This solicitation seeks proposals for multiple indefinite-delivery indefinite-quantity contracts to provide environmental field services to the National Oceanic and Atmospheric Administration's Center for Oceanographic Products and Services. The solicitation anticipates awarding six IDIQ contracts, with three reserved for small businesses. Services will be ordered through task orders issued over a ten-year period from October 2023 through September 2033. Pricing will be on a hybrid firm-fixed-price and time-and-materials basis. The North American Industry Classification System code is 811210 for electronic and precision equipment repair and maintenance. The small business size standard is $30 million in average annual revenue. Proposals are due by February 6, 2023. Award is expected within 365 days thereafter.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFEROR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN

OFFER(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 6/2014)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

1 94

NC-NT2000-22-00571

Kasey Oehler Kasey.Oehler@noaa.gov 757-605-7407

NOAA, EAD, 200 Granby Street, Suite 815 Norfolk, VA 23510

1305M223RNCNT0001

One (1) N/A 10:00 am

Kasey Oehler See block 8

7-8 9 92-94

82-91

10-55

2/6/2023

757 6057407

1/3/2023

57-81

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

This acquisition will be competed on a full and open basis with a goal of reserving three (3) awards for small businesses utilizing FAR Part 15, Contracting by Negotiation and FAR Part 12, Acquisition of Commercial Products and Commercial Services.

Multiple hybrid firm-fixed-price (FFP) and time-and-materials (T&M) Indefinite-Delivery Indefinite- Quantity (IDIQ) contracts are anticipated. NOAA anticipates awarding six (6) contract awards.

The North American Industry Classification System (NAICS) code for this acquisition is 811210, Electronic and Precision Equipment Repair and Maintenance. The small business size standard is $30 million.

Solicitation inquiries shall be received no later than 10:00AM Eastern, January 13, 2023 and must be sent to Kasey Oehler at Kasey.Oehler@noaa.gov and Stacy F. Dohse at Stacy.Dohse@noaa.gov and include the following subject description: “1305M223RNCNT0001 Environmental Field Services (Name of Offeror)”

Proposals shall be submitted to both the Contracting Officer (CO), Stacy F. Dohse, and the Contract Specialist (CS), Kasey Oehler, via email at Kasey.Oehler@noaa.gov no later than 10:00AM Eastern, February 6, 2023.

Pricing shall be submitted using Attachment J.2 Schedule of Items and Prices

END OF SECTION B

mailto:Kasey.Oehler@noaa.gov mailto:Stacy.Dohse@noaa.gov mailto:Kasey.Oehler@noaa.gov

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

The Contractor shall furnish the necessary personnel, materials, equipment, services and facilities (except as otherwise specified) to perform the Performance Work Statement (PWS) referenced as an attachment in Section J, Attachment J.1. Each Task Order will have its own specific work statement.

END OF SECTION C

SECTION D – PACKAGING AND MARKING

This Section is not applicable.

END OF SECTION D

SECTION E – INSPECTION AND ACCEPTANCE

E.1. COMMERCE ACQUISITION REGULATION (CAR) 1352.246-70 PLACE OF

ACCEPTANCE (APR 2010)

(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract.

(b) The place of acceptance will be:

NOAA/NOS/CO-OPS

672 Independence Parkway Chesapeake, VA 23320

END OF SECTION E

SECTION F – DELIVERIES OR PERFORMANCE

F.1. FEDERAL ACQUISITION REGULATION (FAR) 52.252-2 CLAUSES

INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

Federal Acquisition Regulation (FAR)-https://www.acquisition.gov/browse/index/far

Clause No. Clause Title Date FAR 52.242-15 Stop Work Order AUG 1989

F.2. NOAA ACQUISITION MANUAL (NAM) 1330-52.215-70 SCHEDULE OF

DELIVERABLES

Following is a schedule of all deliverables, including administrative deliverables, required during the period of performance of this contract:

Item Description Quantity Due Date Deliver To Reference 1 Insurance Certificate 1 Within five (5) days of award

