QA_1305M224Q0339_0001.pdf
PDF 136 KB Posted
- Attached to
- FY24 HIHW Kihei HVAC Maintenance
- Solicitation number
- 1305M224Q0339
About this file
This document contains a set of questions and answers (Q&A) related to Solicitation Number 1305M224Q0339 for FY24 HIHW Kihei HVAC Maintenance. The solicitation is for a contractor to perform quarterly maintenance on all air conditioning units located at the Visitor's Center, Conference Building, and Wet Lab Building. The key details include:
The maintenance team is required to be available during site working hours (0800-1600 M-F) but not on-call 24/7 for emergency repairs. The contractor is not required to provide a physical barrier or fence, but must clearly indicate the work area to ensure safety. The period of performance is one year from the date of award, with quarterly services over the course of the year. Pricing should be provided for the complete 1-year job, not per quarter. The solicitation is issued by the Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), a civilian agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A for 1305M224Q0308
1. Will the maintenance team need to be on call 24/7 in case of emergency repairs?
a. Availability during site working hours will suffice (0800-1600 M-F)
2. Will you provide a fence to close off the area of work? In the SOW on p.g 2, paragraph 1, it says
" The area around the building and where the contractor will be working should be closed off".
a. Closed off means having a clear indication that work is being done in the area. This includes a spotter if there is ladder work, a physical presence where the work is being done, or temporary measures (we have cones on site available) to guide foot traffic around the work site. It does not mean a physical barrier needs to be in place but that there is a clear indication of work so that it does not pose a safety risk to personnel and the general public.
3. What is the period of performance? Will this be for every quarter for the next year or for the next 4 years?
a. The total POP is one year from date of award. The requirement is for quarterly services over the course of a year.
4. In the RFQ it says how the quantity is 1, does that mean I provide pricing for one entire year ( 4 quarters)? Or do I put the price for each quarter in unit price and multiply that price by 4 to be able to put it in the total price?
a. The quantity is stated as “1 JB” so pricing should be for the complete job as described in the SOW. 1 price for the entirety- i.e. quarterly service over the course of 1 year. (So yes, the price should be the full cost of the 1 year).