.1.pdf PDF
6 SON for RFQ_V.1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

STEVEN PRADO

See continuation page

EAD-SAP

FED BLDG 200 GRANBY ST SUITE 815

NORFOLK VA 23510

EAD-SAP

1305M226Q0203

07/22/2026

07/22/2026

1 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1305M226Q0203/0001

THE PURPOSE OF THIS AMENDMENT IS TO ADDRESS

VENDOR INQUIRIES AND PROVIDE RESPONSE TO

TECHNICAL QUESTIONS PER THE PROGRAM'S DIRECT

INPUT. PLEASE SEE THE ASSOCIATED ATTACHMENT

REGARDING VENDOR INQUIRY WITH ASSOCIATED

RESPONSES FOR REFERENCE, REVISIONS AND

RESUBMISSION IF NECESSARY.

THE SECONDARY PURPOSE OF THIS AMENDMENT IS TO

EXTEND THE SOLICITATION ACCEPTANCE PERIOD BY AN

ADDITIONAL FIVE (5) BUSINESS DAYS IN ORDER TO

ALLOW ALL QUOTERS TO REVIEW FOR COMPLIANCE

AND/OR REVISE AND RESUBMIT THEIR ORIGINAL

SUBMISSIONS IF NEEDED TO REFLECT THE PROPER

PRICING FOR ALL REQUIRED UNITS.

IN ADDITION, ALL PREVIOUS QUOTERS WILL BE

REQUIRED TO SIGN AND RETURN THIS AMENDMENT AS

ACKNOWLEDGEMENT OF THE REQUIRED CHANGES. ANY

PREVIOUS SUBMISSIONS THAT DO NOT SUBMIT A

SIGNED MODIFICATION, FORM SF-30, WILL NO LONGER

BE CONSIDERED FOR FURTHER CONSIDERATION DURING

THE FINAL REVIEW PROCESS.

VENDOR INQUIRY:

The Statement of Need references ROC Drawing 2200737, Revision B; however, the drawing does not appear to be included in the solicitation package. Could you please provide the complete drawing or Source Control Document, including the physical dimensions, connector locations, and applicable tolerances?

VENDOR RESPONSE: PLEASE SEE ATTACHED.

File details come from the government source that posted it. Updated .