1305M223QNMAN01727_A0005.pdf
PDF 1 MB Posted
- Attached to
- Telescoping Crane for the NOAA Ship Nancy Foster
- Solicitation number
- 1305M223QNMAN01727
About this file
This document is an amendment to a solicitation for the construction and installation of a telescoping crane for the NOAA Ship Nancy Foster. The National Oceanic and Atmospheric Administration (NOAA) within the Department of Commerce is seeking responses to Solicitation Number 1305M223QNMAN01727 for a telescoping crane that meets ABS standards and the geometric specifications required for the NOAA Ship Nancy Foster. The amendment provides responses to inquiries from interested parties and includes a requested drawing. The response deadline and award timing are not specified. The amendment does not address any pricing terms, set asides, incumbent contractors, or other salient details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PAGE OF PAGES
I
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE I
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) SA. AMENDMENT OF SOLICITATION NUMBER
□ SB. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
D The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended. D is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning _____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor D is not D is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item SA or 1 OA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)
STANDARD FORM 30 (REV.11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
…continued from Block 14.
1. Question: Is this intended to be a shipboard crane (lifts in harbor conditions or sheltered waters) or an offshore crane (lifts in higher sea states)?
Answer:
a. For a shipboard crane, the noted capacity and outreach of 6,000 pounds and 42 feet is acceptable, and answers to b, below, are unnecessary.
Answer: This is a shipboard crane.
b. If an offshore crane, depending on the significant wave heights (SWH) and types of lift, ABS requires that the crane be de-rated, so we need the following information:
SWL (loads to be lifted – safe working load)
Offshore: Onboard lifts SWH:
Offshore: Offboard lifts SWH:
Offshore: Subsea lifts, water depth:
Answer: This is not applicable.
2. Question: Operating Temperatures: Minimum/maximum
Answer: Minimum – 0 degrees Fahrenheit
Maximum – 115 degrees Fahrenheit
3. Question: Maximum wind speed anticipated during crane operations
Answer: 20 knots
4. Question: Please confirm that API 2C design is required. If yes, please provide the following information:
Answer: This is a shipboard crane and the following paragraphs do not apply.
a. If it is an Offshore Crane, what is the duty cycle:
Production
Intermediate
Construction
b. Elevation from heel pin to mounting deck and from mounting deck to mean sea level
(MSL):
c. Crane calculation and ratings method:
General method
Vessel-specific method
Legacy dynamic method
5. Question: Is a vessel GA (general arrangement) drawing available? If yes, it will be most helpful to have a copy in order to comply with items 1b and 4 above.
Answer: Drawing is available and is attached to this amendment.
CONTRACT #
NOAA DRAWING NUMBER REVSIZE
SCALE: CAD FILENAME SHT OF
CAGE CODE
DSGN
DWN
CHK
CHK
NOAA APPROVAL
D
C
B
A
C
B
D
A
Seaworthy Systems, Inc.
MARINE ENGINEERS
NAVAL ARCHITECTS TEL: (860) 767-9061
ESSEX, CT 06426
P.O. BOX 965
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
OFFICE OF MARINE & AVIATION OPERATIONS
NOAA SHIP NANCY FOSTER
BOOKLET OF GENERAL PLANS
50-ABNA-0-00032
TAR-SSI-021-(02)
NF-085-001 CD
AS SHOWN NF085001-1A 1 7
OYLJ5
JEK
12/03/02
DAR
12/03/02
1. THIS BOOKLET OF GENERAL PLANS WAS DEVELOPED UNDER TAR SSI-021(02)
BASED ON A SHIPCHECK CONDUCTED AT CASCADE GENERAL, INC. IN PORTLAND,
OREGON ON OCTOBER 28-30, 2002, FOLLOWING THE DEMILITARIZATION AND
CONVERSION OF THE EX-USNV AGATE PASS (YTT-12) TO A NOAA RESEARCH
VESSEL.
THIS DRAWING SUPERSEDES REFERENCES NO. 1, 2, 3, AND 4.