CS CAR 1352.228-70

2 Sexual Assault and Sexual Harassment Prevention and Response Training Certificates

1 each Within 30 days of award or date a contractor employee is assigned to perform under the contract

COR and

CS

NAM

1330-52.222-70

3 SF 294, Subcontracting Report

1 See I.1 (FAR 52.219-9)

COR and

CS

FAR 52.219-9

4 Information Technology (IT) Security Orientation Training Certification

1 each Within five (5) days of award

COR and

CS

CAR 1352.239-72

6 Release of Claims 1 each Upon completion of each Task Order

CO and CS

7 Signed Contractor Acknowledgement of Restrictions Against Disclosure

1 Within five (5) days of award

COR CAR 1352.209-72 and 1352.239-72(g)

Other deliverables will be identified at the Task Order level.

END OF SECTION F

https://www.acquisition.gov/browse/index/far

SECTION G – CONTRACT ADMINISTRATION DATA

G.1. CAR 1352.237-74 PROGRESS REPORTS (APR 2010)

The contractor shall submit, to the Government, a progress report for each Task Order every To Be Determined at Task Order Level after the effective date of the Task Order, and every To Be Determined at Task Order Level thereafter during the period of performance. The contractor shall deliver progress reports that summarize the work completed during the performance period, the work forecast for the following period, and state the names, titles and number of hours expended for each of the contractor's professional personnel assigned to the contract, including officials of the contractor. The report shall also include any additional information - including findings and recommendations - that may assist the Government in evaluating progress under this contract. The first report shall include a detailed work outline of the project and the contractor's planned phasing of work by reporting period.

G.2. NAM 1330-52.270-304 NOAA ACQUISITION AND GRANTS OFFICE OMBUDSMAN

(OCT 2016)

(a) The NOAA Acquisition and Grants Office (AGO) Ombudsman is available to organizations to promote responsible and meaningful exchanges of information. Generally, the purpose of these exchanges will be to:

1. Allow contractors to better prepare for and propose on business opportunities.

2. Advise as to technologies and solutions within the marketplace that the Government may not be aware of, or is not fully benefiting.

3. Identify constraints in transparency.

(b) The AGO Ombudsman will objectively, reasonably, and responsibly collaborate with parties and recommend fair, impartial, and constructive solutions to the matters presented to him/her.

Further, the AGO Ombudsman will maintain the reasonable and responsible confidentiality of the source of a concern, when such a request has been formally made by an authorized officer of an organization seeking to do business with, or already doing business with NOAA.

(c) Before consulting with the AGO Ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations with the respective contracting officer for resolution. However, direct access to the AGO Ombudsman may be sought when an interested party questions the objectivity or equity of a contracting officer’s decision, or when there is a bona fide reason to believe that reasonable, responsible, and objective consideration will not be received from an assigned contracting officer.

(d) There are several constraints to the scope of the AGO Ombudsman’s authority, for instance:

1. Consulting with the AGO Ombudsman does not alter or postpone the timelines of any formal process (e.g., protests, claims, debriefings, employee employer actions, activities involving A76 competition performance decisions, judicial or congressional hearings, or proposal, amendment, modification or deliverable due dates).

2. The AGO Ombudsman cannot participate in the evaluation of proposals, source selection processes, or the adjudication of protests or formal contract disputes.

3. The AGO Ombudsman is not authorized to generate or alter laws, judicial decisions, rules, policies, or formal guidance.

4. The AGO Ombudsman is not authorized to develop or alter opportunity announcements, solicitations, contracts, or their terms or conditions.

5. The AGO Ombudsman cannot overrule the authorized decisions or determinations of the contracting officer.

6. The AGO Ombudsman has no authority to render a decision that binds AGO, NOAA, the

Department of Commerce, or the U.S. Government.

7. The AGO Ombudsman is not NOAA’s agent relative to the service of magistrate or judicial process and cannot be used to extend service of process to another party (whether federal, public, or a private entity).

