This is an Appendix containing photographs that document lighting installation and repair requirements at a federal facility in the Florida Keys. The document uses visual references to support contract specifications for LED lighting upgrades across multiple locations.
The appendix details comprehensive lighting work at two primary facilities: the Administrative office building and the Florida Keys Eco Discovery Center (EDC). Exterior work includes installing full-range security lights on the admin building roof to cover surrounding landscape and prevent trespassing; installing four LED lights on the admin patio using existing electrical systems; repairing or replacing two pole lights in the EDC parking lot; replacing eight ground lights on the street-side EDC wall; installing four LED bullet flood lights for EDC sign lighting with wiring; replacing three ground lights on the EDC path to the marina; repairing or replacing five solar LED pole lights adjacent to the dock area; and installing a programmable outdoor wall LED lighting system on the EDC northeast side with required wiring. Interior work encompasses replacing three overhead recessed lights at the admin lobby door; replacing one overhead recessed light at the admin delivery door; replacing two lights at the admin dive room door; installing three overhead recessed lights at the admin back door with roof electrical system wiring; repairing or replacing two LED recessed safety lights at the exterior stairwell; replacing three wall packs at the workshop; replacing two overhead recessed lights at the EDC side door; replacing three lights at the EDC back door area; repairing or replacing interior LED cove lighting in the EDC hallway and both bathrooms; repairing up to 20 can lighting fixtures in both buildings; and repairing or replacing four interior industrial hanging warehouse lights. All exterior lighting modifications must utilize existing electrical systems where available, with wiring required for new installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1305M226Q0060.pdf | ||
| 1305M226Q0060_-_Statement_of_Work.pdf | ||
| SCA_2015-4583_Rev_31_dtd_12-03-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix - PHOTOS
Admin office building roof lights - Install full range security lights using existing electrical system to cover the entire surrounding landscape area to mitigate trespassing and concealment of individuals.
Admin office building roof lights – install four (4) LED lights illuminating patio area using existing electrical system
EDC parking lot – repair or replace two (2) pole lights with LED
Street-side EDC wall– repair and replace eight (8) ground lights with LED
EDC sign lighting – install four (4) LED bullet flood lights – wiring required
EDC path lights to marina – replace three (3) ground lights with LED
Admin bldg. lobby door – repair and replace three (3) overhead recessed lights with LED
Admin bldg. delivery door – replace one (1) overhead recessed light with LED
Admin bldg. dive room door (two lights) – repair and replace two (2) lights with LED
Admin bldg. back door – install three (3) overhead recessed lights
– wiring required to tie into rooftop electrical system
Admin bldg. exterior stairwell – repair or replace two (2) LED recessed safety lights
Workshop door and workshop yard area – replace three (3) wall packs with LED
EDC side door (to Admin bldg.) – replace two (2) overhead recessed lights with LED
EDC back door area – replace three (3) lights with LED
Install programmable outdoor wall LED lighting system on the northeast side of the Florida Keys Eco Discovery Center building (wall adjacent to EDC parking lot).
There are fixtures and conduit installed, but no electricity. Wiring required
Repair or replace the five (5) solar LED pole lights adjacent to dock area, to illuminate the docks and prevent concealment and tampering of NOAA property.
Repair or replace interior LED cove lighting and fixtures in hallway at the Florida Keys Eco Discovery Center.
Repair or replace interior LED cove lighting and fixtures in bathroom 1 and bathroom 2 of the Florida Keys Eco Discovery Center
Repair up to 20 can lighting fixtures that are installed in administrative building and EDC.
Repair or replace four interior industrial hanging warehouse lights
| Appendix - PHOTOS� |
| Admin office building roof lights - Install full range security lights using existing electrical system to cover the entire surrounding landscape area to mitigate trespassing and concealment of individuals. |
| Admin office building roof lights – install four (4) LED lights illuminating patio area using existing electrical system� |
| EDC parking lot – repair or replace two (2) pole lights with LED� |
| Street-side EDC wall– repair and replace eight (8) ground lights with LED � |
| EDC sign lighting – install four (4) LED bullet flood lights – wiring required� |
| EDC path lights to marina – replace three (3) ground lights with LED |
| Admin bldg. lobby door – repair and replace three (3) overhead recessed lights with LED� |
| Admin bldg. delivery door – replace one (1) overhead recessed light with LED |
| Admin bldg. dive room door (two lights) – repair and replace two (2) lights with LED� |
| Admin bldg. back door – install three (3) overhead recessed lights – wiring required to tie into rooftop electrical system� |
| Admin bldg. exterior stairwell – repair or replace two (2) LED recessed safety lights |
| Workshop door and workshop yard area – replace three (3) wall packs with LED � |
| EDC side door (to Admin bldg.) – replace two (2) overhead recessed lights with LED� |
| EDC back door area – replace three (3) lights with LED� |
| Install programmable outdoor wall LED lighting system on the northeast side of the Florida Keys Eco Discovery Center building (wall adjacent to EDC parking lot). �There are fixtures and conduit installed, but no electricity. Wiring required |
| Repair or replace the five (5) solar LED pole lights adjacent to dock area, to illuminate the docks and prevent concealment and tampering of NOAA property.� |
| Repair or replace interior LED cove lighting and fixtures in hallway at the Florida Keys Eco Discovery Center. � |
| Repair or replace interior LED cove lighting and fixtures in bathroom 1 and bathroom 2 of the Florida Keys Eco Discovery Center |
| Repair up to 20 can lighting fixtures that are installed in administrative building and EDC. |
| Repair or replace four interior industrial hanging warehouse lights |