LIST OF ABBREVIATIONS
BHD
BU
CG
CONT
DC
DF
DO
ENCAP
EM
FC
FCU
FO
FRZR
FS
FW
FXD
GEN
H
LAV
LKR
MSD
NT
PP
REFER
REFRD
SH
SR
SPLY
SWBD
TBL
TK
V
VL
WC
WDO
WT
WTD
XDCR
XFMR
BULKHEAD
BUREAU
CLEANING GEAR
CONTROLLER
DAMAGE CONTROL
DRINKING FOUNTAIN
DIESEL OIL
ENCAPSULATED
EXPANDED METAL
FILE CABINET
FAN COIL UNIT
FUEL OIL
FREEZER
FIRE STATION
FRESH WATER
FIXED
GENERATOR
HATCH
LAVATORY
LOCKER
MARINE SANITATION DEVICE
NON-TIGHT
PUMP
REFRIGERATOR
REFRIGERATED
SHOWER
STATEROOM
SUPPLY
SWITCHBOARD
TABLE
TANK
VENT
VERTICAL LADDER
WATER CLOSET
WINDOW
WATERTIGHT
WATERTIGHT DOOR
TRANSDUCER
TRANSFORMER
COVER SHEET
OUTBOARD PROFILE
INBOARD PROFILE
HOLD LEVEL
MAIN DECK6
SHT TITLE
INDEX
GENERAL DATA
FOC'SLE DECK, 02 LEVEL AND BRIDGE7
DATE APPDDESCRIPTIONITEMZONESHTREV
REVISIONSGENERAL NOTES
2.
YTT 9 CLASS, GENERAL ARRANGEMENTS - DECKS
YTT 9 CLASS, OUTBOARD PROFILE
YTT 9 CLASS, INBOARD PROFILE
YTT 9 CLASS, GENERAL ARRANGEMENTS - HOLD PLAN
801-6500934
801-6500930
5777-005
801-6500933
NO TITLE DRAWING NO
REFERENCES
A 2 10-B 1 ADDED VESSEL CALL LETTERS 1/31/03
RJH
2 10-C 2 MODIFIED VESSEL COMPLEMENT
MODIFIED BRIDGE CONSOLE355-B7
B 3 20-C 1 ADDED 02 HOUSE & 01 DECK EXTENSION 3/11/06
BECI
4 29-C 2
342-C5
6 49-C 4
555-A7
ADDED 02 HOUSE & 01 DECK EXTENSION
MOD STOREROOM 2-7-4-A
ADDED 02 HOUSE & 01 DECK EXTENSION
ADDED 02 HOUSE & 03 DECK EXTENSION
& 01 DECK EXTENSION59-B
60-D
C ALL - 1 GENERAL REVISION AND UPDATE 8/18/06
BECI
SHT OF
SIZE
SCALE:
MARINE ENGINEERS
NAVAL ARCHITECTS
ESSEX, CT 06426
TEL: (860) 767-9061
Seaworthy Systems, Inc.
PREPARED BY:
NOAA DRAWING NUMBERCAGE CODE
CAD FILENAME
REV
A
B
C
D
A
B
C
D
NF-085-001 B
NF085001-2A 2 7
D OYLJ5
AS SHOWN
11 10 9
916 15 14 13 12 11 10
16 15 14 13 12
GENERAL INFORMATION
LAUNCHED
DELIVERED
CONVERTED
CALL LETTERS
BUILDER
HOMEPORT
HULL
SEPTEMBER 1990
JULY 1991
DECEMBER 2002
CASCADE GENERAL INC., PORTLAND, OR
WTER
McDERMOTT SHIPYARDS INC.
AMELIA, LA
CHARLESTON, SC
WELDED STEEL
COMPLEMENT
OFFICERS
CREW
SCIENTISTS
GENERAL CHARACTERISTICS
LENGTH OVERALL
LENGTH BETWEEN PERPENDICULARS
BEAM (MOLDED)
DEPTH TO MAIN DECK (MOLDED)
DESIGN DRAFT
MOLDED DISPLACEMENT (S.W.)