(e) After review and analysis of a filed concern or recommendation, the AGO Ombudsman may refer the interested party to another more suitable Federal official for consideration. Moreover, concerns, disagreements, and/or recommendations that cannot be resolved by the AGO Ombudsman will need to be pursued through more formal venues.

(f) The AGO Ombudsman is not to be contacted to request copies of forms and/or documents under the purview of a contracting officer. Such documents include Requests for Information, solicitations, amendments, contracts, modifications, or conference materials.

(g) Questions regarding items (a) through (f) within this language shall be directed to the NOAA AGO Ombudsman, at ago.ombudsman@noaa.gov.

END OF SECTION G

mailto:ago.ombudsman@noaa.gov

SECTION H – SPECIAL CONTRACT REQUIREMENTS

The total number of IDIQ contracts held may fluctuate due to any number of reasons, including, but, not limited to, competition levels on Task Orders; mergers and acquisitions; and the Government's exercise of the on-ramp and off-ramp processes.

On-Ramping It is in the Government’s best interest that an adequate number of contractors remain eligible to compete for Task Orders to meet the Government’s mission requirements. Contractors are hereby notified that utilization of any on-ramping procedure below does not obligate the Government to perform an on-ramping procedure. Furthermore, any on-ramping procedure may be performed at any time.

The CO reserves the unilateral right to determine whether it would be in the Government’s best interest to initiate an open season to on-ramp additional contractors to the IDIQ pool at any time, subject to the following conditions:

1. An open season notice is published in SAM.gov in accordance with FAR Part 5, Publicizing Contract Action.

2. An open season solicitation is issued under current Federal procurement law.

3. The solicitation identifies the total anticipated number of new contracts that NOAA intends to award.

4. Any offeror that meets the eligibility requirements set forth in the open season solicitation may submit a proposal in response to the solicitation.

5. The award decision under the open season solicitation is based upon substantially the same evaluation factors as the original solicitation.

6. The terms and conditions of any resulting awards are materially identical to the existing version of the IDIQ contracts.

7. The period of performance term for any new awards is coterminous with the existing term for all other IDIQ contracts within the pool. Immediately upon on-ramping, new IDIQ contract holders are eligible to submit a quotation in response to any Task Order solicitation and receive Task Order awards with the same rights and obligations as any other contractor.

Off-Ramping The CO reserves the unilateral right to off-ramp contractors. Contractors that are off-ramped must have no active Task Orders at the time of the off-ramping. Off-ramping methods may result from one (1) of the following conditions:

1. Debarment, Suspension, or Ineligibility as defined in FAR Subpart 9.4.

2. Termination as defined in FAR Part 49.

3. In compliance with FAR 19.301-2(b)(1), Contractors who no longer qualify as a small business after rerepresentation as required within 30 days after execution of a novation agreement or within 30 days after a merger or acquisition of the contractor that does not require a novation agreement, and within 60 to 120 days prior to the end of the fifth year of the contract.

4. Contractors who fail to meet the standards of performance, deliverables, or compliances.

5. Taking any other action that is not permitted under this contract’s terms and conditions.

END OF SECTION H

SECTION I – CONTRACT CLAUSES

I.1. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

Federal Acquisition Regulation (FAR) -

Commerce Acquisition Regulation (CAR) – https://www.acquisition.gov/car

Clause No. Clause Title Date FAR 52.202-1 Definitions JUN 2020 FAR 52.203-3 Gratuities APR 1984 FAR 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

FAR 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights.

