This Statement of Work (SOW) describes a propane furnish and delivery contract for the NOAA Cooperative Oxford Laboratory in Oxford, Maryland. The contractor must provide continuous, uninterrupted propane fuel supply to the 18,000 square-foot research facility, which operates three 1,000-gallon propane tanks used for the facility boiler and generators. Average annual propane consumption is approximately 9,000 gallons, varying by winter temperatures. The contractor shall furnish and deliver propane on an as-needed basis, with the Facility Operations Specialist requesting deliveries once tanks register 40-50% capacity during winter months. Deliveries must prevent the facility from running out of fuel throughout the contract period.
The contractor must provide a "not to exceed" price cap for up to 9,000 gallons of propane over the contract period and maintain tanks with required propane identification and safety labels. The contractor is responsible for all trained personnel, safety compliance, proper handling and delivery procedures, and itemized billing by usage location. All work must conform to NOAA's Environmental Management System, utilizing environmentally responsible and friendly procedures, services, and products. The contract period runs from September 22, 2026 to September 21, 2027 (base period), with four optional one-year extension periods extending through September 21, 2031. The technical point of contact is Kevin Means, Facility Operations Specialist, at kevin.means@noaa.gov, with the place of acceptance at 904 South Morris Street, Oxford, Maryland 21654.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1305M226Q0085.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0 - BACKGROUND
Furnish and Delivery of Propane Cooperative Oxford Laboratory
Oxford, MD
The NOAA, National Ocean Service, National Centers for Coastal Ocean Science (NCCOS) Cooperative Oxford Laboratory (COL) 904 South Morris Street, Oxford, MD 21654 operates an approximate 18,000 sq. ft. research facility with three 1,000-gallon propane tanks that provide fuel to the facility boiler and facility generators. Propane tanks are owned by COL and are in good condition.
All furnished products shall be in conformance with all applicable federal, state, and local regulations and the NOAA Environmental Management System (see below).
2.0 – PURCHASE DESCRIPTION
The Contractor shall on an as needed basis furnish and deliver propane to 904 South Morris Street, Oxford MD to prevent the facility from running out of fuel at any time throughout the contract period.
The contractor shall furnish and deliver propane for efficient and safe burning of the fuel by facility equipment. Average propane usage is approximately 9,000 gallons per year depending on winter temperatures. The Federal Government shall not provide any labor or components to fulfill the terms of this contract.
3.0 - OBJECTIVES - GENERAL REQUIREMENTS
- Contractor shall provide a continuous uninterrupted supply of propane fuel for delivery and safe use of propane fuel by the NOAA Cooperative Oxford Laboratory.
4.0 - REQUIREMENTS
- Contractor shall provide a “not to exceed” price cap for the purchase of up to 9,000 gallons of propane over the course of the contract period.
- Contractor shall furnish and deliver up but, not to exceed 9,000 gallons of propane during high use winter months and on an as needed basis throughout the contract period based upon usage to prevent the facility from running out of propane. As needed, the Facility Operations Specialist will call to request a delivery once tanks register 40-50% capacity during the winter period.
- Contractor shall maintain tanks to display required Propane identification and associated safety labels.
- Contractor shall observe all safety requirements for the proper handling, delivery, and use of propane fuel.
- Contractor shall provide itemized billing of fuel by usage location (tank number, main lab, generator, etc.)
5.0 – REQUIRED QUALIFICATIONS
- The Contractor shall provide trained personnel with hands-on experience in safely and efficiently filling propane tanks, ensuring compliance with all relevant industry standards, including proper valve handling, pressure testing, and adherence to local safety regulations.
6.0 - SPECIAL REQUIREMENTS - CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT
SYSTEMS
- As an environmental organization, NOAA has developed an Environmental Management System (EMS) to guide day-to-day work practices and planning for staff, volunteers, visitors, contractors and vendors. The contractor shall accomplish all work under this contract in such a way as to minimize the potential of environmental impact by operating in an environmentally responsible manner and to the extent possible using environmentally friendly procedures, services, and products.
7.0 - PLACE OF ACCEPTANCE
- Cooperative Oxford Laboratory 904 S Morris St, Oxford, MD 21654
8.0 – TECHNICAL POINT OF CONTACT
- Facility Operations Specialist, Kevin Means at kevin.means@noaa.gov
9.0 – DELIVERABLES
- Contractor shall provide goods as outlined in the statement of work, including maintaining proper and readable safety labeling of all tanks as part of the annual fixed-price contract. The Federal Government shall not provide any labor or components to fulfill the terms of this contract.
10.0 - PERIOD OF PERFORMANCE
- Base Period – September 22, 2026 to September 21, 2027.
- Option Period 1 – September 22, 2027 to September 21, 2028
- Option Period 2 – September 22, 2028 to September 21, 2029
- Option Period 3 – September 22, 2029 to September 21, 2030
- Option Period 4 – September 22, 2030 to September 21, 2031 mailto:kevin.means@noaa.gov
| 1.0 - BACKGROUND |
| 2.0 – PURCHASE DESCRIPTION |
| 3.0 - OBJECTIVES - GENERAL REQUIREMENTS |
| 4.0 - REQUIREMENTS |
| 5.0 – REQUIRED QUALIFICATIONS |
| 6.0 - SPECIAL REQUIREMENTS - CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS |
| 7.0 - PLACE OF ACCEPTANCE |
| 8.0 – TECHNICAL POINT OF CONTACT |
| 9.0 – DELIVERABLES |
| 10.0 - PERIOD OF PERFORMANCE |