FRAME SPACING
186'-6"
176'-77
16"
40'-0"
16'-0"
10'-6"
1182.37 L.TONS
24"
ENGINEERING
CUMMINS
CUMMINS
ULSTEIN
OMNITHRUSTER
CUMMINS
OUTBOARD MOTOR
NAVIGATION SCIENTIFIC EQUIPMENT
COMMUNICATIONS ACOUSTICS
ELECTRONICS
LAUNCHES & SMALL BOATS
NOTE: ELECTRICAL SERVICE: 450 VAC 3 PHASE, 220 & 120 VAC SINGLE PHASE, 230 VDC, 120 VDC
TYPE PROPULSION LENGTH QTY
TYPE MANUFACTURER PULL/CAPACITY QTY
SATNAV
GMDSS
GYROCOMPASS
RADAR
EPIRB'S
PORTABLE EMERGENCY TRANSCEIVER
EMERGENCY RADIO AUTOALARM
HF TRANSCEIVERS
VHF/FM TRANSCEIVERS
EMERGENCY GENERATOR (450 VAC)
RHIB (AMBAR AM550)
SHIP'S SERVICE GENERATORS (450 VAC)
Z-DRIVE UNIT
MAIN PROPULSION (GEARED DIESEL)
BOW THRUSTER (ELECTRIC)
DOPPLER SPEED LOG
VERTICAL FISH FINDER
MULTIBEAM ECHO SOUNDER (EM1002)
ACOUSTIC DOPPLER CURRENT PROFILER (ADCP)
SHIPBOARD ENVIRONMENTAL
XBT SYSTEM
ACQUISITION SYSTEM (SEAS)
100 KW
395 KW
300 HP
400 HP
1250 BHP/1800 RPM
18.67 FEET 1
DECK MACHINERY
TYPE MANUFACTURER PULL\CAPACITY QTY
AFT CRANE
A-FRAME
J-FRAME
CT WINCH
COM 15 WINCH
APPLETON MARINE
GOODCRANE.COM
ALLIED SYSTEMS
MARKEY
25,000 LBS
10,000 LBS @ 40ft
440 Sq Ft
SEWAGE WASTE CONTROL
OILY WASTE CONTROL
HOLDING CAPACITY
FLOW RATE
MANUFACTURER
SYSTEM TYPE
SYSTEM TYPE
HOLDING CAPACITY
MANUFACTURER
OILY WATER SEPARATOR
VILLAGE MARINE
___GALLONS
__ GPM
OMNIPURE 12MC
CHT WITH MSD
7,500 GALS
DRY LAB
FRESHWATER SYSTEM
TYPE
EVAPORATOR (ALFA-LAVAL)
JWP-16-C40
295 Sq Ft
HABITABILITY
SCIENTIFIC LABORATORY FACILITIES
TOTAL BUNKS ABOARD
MESS
WET LAB
FOUR BUNK ROOMS
DOUBLE STATEROOM
SINGLE STATEROOM
7 CU. METERS/DAYCAPACITY
UNCONTAMINATED SALT WATER SYSTEM
NOAA DRAWING NUMBER REV
CAD FILENAME SHT OFSCALE:
SIZE CAGE CODE
AA
B
C
D D
B
C
NF-085-001 C
NF085001-3C 3 73/16"=12"
D OYLJ5
OUTBOARD PROFILE
SCALE: 3/16" = 1'-0"
1' 2'
6'4' 16'8' 12'
1520 10 5 02530354045505560657075808590 o o o o o o
B L L
B
PROJ
NOAA DRAWING NUMBER REV
CAD FILENAME SHT OFSCALE:
SIZE CAGE CODE
AA
B
C
D D
B
C
NF-085-001 C
NF085001-4A 4 73/16"=12"
D OYLJ5
E X H
.T R U N
K LAUNDRY
CHAIN
LKR EQUIPMENT
FWD HYDRAULIC
AUX. MACHINERY ROOM ENGINE ROOM MULTI-PURPOSE ROOM MSD SEWAGE TANK VOID
THRUSTER SEACHEST
P A S S A G E
W R W C
P A S S A G E
CO SR
BRIDGE
GRATING LEVEL
HOLD DECK
MAIN DECK
FOCSLE DECK
HOLD DECK
CENTERLINE INBOARD PROFILE
WT
BHD BHD
WT
BHD
WT
BHD
WT
BHD
WT
BHD
WT
BULWARK
BULWARK
SCALE: 3/16" = 1'-0"
1' 2'
6'4' 16'8' 12'
MAIN DECK
02 DECK
BRIDGE DECK
03-16-0-C
02-15-0-L
L
02-24-2-L
STAIR
STAIR
01-22-4-L
01-12-0-L
SR (2)
L
L
01-29-2-L
PASSAGESR (4)
01-32-2-L
01-40-2-Q
DC LKR
(GENERALLY LOOKING TO PORT)
1-9-0-Q 1-7-2-Q 1-2-0-E1-12-2-L
SR (4)
1-19-2-L
SR (4)
1-35-2-C
COMPUTER
L
W R W C
L
SR
Q
U P S
R O O M
1-46-2-Q
WORKSHOP
2-46-0-E 1.5-29-2-A 1.5-21-0-W 2-18-0-V 2-12-0-F
TANK
FUEL OIL
BOW THR.
MOTOR COMP.