JUN 2020

FAR 52.204-4 Printed Or Copied Double-Sided On Postconsumer Fiber Content Paper

MAY 2011

FAR 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 FAR 52.204-13 System For Award Management Maintenance OCT 2018 FAR 52.204-18 Commercial And Government Entity Code Management AUG 2020 FAR 52.209-10 Prohibition on Contracting with Inverted Domestic

Corporations

NOV 2015

FAR 52.215-8 Order of Precedence- Uniform Contract Format OCT 1997 FAR 52.227-1 Authorization and Consent JUN 2020 FAR 52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement

JUN 2020

FAR 52.228-5 Insurance- Work on a Government Installation JAN 1997 FAR 52.232-1 Payments APR 1984 FAR 52.232-7 Payments Under Time-and-Materials and Labor-Hour

Contracts

NOV 2021

FAR 52.232-8 Discounts for Prompt Payment FEB 2002 FAR 52.232-11 Extras APR 1984 FAR 52.232-17 Interest MAY 2014 FAR 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 FAR 52.232-40 Providing Accelerated Payments To Small Business

Subcontractors

NOV 2021

FAR 52.237-2 Protection of Government Buildings, Equipment, and Vegetation

APR 1984

FAR 52.242-13 Bankruptcy JUL 1995 FAR 52.243-3 Changes- Time-and-Materials or Labor-Hours SEPT 2000 FAR 52.244-2 Subcontracts JUN 2020 https://www.acquisition.gov/car

FAR 52.245-9 Use and Charges APR 20212 FAR 52.248-1 Value Engineering JUN 2020 CAR 1352.201-70 Contracting Officer's Authority APR 2010 CAR 1352.208-70 Restrictions on Printing and Duplicating APR 2010 CAR 1352.209-73 Compliance With The Laws APR 2010 CAR 1352.209-74 Organizational Conflict of Interest APR 2010 CAR 1352.216-74 Task Orders APR 2010 CAR 1352.228-72 Deductibles Required Under Insurance Coverage- Fixed

Price

APR 2010

CAR 1352.231-71 Duplication of Effort APR 2010 CAR 1352.239-72 Security Requirements for Information Technology

Resources

APR 2010

CAR 1352.242-70 Postaward Conference APR 2010

I.2. FAR 52.204-21 BASIC SAFEGUADING OF COVERED CONTRACTOR

INFORMATION (NOV 2021)

(a) Definitions. As used in this clause—

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information ( 44 U.S.C.

3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

I.3. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS- COMMERICAL PRODUCTS

AND COMMERCIAL SERVICES (NOV 2021) ALT I

(a) Inspection/Acceptance.

(1) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government will perform inspections and tests in a manner that will not unduly delay the work.

(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.

(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements.

Except as otherwise specified in paragraph (a)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken.

(5)

(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may-

(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or

(B) Terminate this contract for cause.

(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.

(6) Notwithstanding paragraphs (a)(4) and (5) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the

Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to-

(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or

(ii) The conduct of one or more of the Contractor’s employees selected or retained by the Contractor after any of the Contractor’s managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.

(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.

(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act ( 31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions.

(1) The clause at FAR 52.202-1, Definitions, is incorporated herein by reference. As used in this clause-

(i) "Direct materials" means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.

(ii) "Hourly rate" means the rate(s) prescribed in the contract for payment for https://www.acquisition.gov/far/part-52#FAR_52_202_1 labor that meets the labor category qualifications of a labor category specified in the contract that are-

(A) Performed by the contractor;

(B) Performed by the subcontractors; or

(C) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

(iii) "Materials" means-

(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;

(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;

(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);

(D) The following subcontracts for services which are specifically excluded from the hourly rate: N/A; and

(E) Indirect costs specifically provided for in this clause.

(iv) "Subcontract" means any contract, as defined in FAR subpart 2.1, entered into with a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

https://www.acquisition.gov/far/part-2#FAR_Subpart_2_1

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232- 34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act ( 31 U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payments.

(1) Work performed. The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Contracting Officer:

(i) Hourly rate.

(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed.

Fractional parts of an hour shall be payable on a prorated basis.

(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.

(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.

(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualifications for the labor categories specified in the contract, or other substantiation specified in the contract.

(E) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis.

(1) If no overtime rates are provided in the Schedule and the Contracting Officer approves overtime work in advance, overtime rates shall be negotiated.

(2) Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract.

(3) If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.

(ii) Materials.

(A) If the Contractor furnishes materials that meet the definition of a commercial product at FAR 2.101, the price to be paid for such materials shall not exceed the Contractor’s established catalog or market price, adjusted to reflect the-

(1) Quantities being acquired; and

(2) Any modifications necessary because of contract requirements.

(B) Except as provided for in paragraph (i)(1)(ii)(A) and (D)(2) of this clause, the Government will reimburse the Contractor the actual cost of materials (less any rebates, refunds, or discounts received by the contractor that are identifiable to the contract) provided the Contractor-

(1) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or

(2) Makes these payments within 30 days of the submission of the Contractor’s payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.

(C) To the extent able, the Contractor shall-

(1) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials;

and

(2) Give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that are identifiable to the contract.

(D) Other Costs. Unless listed below, other direct and indirect costs will not be reimbursed.

(1) Other Direct Costs. The Government will reimburse the Contractor on the basis of actual cost for the following, provided such costs comply with the requirements in paragraph (i)(1)(ii)(B) https://www.acquisition.gov/far/part-2#FAR_2_101 of this clause: Each order must separately list the elements of other direct charge(s) for that order.

(2) Indirect Costs (Material Handling, Subcontract Administration, etc.). The Government will reimburse the Contractor for indirect costs on a pro-rata basis over the period of contract performance at the following fixed price: Each order must list separately the fixed amount for the indirect costs and payment schedule.

(2) Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during the performance of this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performance of this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.

(3) Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.

(4) Access to records. At any time before final payment under this contract, the Contracting Officer (or authorized representative) will have access to the following (access shall be limited to the listing below unless otherwise agreed to by the Contractor and the Contracting Officer):

(i) Records that verify that the employees whose time has been included in any invoice meet the qualifications for the labor categories specified in the contract;

(ii) For labor hours (including any subcontractor hours reimbursed at the hourly rate in the schedule), when timecards are required as substantiation for payment-

(A) The original timecards (paper-based or electronic);

(B) The Contractor’s timekeeping procedures;

(C) Contractor records that show the distribution of labor between jobs or contracts; and

(D) Employees whose time has been included in any invoice for the purpose of verifying that these employees have worked the hours shown on the invoices.

(iii) For material and subcontract costs that are reimbursed on the basis of actual cost-

(A) Any invoices or subcontract agreements substantiating material costs;

and

(B) Any documents supporting payment of those invoices.

(5) Overpayments/Underpayments. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding invoices, that are found by the Contracting Officer not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. The Contractor shall promptly pay any such reduction within 30 days unless the parties agree otherwise. The Government within 30 days will pay any such increases, unless the parties agree otherwise. The Contractor’s payment will be made by check. If the Contractor becomes aware of a duplicate invoice payment or that the Government has otherwise overpaid on an invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6)

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury, as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, and then at the rate applicable for each six month period as established by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final Decisions. The Contracting Officer will issue a final decision as required by 33.211 if-

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt in a timely manner;

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-33#FAR_33_211

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(viii) Upon receipt and approval of the invoice designated by the Contractor as the "completion invoice" and supporting documentation, and upon compliance by the Contractor with all terms of this contract, any outstanding balances will be paid within 30 days unless the parties agree otherwise. The completion invoice, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 1 year (or such longer period as the Contracting Officer may approve in writing) from the date of completion.

(7) Release of claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions.

(i) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible to exact statement by the Contractor.

(ii) Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the https://www.acquisition.gov/far/part-32#FAR_32_607_2 https://www.acquisition.gov/far/part-32#FAR_32_608_2

Contractor that the Government is prepared to make final payment, whichever is earlier.

(iii) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.

(8) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(9) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(10) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid an amount for direct labor hours (as defined in the Schedule of the contract) determined by multiplying the number of direct labor hours expended before the effective date of termination by the hourly rate(s) in the contract, less any hourly rate payments already made to the Contractor plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system that have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate https://www.acquisition.gov/far/part-52#FAR_52_212_5 assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law.

If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C.