2-12-0-E
FOREPEAK VOID
2-2-0-V
VOID
2-29-2-V
VOID
2-21-2-V
2-63-0-E
2-83-0-E
STEERING GEAR
PASSAGEWAY
2-79-0-T
POTABLE WATER
2-71-2-W
.5 T
AZIMUTHING THRUSTER P/S
DIRTY OIL TANK
HATCH
HATCH
RUDDER (CL)
JO SR (2)
02-32-2-L
HEAD
02-29-2-L
90 85 80 75 70 65 60 55 50 45 40 3035 25 20 15 10 5 0
BL LB
48x48 HATCH OVER
1.5-36-1-L REFER
1.5-29-0-T
PASSAGE
UP
1.5-29-2-A
MULTI-PURPOSE ROOM
SHELL @ 5'-9" WL
1.5-21-2-L
EXERCISE ROOM
1.5-21-0-W
SEWAGE TANK
1.5-21-1-A
STORES
SHELL @ MAIN DECK
VOID NO. 2 (P)
2-29-2-V(BLW)
CREW'S LOUNGE
FRZ
2-21-2-V(BLW)
VOID NO.1(P)
MSD
2-12-1-F
F.O. TANK NO.3 (S)
VOID NO.2 (S)
2-29-1-V(BLW)
VOID
1.5-18-0-V
FWD
GEAR RM (C)
2-83-0-E
STEERING
POTABLE WTR
TANK (P)
2-71-2-W
FUEL OIL
TANK NO. 2 (S)
2-71-5-F
PASSAGEWAY
2-71-3-T
POTABLE WTR
TANK (S)
2-71-1-W
STOREROOM
2-71-4-A
2-71-6-F
TANK NO. 2 (P)
FUEL OIL
PASSAGEWAY
2-79-0-T
2-83-2-E
STEERING GEAR RM (P)
STEERING GEAR RM (S)
2-83-1-E
C VESSELL
2-80-2-V
VOID
2-80-1-V
VOID
VOID NO. 2 (C)
2-29-0-V(BLW)
SSDG #2
SSDG #3
SSDG #1
MAIN ENGINE
ENGINEERS OPR STA
2-51-2-F
FUEL OIL TK NO.1 (P)
2-46-2-F
FUEL OIL DAY TK (P)
2-48-2-A
2-60-2-A
ENGINEERS STORES
2-57-2-F (UNDER)
LUBE OIL TANK (P)
1.5-57-2-T
ENGINE ROOM EXHAUST TRUNK (P)
FUEL OIL DAY TK (S)
2-46-3-F
FUEL OIL TK NO.1 (S)
2-51-1-F
BILGE MANIFOLD
BILGE PP NO.3
BILGE PP NO.4
L.O. PP, DIRTY OIL PP
A/C UNIT
B
IL
G E
M A N
IF
O L D
2-46-1-C
SWITCHBOARD
ERC
CONSOLE
FIRE PP
POTABLE WTR TK
SPARE
PARTS RM
ELECTRICAL
ROOM
2-48-1-Q
O.W.S.
FUEL OIL TRANSFER MANIFOLD
FUEL OIL PURIFIER
L.P. AIR
COMPRESSORS
OILY BILGE TANK (S)
2-57-1-W (UNDER)
ENGINE ROOM ESCAPE/EXHAUST TRUNK (S)
1.5-57-2-T
A
IR
R C V R
DIRTY OIL TK
SW/JW PLATE
HEAT EXCHANGER
ENGINE ROOM
2-46-0-E
2-2-0-V
FOREPEAK VOID
VOID NO.1(S)
2-21-1-V(BLW)
REFR
COMPRESSORS
F.O. TANK NO.3 (P)
2-12-2-F
2-12-0-E
MOTOR COMPT
BOW THRUSTER
S.W./GNL.
SVC. PUMP
BROMINATOR
J.W.
EVAP
J.W. CIRC
PUMP
EDUCTOR
PUMP
POTABLE WTR
PRESS. SET
FIRE
PUMP
HEAVY LIFT
CAPSTAN HPU
DIVING AIR
COMPRESSOR
SCBA RACK
UP
UP
SPACE HTR
PLAN VIEW, HOLD
SCALE: 3/16" = 1'-0"
SCALE: 3/16" = 1'-0"
1' 2'
6'4' 16'8' 12'
V L
VL
V L
SLIDING
WTD
SLIDING
WTD
Z-DRIVE
UNIT
MOTOR
HPU
BLOWER
HTR
HTR
BLOWER
HPU
MOTOR
UNIT
Z-DRIVE
VL
2-63-0-E
AUXILIARY MACHINERY ROOM
F.S. #8
WTD
WTD
MOON POOL/
DROP TUBE
NOAA DRAWING NUMBER REV
CAD FILENAME SHT OFSCALE:
SIZE CAGE CODE
AA
B
C
D D
B
C
NF-085-001 C
NF085001-5A 5 73/16"=1'
D OYLJ5
DN
90 85 80 75 70 6065 55 50 45 40 35 30 25 20 15 10 5 0
1-19-2-L
MESS AREA
1-18-1-Q
PLAN VIEW, MAIN DECK
SCALE: 3/16" = 1'-0"
GALLEY
1-28-1-Q
1-27-1-A
STORES
1-15-0-L
PASSAGE
WR/WC
1-31-2-L
1-24-2-A
SUPPLY
SR (4)
1-24-4-L
SR (4)
RECIRC. PP
FCSLE DK (OVER)
FWD
1-12-1-Q
SHIP'S OFFICE
1-15-1-E
WTR HTR &
SR (4)
1-12-2-L
1-9-0-Q
LAUNDRY
LC VESSEL
UP
1-9-2-V
VOID
MED LKR
1-9-1-A
1-7-2-A
CHAIN LOCKER
1-7-1-A
CHAIN LOCKER
FWD HYDRAULIC EQUIPMENT RM
1-2-0-E
1-57-1-T
ACCESS
UP
BOAT & DECK
1-58-2-A
GEAR LOCKER
1-43-1-C
WET LAB DRY LAB
1-34-1-C
DN
DN
1-46-4-Q
WORKSHOP
ENGRG OFF
1-43-2-Q
FLUSH HATCH
48x48
1-35-2-C
COMPUTER CTR
HPU
AFT CRANE
PASSAGE
1-61-1
DN
MOON POOL
"J" FRAME
DBL BERTH
DBL BERTH
DBL BERTH
DBL BERTH
DBL BERTH
DBL BERTH
SCALE: 3/16" = 1'-0"
1' 2'
6'4' 16'8' 12'
DOUBLE BITT (P/S)
PANAMA CANAL CHOCK (P/S)
PANAMA
CANAL
CHOCK
(P/S)
TIE-DOWN (TYP.)
STORES
AFFF TANK
SH
SH SH
WC
WC
LKR
LKR
D E S K
D E S K
D E S
KD
E S K
L K R
L K R
LKR
L K R
DESK
DESK
1-20-1-A
SAFE
D E S K
SH
ELV
ES
F.S. #6
F.S. #7
1-46-2-E
NOAA DRAWING NUMBER REV
CAD FILENAME SHT OFSCALE:
SIZE CAGE CODE
AA
B
C
D D
B
C
NF-085-001 C
NF085001-6C 6 73/16"=1'
D OYLJ5
"A" FRAME
W O R K
B E N C H
CABINETS
SCUBA
BOTTLE
RACK
COUNTER D
E S K
LKR ICE
MACHINE
FLASH
FREEZER
CHEST
FREEZER
EQMT
RACK
COUNTER
C O U N T E R
COUNTER
EQMT
RACK
EQMT RACK
DESK FC FC
D E S K
SODA
MACH
90 85 80 75 70 6065 55 50 45 40 35 30 25
15 10 5 0
W
D
W
D
| NF085001 March 2010 (1).pdf |
| Layout1 |
| NF085001-2B.pdf |
| Layout1 |
| NF085001-3C.pdf |
| Outboard Profile |
| NF085001-4C.pdf |
| INBOARD PROFILE |
| NF085001-5C.pdf |
| all |
| NF085001-6C.pdf |
| all |
| NF085001-7C.pdf |
| all |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Yes |
| Check Box5: Yes |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Yes |
| Text12: A0005 |
| Text13: 12/20/2022 |
| Text14: NM-AN2120-22-01727 |
| Text16: 1 |
| Text17: 10 |
| Text18: AJ930073 |
| Text19: NOAA/ERAD |
200 GRANBY STREET
NORFOLK, VA 23510
Jessica Loftus Jessica.Loftus@noaa.gov
| Text20: See Block 6 |
| Text21: |
| Text22: 1305M223QNMAN01727 |
| Text23: 11/14/2022 |
| Text24: |
| Text25: |
| Text26: 1 |
| Text27: 1 |
| Text28: Telescoping Crane for the NOAA Ship Nancy Foster |
This amendment is being issued to answer inquiries from Interested Parties and to include a requested drawing.
| Text29: |
| Text30: Andrew Northcutt |
| Text31: 12/20/2022 |
| Text32: |
File details come from the government source that posted it. Updated .